← As quedas de energia que acompanhamos

YPS / NOTÍCIAS SOBRE QUEDAS DE ENERGIA

Quedas de energia.
Em contexto.

Os avisos, as fontes e o que vem a seguir. Acompanhe o que se sabe e o que ainda não está claro.

As histórias por trás dos avisos

422 avisos nesta seleção

Illustrated drawer containing household emergency supplies
Ilustração de IA

Áustria / Pruggern

Evidência antiga

Niederöblarn–Aich power interruption followed paraglider incident

Styrian police report that a paraglider incident involving a high-voltage line was followed by an electricity interruption between Niederöblarn and Aich in Austria on 28 October 2026. The authority describes an interruption lasting approximately one hour, until around 18:00 CET. Repairs to the line continued later, separately from the reported return of electricity.

Styrian police report the 28 October interruption between Niederöblarn and Aich ended around 18:00 CET; line repairs continued later.

Verificado pela YPS: 29 de out. de 2026, 16:22 UTC

Illustration comparing a power bank with a portable power station
Ilustração de IA

Austrália / Alice Springs · Central Australia

Status atual desconhecido

Alice Springs power outage: operator reports 12 properties awaiting reconnection

Power and Water’s 19 October 2026 statement says 12 properties remain without electricity in Alice Springs following the Central Australia storm response. All require a Certificate of Compliance before reconnection, and some need extensive repairs. This is a dated operator report, rather than confirmation of the supply position at those properties on 24 October.

19 October statement: 12 Alice Springs properties remain without power and require a Certificate of Compliance before reconnection; later address-level status unconfirmed.

Verificado pela YPS: 24 de out. de 2026, 13:39 UTC

A wooden drawer holding a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Austrália / Batchelor

Evidência antiga

Batchelor power outage: crews removing trees from power lines

Power and Water reports an electricity outage affecting Batchelor and attributes it to a lightning storm. In its 22:00 update, the operator says crews are continuing to remove trees from power lines. The next update is scheduled for 06:00; the restoration time and affected customer total remain unknown.

15 October, 22:00 ACST: Power and Water reports continuing tree removal from power lines; next update 06:00, restoration time unknown. Date and ACST inferred from the incident row and location; next morning inferred from the sequence.

Verificado pela YPS: 15 de out. de 2026, 19:32 UTC

A laptop, a slim power bank and a portable power station on a table beside a lamp
Ilustração de IA

Austrália / Darwin

Evidência antiga

Darwin power outage: operator reports supply restored in three suburbs

Power and Water reports that electricity was restored at 10:20 ACST on 19 October 2026 after a network outage affecting customers in Wanguri, Wagaman and Casuarina in Darwin. The operator marks the incident Resolved. Its earlier 11:00 ACST restoration estimate has been superseded by that report; the affected customer count and technical cause remain unknown.

Power and Water reports power restored at 10:20 ACST on 19 October in Wanguri, Wagaman and Casuarina and marks the incident Resolved.

Verificado pela YPS: 19 de out. de 2026, 03:38 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Austrália / Mildura and surrounding communities

Status atual desconhecido

Mildura power outage: Powercor lists 4,059 customers affected

Powercor lists an unplanned power outage affecting 4,059 customers in Mildura and surrounding communities in its map snapshot displayed as 27 October 2026, 11:44 am. The operator identifies Lilley Drive, Mildura, as the fault location and says crews are attending. Its estimated restoration time is 13:00 on 27 October; completion has not been confirmed.

Powercor lists 4,059 customers affected around Mildura; crews attending, with 13:00 on 27 October an unconfirmed restoration estimate.

Verificado pela YPS: 27 de out. de 2026, 11:56 UTC

An open drawer with supplies for a power outage.
Ilustração de IA

Austrália / Gununa, Mornington Island

Evidência antiga

Mornington Island power outage: Ergon lists repair work as delayed

Ergon Energy’s latest checked outage listing shows repair work delayed near Gununa on Mornington Island. The ticket still lists 170 affected customers and an estimated fix time of noon AEST on Tuesday, 17 November. Restoration has not been confirmed.

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 17 de nov. de 2026, 02:32 UTC

A drawer with a torch and other power outage supplies.
Ilustração de IA

Austrália / New South Wales

Evidência antiga

NSW storm power outages: about 810 customers still without power

About 810 Essential Energy customers remained without power at 4 pm AEDT on Thursday, 12 November, after storms affected the Mid North Coast and Northern Rivers in New South Wales. The distributor reported about 3,855 customers without power at 6:30 am and more than 9,000 affected at the Wednesday evening peak.

Essential Energy reported about 810 customers still without power at 4 pm AEDT on 12 November and expected some outages to continue overnight.

Verificado pela YPS: 12 de nov. de 2026, 08:42 UTC

A drawer with a torch and other power outage supplies.
Ilustração de IA

Austrália / South East Queensland

Evidência antiga

South East Queensland power outages: Energex lists 1,076 affected

Energex listed 1,076 customers affected by emergency power outages across South East Queensland at 2:15 pm AEST on 14 November. The regional list covers all emergency causes. In a separate update on 13 November, the utility said more than 90% of customers affected by the storms had power back.

Energex listed 1,076 affected customers across regional emergency outages of all causes at 2:15 pm AEST on 14 November. Full storm restoration remains unconfirmed.

Verificado pela YPS: 15 de nov. de 2026, 10:48 UTC

Emergency supplies arranged inside an open drawer
Ilustração de IA

Bangladesh / Dhaka and Chattogram

Evidência antiga

Dhaka and Chattogram power outage: partial recovery reported

Local reporting on 27 October describes an electricity disruption in parts of Dhaka and Chattogram linked to the Meghnaghat-Haripur transmission line. Bangladesh Power Division reports most places reconnected and work continuing elsewhere, but its homepage notice is undated. The evidence does not establish current supply at every affected address or complete household restoration.

Partial recovery reported in parts of Dhaka and Chattogram; current address-level supply and complete restoration unverified.

Verificado pela YPS: 29 de out. de 2026, 04:56 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Bélgica / Zottegem

Evidência antiga

Zottegem power outage: broad restoration reported after regional disruption

Electricity returned to much of Zottegem after a regional power outage on 5 November 2026, according to the city. Its account places the interruption around 08:50 local time and broad restoration around 10:30. The final supply status of some locations and private business installations remains unresolved.

Broad restoration reported by Zottegem; complete regional restoration and individual address supply remain unverified.

Verificado pela YPS: 6 de nov. de 2026, 08:15 UTC

Uma gaveta de madeira com lanterna de cabeça, lampião, carregador portátil, rádio e caderno.
Ilustração de IA

Brasil / Rio de Janeiro state

Evidência antiga

Enel Rio informa 95% de restabelecimento de energia após temporal do fim de semana

A Enel Rio informou que havia restabelecido a energia para 95% dos clientes atingidos pelo temporal em sua área de concessão até as 12:00 (horário de Brasília) de segunda-feira, 9 de novembro. A distribuidora citou Magé, Duque de Caxias e São Gonçalo como os municípios com mais clientes ainda afetados.

A Enel Rio informou restabelecimento de 95% até as 12:00 (horário de Brasília) de 9 de novembro.

Verificado pela YPS: 9 de nov. de 2026, 16:31 UTC

Uma gaveta de madeira aberta com lanterna de cabeça, lampião, carregador portátil, rádio e papel
Ilustração de IA

Brasil / Maringá

Status atual desconhecido

Falta de energia em Maringá: Copel informa cerca de 84.500 imóveis com energia

Em seu boletim identificado como de 7 de novembro, 07:00, a Copel informa que cerca de 84.500 imóveis voltaram a ter energia, de aproximadamente 88.000 que tiveram interrupções após o tornado em Maringá. A concessionária também informa cerca de 3.400 residências ainda aguardando religação. A página exibe uma data de atualização conflitante; por isso, o horário exato desse retrato da situação não está claro.

A Copel informa religações em andamento em seu boletim da manhã de 7 de novembro; o fornecimento atual em endereços específicos não foi verificado.

Verificado pela YPS: 7 de nov. de 2026, 13:43 UTC

Ilustração de uma gaveta com suprimentos de emergência para falta de energia
Ilustração de IA

Brasil / Minas Gerais

Evidência antiga

Falta de energia em Minas Gerais: 32.121 imóveis seguem sem luz, segundo a Itatiaia

A Itatiaia informa, em 27 de outubro de 2026, citando a Cemig, que 32.121 imóveis continuam sem energia elétrica em Minas Gerais após a tempestade de 25 de outubro. A reportagem também informa que aproximadamente 607.000 de cerca de 640.000 clientes afetados foram religados. O horário exato de apuração da distribuidora não é informado, e a reportagem usa unidades diferentes para o total ainda sem energia e para o total de religados.

A Itatiaia, citando a Cemig em 27 de outubro, informa que 32.121 imóveis continuam sem energia elétrica em Minas Gerais; não há horário verificado para o restabelecimento total.

Verificado pela YPS: 27 de out. de 2026, 11:56 UTC

Uma gaveta de madeira aberta com uma lanterna de cabeça, um lampião, um power bank, um rádio e papel
Ilustração de IA

Brasil / Paraná

Evidência antiga

Falta de energia após temporal no Paraná: Copel informa cerca de 6.300 unidades consumidoras ainda sem luz

A Copel informou cerca de 6.300 unidades consumidoras de energia elétrica ainda sem fornecimento em todo o Paraná em seu boletim das 18h00 (horário de Brasília) de segunda-feira, 9 de novembro. A distribuidora disse ter restabelecido a energia de 99% das unidades consumidoras afetadas no pico do temporal. O boletim não informou um horário para a volta da energia a todos os clientes afetados.

Em seu boletim das 18h00 (horário de Brasília) de 9 de novembro, a Copel informou cerca de 6.300 unidades consumidoras ainda sem energia em todo o estado. A distribuidora não informou um horário para o restabelecimento completo no estado.

Verificado pela YPS: 9 de nov. de 2026, 22:31 UTC

Suprimentos de emergência e equipamentos reserva organizados em uma gaveta
Ilustração de IA

Brasil / Tijucas do Sul

Evidência antiga

Falta de energia em Tijucas do Sul motiva protesto na BR-376

Um protesto contra as faltas de energia bloqueou parcialmente a BR-376 no km 657, em Tijucas do Sul, no Paraná, em 10 de novembro. Em nota divulgada pela Band Paraná, a concessionária Copel afirmou que trabalhava para religar 75 unidades consumidoras no município no início da noite. As reportagens analisadas não confirmam que essas ligações foram restabelecidas.

A Copel informou trabalho para religar 75 unidades consumidoras em Tijucas do Sul. O restabelecimento não foi confirmado.

Verificado pela YPS: 11 de nov. de 2026, 00:15 UTC

An open drawer holding a flashlight, batteries and supplies for an outage.
Ilustração de IA

Canadá / Anacla and South Bamfield Road

Evidência antiga

BC Hydro lists power restored near Anacla and South Bamfield Road

BC Hydro’s restored outage list records power back at 07:51 PST on 11 November for a row covering 439 customers near Anacla Village and South Bamfield Road. The row has no ticket number. Its start time, customer count, Port Alberni label and overlapping addresses match the earlier active listing for incident 2864176.

BC Hydro’s matched row records 439 customers and restoration at 07:51 PST on 11 November.

Verificado pela YPS: 11 de nov. de 2026, 18:26 UTC

A drawer with a flashlight and other power outage supplies.
Ilustração de IA

Canadá / Bamfield and Anacla Village

Evidência antiga

Bamfield and Anacla power outage: BC Hydro reports power restored

BC Hydro lists power restored at 8:07 a.m. PST on Friday, November 13, after an outage affecting 439 customers in the Bamfield and Anacla Village area. The restored entry matches the locations, start time and customer count on the earlier active listing for ticket 2866955.

BC Hydro lists power restored at 8:07 a.m. PST on November 13 for the outage affecting 439 customers in the Bamfield and Anacla Village area.

Verificado pela YPS: 13 de nov. de 2026, 16:18 UTC

Drawer holding a flashlight, batteries and other power outage supplies.
Ilustração de IA

Canadá / Surrey and Langley

Evidência antiga

Surrey and Langley power restored after tree fell across wires, BC Hydro says

BC Hydro recorded power restored at 23:52 Pacific on November 9 for an outage that affected 5,100 customers in parts of Surrey and Langley. The utility’s restored outage list attributes the interruption to a tree that fell across its wires.

BC Hydro recorded restoration at 23:52 Pacific on November 9 for the outage that affected 5,100 customers.

Verificado pela YPS: 10 de nov. de 2026, 10:50 UTC

A drawer with a flashlight and other supplies for power outages
Ilustração de IA

Canadá / Southern Gulf Islands, British Columbia

Evidência antiga

Gulf Islands power outage: BC Hydro listed 4,484 customers without power

BC Hydro listed 4,484 customers without electricity in parts of Mayne, Pender and Saturna islands in its 04:16 PST dashboard snapshot on 11 November. The utility showed a crew on site and the cause under investigation. It gave no estimate for when power would return.

BC Hydro listed 4,484 customers without power across parts of three islands at 04:16 PST on 11 November.

Verificado pela YPS: 11 de nov. de 2026, 12:25 UTC

A drawer with a flashlight and other supplies for power outages
Ilustração de IA

Canadá / Qualicum Beach, British Columbia

Evidência antiga

Qualicum Beach power outage: BC Hydro lists restoration at 11:52 PST

BC Hydro lists a Qualicum Beach power outage as restored at 11:52 PST on 11 November. The restored entry matches an earlier outage that the utility said affected 1,774 customers after a tree came down across its wires. The restored entry has no ticket number; the match comes from the start time, road boundaries, customer count and cause.

BC Hydro lists the matching Qualicum Beach outage as restored at 11:52 PST.

Verificado pela YPS: 11 de nov. de 2026, 21:31 UTC

A drawer with a flashlight and other supplies for power outages
Ilustração de IA

Canadá / Surrey, British Columbia

Evidência antiga

Surrey power outage: BC Hydro estimates power back by 07:50 PST

BC Hydro listed 2,820 customers without electricity in part of Surrey, British Columbia, in its 05:16 PST dashboard snapshot on 11 November. The utility showed a crew on site and estimated restoration at 07:50 PST. The cause remained under investigation.

BC Hydro showed 2,820 customers without power in part of Surrey at 05:16 PST and estimated restoration at 07:50 PST.

Verificado pela YPS: 11 de nov. de 2026, 13:26 UTC

An open wooden drawer with a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Canadá / British Columbia

Status atual desconhecido

Storm outages: Most main lines near Prince George restored

BC Hydro said on 11 November that most main power lines in and around Prince George were back in service after a series of storms. Crews were still working on smaller pockets of outages and sites with extensive damage. The utility said new outage reports were coming in as winds returned.

BC Hydro reported most main lines near Prince George restored on 11 November; it gave no new remaining customer count in that bulletin.

Verificado pela YPS: 11 de nov. de 2026, 23:31 UTC

An open drawer with a flashlight, batteries and other supplies for a power outage.
Ilustração de IA

Canadá / Tofino and Ucluelet

Evidência antiga

BC Hydro records power restored after Tofino and Ucluelet outage

BC Hydro recorded power restored to four groups of customers around Tofino and Ucluelet between 17:27 and 17:37 Pacific on 9 November. The four entries match the areas, start times and customer counts of the outage the utility said affected 4,951 customers earlier that day.

BC Hydro recorded all four original Tofino and Ucluelet outage entries as restored on 9 November.

Verificado pela YPS: 10 de nov. de 2026, 02:35 UTC

Canadá / Zeballos and Ehattesaht First Nation

Evidência antiga

Zeballos and Ehattesaht First Nation

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 16 de nov. de 2026, 19:21 UTC

Illustration of household backup supplies arranged in a drawer.
Ilustração de IA

Canadá / Newfoundland

Evidência antiga

Newfoundland power outage: NL Hydro reports service restored after line trip

A transmission line trip interrupted power for pockets of customers on the Newfoundland island grid on Friday, 13 November. NL Hydro said it restored service to everyone affected by the event in about 30 minutes. The operator did not give a customer total.

NL Hydro confirmed restoration for customers affected by the transmission line trip.

Verificado pela YPS: 14 de nov. de 2026, 04:29 UTC

Headlamp, lantern, power bank and radio arranged in a wooden drawer
Ilustração de IA

Canadá / Okotoks, Alberta

Status atual desconhecido

Okotoks power outages: FortisAlberta responding, town says

The Town of Okotoks says FortisAlberta is responding to intermittent power outages across Okotoks, Alberta. Its notice dated 27 October 2026 says the initial outage was reported at approximately 2:22 p.m. The affected addresses, customer count and incident-specific restoration deadline remain unknown.

The town reports intermittent outages across Okotoks and a FortisAlberta response; no verified all-clear.

Verificado pela YPS: 28 de out. de 2026, 06:19 UTC

Illustrated drawer holding emergency supplies for a power outage
Ilustração de IA

Chile / Requínoa

Evidência antiga

Requínoa power outage: CGE reports repairs to tornado-damaged infrastructure

CGE says crews are repairing tornado-damaged electricity infrastructure on Avenida Comercio in Requínoa, Chile. The operator separately reports service normalisation in five named sectors. The relationship between those notices is unresolved, so the later announcement does not establish completion of the Avenida Comercio repairs or restoration across all of Requínoa.

CGE reports repairs on Avenida Comercio; completion is not verified by the separate five-sector restoration notice.

Verificado pela YPS: 27 de out. de 2026, 13:56 UTC

Illustrated drawer holding emergency supplies for a power outage
Ilustração de IA

Chile / Talca

Evidência antiga

Talca power outage: CGE reports storm repairs on Camino Las Rastras

CGE says its crews are repairing storm-damaged electricity infrastructure on Camino Las Rastras in Talca, Chile. The operator’s statement was published on 27 October 2026 at 03:18:40 UTC. It confirms repair work at that location, but does not establish the exact outage onset, the local customer total or a completion time.

CGE reports storm repairs on Camino Las Rastras; local repair completion remains unverified.

Verificado pela YPS: 27 de out. de 2026, 14:55 UTC

An open drawer with supplies for a power outage.
Ilustração de IA

Colômbia / Caquetá, Colombia

Evidência antiga

Caquetá power outage: limited supply resumes after another line trip

ElectroCaquetá reported that some sectors in Caquetá regained electricity at lower capacity after the Hobo–Altamira link tripped on Monday, 16 November. The operator said supply continues in turns as capacity allows. It gave no time for full restoration.

ElectroCaquetá reports limited supply in turns after the latest trip.

Verificado pela YPS: 17 de nov. de 2026, 00:29 UTC

An open drawer with a flashlight, batteries and other emergency supplies.
Ilustração de IA

Cuba / Granma province

Status atual desconhecido

Granma power outage: province reconnects to Cuba’s grid after line trip

Empresa Eléctrica de Granma said Granma province reconnected to Cuba’s national grid on Friday, 13 November, after a trip on the 110 kV link with Santiago de Cuba. In its follow-up, the utility said work to restore supply to critical facilities and the longest-affected circuits was still under way.

Granma’s grid connection was restored on 13 November; full restoration of local supply was unconfirmed.

Verificado pela YPS: 15 de nov. de 2026, 04:46 UTC

A drawer with a torch and other power outage supplies.
Ilustração de IA

Cuba / Havana

Evidência antiga

Havana power cuts: Utility reports more circuit changes

Empresa Eléctrica de La Habana reported new cuts due to a generation shortfall and separate circuit restorations on Friday, 13 November. Its latest comparable citywide reading was 312 MW of affected load across 126 circuits at 03:03 Havana time. The later notices describe individual circuits.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 16 de nov. de 2026, 14:12 UTC

Flashlight, batteries and other emergency supplies in a drawer.
Ilustração de IA

Cuba / Havana, Cuba

Evidência antiga

Havana power outage: utility reports circuit restorations after frequency trip

Empresa Eléctrica de La Habana reported that an automatic frequency trip interrupted power on circuits serving parts of Old Havana, Centro Habana and Cerro on Sunday, 15 November. Two utility updates listed circuits brought back into service. They did not confirm that all affected circuits had been restored.

The distributor reported selected circuit restorations after the trip; full restoration is unconfirmed.

Verificado pela YPS: 16 de nov. de 2026, 04:02 UTC

Illustration comparing a power bank with a portable power station
Ilustração de IA

Cuba / Santa Cruz del Norte

Evidência antiga

Cuba: Santa Cruz plant unit went offline after 16 October fire

Cuba’s Unión Eléctrica (UNE) reported unit 1 of the Ernesto Guevara power plant offline because of a fire on 16 October 2026. The plant is in Santa Cruz del Norte, Mayabeque. The report confirms a generating-unit shutdown; its effect on household electricity supply has not been quantified.

UNE reported unit 1 offline on 16 October; current operating status and return to service remain unconfirmed.

Verificado pela YPS: 18 de out. de 2026, 14:23 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Tchéquia / Prague

Evidência antiga

Prague power outage: lift rescues and parliament disruption reported

A morning power outage affected Prague 5, Prague 6 and part of Prague 1 on 6 November 2026. Czech Radio reports five lift-rescue responses and an interruption to parliament. Its news report attributes an approximate total of 70,000 affected supply points and restoration before 11:00 Central European Time (CET) to PRE.

PRE reported restoration before 11:00 CET on 6 November, according to Czech Radio; present supply at individual addresses has not been independently checked.

Verificado pela YPS: 6 de nov. de 2026, 20:27 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Alemanha / Schmellwitz, Cottbus

Evidência antiga

Cottbus outage: power restored in Schmellwitz on 7 November

Stadtwerke Cottbus says power was restored by 19:31 CET on 7 November 2026 to all households affected by the outage in Schmellwitz, a district of Cottbus in Brandenburg. The utility traced the start of the incident to a medium-voltage fault in the EVC network at 17:30 CET. It reported a second fault during switching at 18:45 CET.

Stadtwerke Cottbus confirmed restoration for all affected households by 19:31 CET on 7 November.

Verificado pela YPS: 8 de nov. de 2026, 02:02 UTC

Emergency preparation supplies arranged in a drawer
Ilustração de IA

Alemanha / Schmellwitz, Cottbus

Status atual desconhecido

Cottbus-Schmellwitz power restored after outage affecting about 2,000 connections

Stadtwerke Cottbus says all connections affected by a power outage in Schmellwitz were supplied again by 08:50 CET on 30 October 2026. Around 2,000 network connections were affected after a fault in the medium-voltage network of Elektroenergieversorgung Cottbus GmbH at 08:18. An earlier fault had occurred in the medium-voltage network of a customer installation at 07:50.

Stadtwerke Cottbus says all affected Schmellwitz connections were supplied again by 08:50 CET on 30 October.

Verificado pela YPS: 30 de out. de 2026, 19:41 UTC

Open wooden drawer containing a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Alemanha / Altona-Altstadt and St. Pauli, Hamburg

Evidência antiga

Hamburg power outage: operator reports Altona-Altstadt and St. Pauli interruption resolved

Hamburger Energienetze reports that a power interruption affecting parts of Altona-Altstadt and St. Pauli in Hamburg was resolved at 00:23 CEST on 22 October 2026. The operator’s notices identify the two districts. The exact starting time, cause, duration and number of affected customers remain unknown.

Hamburger Energienetze reports the interruption in parts of Altona-Altstadt and St. Pauli resolved at 00:23 CEST on 22 October 2026.

Verificado pela YPS: 22 de out. de 2026, 00:46 UTC

A wooden drawer containing a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Alemanha / Hamburg

Evidência antiga

Hamburg-Eimsbüttel power outage: operator reports restoration

Hamburger Energienetze says the electricity interruption in Hamburg-Eimsbüttel was resolved from 13:25 CEST on 22 October 2026. The operator had earlier reported repair work in progress and an approximate 14:30 CEST estimate. Its later restoration notice supersedes that estimate; the available evidence does not establish the cause or number of affected customers.

Hamburger Energienetze reports the Eimsbüttel interruption resolved from 13:25 CEST on 22 October 2026.

Verificado pela YPS: 22 de out. de 2026, 15:56 UTC

Open wooden drawer holding a headlamp, lantern, power bank, cables and radio
Ilustração de IA

Alemanha / Western Schleswig-Holstein

Evidência antiga

Schleswig-Holstein power cuts: network broadly restored, SH Netz says

SH Netz says electricity supply was generally restored from 17:00 CEST on 18 October 2026 after interruptions in western Schleswig-Holstein. Its evening statement still allows for isolated supply problems. The report therefore does not establish restoration at every address after a morning outage and a later fault at Linden substation.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 23 de out. de 2026, 01:11 UTC

Emergency preparation items arranged in a drawer
Ilustração de IA

Alemanha / Sylt · Westerland and Tinnum

Evidência antiga

Sylt power outage: NDR reports restoration in Westerland and Tinnum

NDR reports that the power outage affecting parts of Westerland and Tinnum on Sylt was resolved around 15:00 CEST on Wednesday, 7 October. A municipal notice dated the same day had warned of outages in parts of Westerland and temporarily unreachable island administration sites. Their reopening time has not been confirmed.

NDR reports restoration around 15:00 CEST on 7 October; individual-address supply and municipal reopening are not independently confirmed.

Verificado pela YPS: 8 de out. de 2026, 00:25 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Alemanha / Torgau

Evidência antiga

Torgau power outage: broad restoration, Repitz uncertainty remains

Stadtwerke Torgau reports that a cable fault interrupted electricity in Torgau and surrounding network areas on 4 November 2026. The operator records an interruption from 13:16 to 14:47 local time for the broadly restored area. Its 16:14 update retains a possible exception for Repitz, so restoration at every address remains unconfirmed.

Broad restoration reported; the operator’s 16:14 update retains possible longer restrictions in Repitz. Complete restoration remains unconfirmed.

Verificado pela YPS: 6 de nov. de 2026, 02:20 UTC

Illustration comparing a power bank with a portable power station
Ilustração de IA

Alemanha / Waldenbuch

Evidência antiga

Waldenbuch power outage: supply restored

The utility Stadtwerke Tübingen reports that its technical service restored electricity after an overnight outage affected around 270 house connections in parts of Waldenbuch, including the Bonholz industrial area. The reported interruption ran from 01:15 to 02:20 on 15 October 2026. The cause remains under investigation.

15 October: Supply restored after an overnight interruption affecting around 270 house connections in parts of Waldenbuch, according to the utility; cause under investigation.

Verificado pela YPS: 15 de out. de 2026, 22:39 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Alemanha / Wuppertal

Evidência antiga

Wuppertal Schwebebahn resumes service after power outage

Wuppertal’s Schwebebahn resumed scheduled operation around 05:00 on 28 October 2026 after a power interruption and passenger evacuation, WDR reports, citing WSW. Technicians restored the rail power connection around 04:00. The later account attributes the interruption to a short circuit in the electrical line at Völklinger Straße; 24 passengers were evacuated without injuries.

WDR, citing WSW, reports Schwebebahn service resumed around 05:00 on 28 October after rail power restoration around 04:00; no household outage established.

Verificado pela YPS: 28 de out. de 2026, 09:30 UTC

Open drawer with a flashlight and other power outage supplies.
Ilustração de IA

Equador / Guayaquil

Evidência antiga

Guayaquil power outage: vehicle hits pole in Gallegos Lara

CNEL reported a power outage in Cooperativa Gallegos Lara, Guayaquil, on Friday, 13 November, after a vehicle struck a utility pole at Calle 18 and Primer Pasaje. Technicians responded to replace the pole and repair damaged overhead cables.

CNEL reported a repair response in Cooperativa Gallegos Lara. It did not confirm restoration.

Verificado pela YPS: 14 de nov. de 2026, 04:29 UTC

Backup-power equipment arranged in a storage drawer
Ilustração de IA

Equador / Cdla. Girasol, Guayaquil

Evidência antiga

Guayaquil power outage: CNEL reports Girasol sector restored

CNEL EP says it has restored electricity throughout the sector around block 103 in Cdla. Girasol, Guayaquil, after replacing a damaged distribution transformer. In its 2 November 2026 notice, the operator attributes the damage to heavy rain and atmospheric discharges. The report concerns this named sector in Ecuador; it does not establish electricity conditions throughout Guayaquil. No outage start time, duration or affected customer total is given.

CNEL EP reports electricity restored throughout the Girasol block 103 sector after transformer replacement; exact outage and physical restoration times remain unknown.

Verificado pela YPS: 2 de nov. de 2026, 17:12 UTC

Open drawer with a flashlight and other power outage supplies.
Ilustração de IA

Equador / Quevedo, Los Ríos

Evidência antiga

Southern Quevedo power outage: CNEL reports a substation issue

CNEL reported a power outage in southern Quevedo on Friday, 13 November, after a substation issue amid rain and frequent lightning. The utility said technicians were travelling to diagnose the fault and gave no restoration estimate.

CNEL said technicians were travelling to diagnose the southern Quevedo outage. It gave no restoration estimate.

Verificado pela YPS: 13 de nov. de 2026, 22:22 UTC

A laptop, a slim power bank and a portable power station on a table beside a lamp
Ilustração de IA

Equador / Quito

Evidência antiga

Quito power outage: EEQ reports restoration after rain and lightning

Empresa Electrica Quito reports that electricity was restored in several named parts of Quito after heavy rain accompanied by lightning on 18 October 2026. The utility says operational staff carried out corrective work. Its statement identifies specific sectors and roads; the affected-customer total and exact restoration time remain unknown.

Empresa Electrica Quito reports restoration in the named Quito sectors after rain and lightning on 18 October; individual address recovery has not been independently audited.

Verificado pela YPS: 19 de out. de 2026, 07:39 UTC

An open wooden drawer holding a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Espanha / Ceuta

Evidência antiga

Ceuta power outage: restoration reported after interconnection trip

Electricity restoration has been reported in Ceuta after a 21 October 2026 incident disconnected its interconnection cables and interrupted supply to nearly the entire market. Red Eléctrica says the high-voltage system was completely connected from 10:34 local time. Endesa separately says all affected customers were restored by that time, in a statement reproduced by Ceuta Actualidad.

Red Eléctrica reports complete high-voltage connection from 10:34 local; Endesa reports affected customers restored. Causal chain under investigation.

Verificado pela YPS: 21 de out. de 2026, 11:19 UTC

An open wooden drawer holding a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Espanha / La Palma

Evidência antiga

La Palma blackout: Red Eléctrica reports supply restored

Red Eléctrica reports that electricity supply on La Palma in Spain’s Canary Islands was restored at 10:26 island time on 2 November 2026. The Canary Islands government had reported a complete loss of supply at 06:42 and activated the PLATECA emergency plan at alert level from 07:30. The underlying cause and exact affected-customer total remain unverified.

Red Eléctrica reports La Palma electricity supply restored at 10:26 island time on 2 November; root cause remains unverified.

Verificado pela YPS: 6 de nov. de 2026, 08:15 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Espanha / Tenerife

Evidência antiga

Tenerife power outage: reports cite Red Electrica on recovery

Europa Press reports that all affected electricity supply in the Tenerife-La Gomera system was restored on 1 November 2026, citing Red Electrica sources. RTVC also reports Tenerife restoration via the operator. The underlying operator statement has not been directly checked, and these system-level reports do not independently establish supply at individual addresses.

Europa Press reports recovery of all affected Tenerife-La Gomera system supply via Red Electrica sources; direct operator and individual-address checks remain outstanding.

Verificado pela YPS: 2 de nov. de 2026, 00:55 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Fiji / Toorak

Evidência antiga

Toorak power outage: EFL lists CWM 3AC10 feeder fault

EFL lists an unplanned outage on the Central CWM 3AC10 feeder starting at 07:06 Fiji time on 6 November 2026. Its listed footprint includes Dinem Toorak and Extension Street alongside several named facilities. The operator describes the fault as undetermined and provides no definite restoration timeframe. No affected-customer total is available.

EFL lists an unplanned CWM 3AC10 outage; current address-level supply and a final restoration time remain unverified.

Verificado pela YPS: 7 de nov. de 2026, 02:33 UTC

Illustrated drawer containing power-outage preparation supplies
Ilustração de IA

Fiji / Kinoya, Nadawa and Nadera

Evidência antiga

Kinoya and Nadera power outage: EFL names transformer fault

Energy Fiji Limited now attributes the Central Sewarage Feeder interruption to a blown transformer at Reba Circle, Nadera. The operator lists a start of 09:47 Fiji time on 24 October 2026 and estimates restoration at 16:00 that day. Kinoya sewerage Plants 1 and 2, Valelevu Fire Station and parts of Nadawa and Nadera appear in its affected-area list.

24 October source check: EFL names a blown transformer at Reba Circle, Nadera, and estimates restoration at 16:00 Fiji time; completion and public-service effects remain unverified.

Verificado pela YPS: 25 de out. de 2026, 17:15 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Fiji / Labasa

Evidência antiga

Labasa power outage: EFL lists undetermined fault on 5 November

EFL lists an unplanned Labasa PS power outage starting at 10:35 local time on 5 November 2026. Its affected-area list includes Labasa Town, Namara, Waiqele and Wainikoro, alongside numerous surrounding locations. The operator describes the fault as undetermined and gives no definite restoration timeframe.

EFL lists an unplanned Labasa PS outage with an undetermined fault and no definite restoration timeframe; individual address status remains unverified.

Verificado pela YPS: 7 de nov. de 2026, 02:33 UTC

Emergency supplies in an open drawer
Ilustração de IA

Fiji / R-239 Lavusa Feeder

Evidência antiga

Lavusa power outage: EFL lists R-239 feeder fault

Energy Fiji Limited (EFL) lists an interruption on the R-239 Lavusa Feeder beginning on 31 October 2026 at 13:27 Fiji time. The operator describes the fault as undetermined and gives no definite restoration timeframe. Its unplanned-outage listing was checked on 1 November, but the page’s own publication or update time is unknown.

EFL lists the R-239 Lavusa Feeder interruption with an undetermined fault and no definite restoration timeframe; field conditions may differ from the listing.

Verificado pela YPS: 7 de nov. de 2026, 01:30 UTC

Emergency supplies arranged in an open drawer
Ilustração de IA

Fiji / Matawalu to Tuvu

Evidência antiga

Fiji power outage: burnt pole on Matawalu–Tuvu feeder

Energy Fiji Limited lists an unplanned electricity interruption on part of Naikabula Industrial Feeder, from Matawalu to Tuvu, beginning at 19:24 Fiji time on 2 November 2026. The utility attributes the interruption to a burnt EFL pole and provides no definite restoration timeframe. The affected-customer total is unknown, and the listing does not confirm completed repairs or restoration.

EFL lists a burnt-pole interruption from Matawalu to Tuvu on part of Naikabula Industrial Feeder, with no definite restoration timeframe.

Verificado pela YPS: 2 de nov. de 2026, 12:01 UTC

Emergency supplies arranged in an open drawer
Ilustração de IA

Fiji / Naqali Feeder

Evidência antiga

Fiji power outage: EFL lists Naqali feeder trip

Energy Fiji Limited lists an unplanned electricity interruption on the Naqali Feeder beginning at 09:56 Fiji time on 2 November 2026. EFL attributes the feeder trip to an undetermined fault and provides no definite restoration timeframe. Its affected-area list names Naqali Village, Nabukaluka Road, Vanuakula and other locations along the feeder. No customer total is supplied, and the listing may lag conditions on the ground.

EFL lists the Naqali Feeder interruption with an undetermined fault and no definite restoration timeframe; restoration is unconfirmed.

Verificado pela YPS: 2 de nov. de 2026, 09:59 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Fiji / Nadi

Evidência antiga

Nadi power outage: Narewa 2 safety trip on 6 November

EFL lists an unplanned electricity interruption on the Narewa 2 feeder from 11:50 on 6 November 2026. The operator describes a trip for safety reasons and gives no definite restoration timeframe. Its listed footprint covers parts of Nadi Town and several named nearby locations; the number of affected connections is unknown.

EFL lists a Narewa 2 safety interruption; completed restoration and current address-level supply remain unverified.

Verificado pela YPS: 7 de nov. de 2026, 02:33 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Fiji / Deuba and other PHD 1 areas

Status atual desconhecido

Deuba power outage: EFL cites safety reasons, no restoration time

Energy Fiji Limited (EFL) lists an unplanned PHD 1 power outage for safety reasons on 27 October 2026. Its affected-area list includes Deuba Primary School, Makosoi Housing, Riverside and Galoa, alongside other settlements and businesses. The operator gives a start time of 14:13 and no definite restoration timeframe.

EFL lists a safety-related PHD 1 outage around Deuba and other named areas; no definite restoration timeframe or verified restoration.

Verificado pela YPS: 27 de out. de 2026, 19:09 UTC

Emergency supplies arranged inside an open drawer
Ilustração de IA

França / Northwestern France

Evidência antiga

Austen and Boelo: Enedis reports more than 95% of customers reconnected

Enedis reports that more than 95% of customers interrupted by storms Austen and Boelo had been reconnected by Monday 26 October. Its release published on 27 October says repairs continue for the remaining customers. The percentage covers the two storms together; it does not give a current number still without electricity or confirm restoration at every address.

Enedis reports more than 95% of customers interrupted by Austen and Boelo reconnected by 26 October. Repairs continue; no current remaining total or final deadline is stated.

Verificado pela YPS: 28 de out. de 2026, 03:11 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Reino Unido / SSEN north Scotland network

Evidência antiga

North Scotland power cuts: SSEN reports 8,636 customers still off after Boelo

SSEN reports 8,636 customers still without power and 92% restored in its north Scotland Storm Boelo response at 20:30 GMT on 26 October 2026. Its updated headline also reports more than 100,000 customers restored cumulatively. These are operator figures for its own network, rather than an all-Scotland or Britain-wide total. Full recovery remains unverified.

SSEN reports 8,636 north Scotland customers still off and 92% restored at 20:30 GMT on 26 October; full recovery is unverified.

Verificado pela YPS: 27 de out. de 2026, 04:55 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Reino Unido / SSEN and National Grid Electricity Distribution networks

Status atual desconhecido

Austen and Boelo power cuts: National Grid reports recovery within its network

National Grid Electricity Distribution says all customers affected by Storms Austen and Boelo within its own network are back on supply, according to its bulletin dated 26 October 2026. The statement establishes storm recovery for that operator’s network. It does not establish that supply has returned across every British operator’s network, and the exact restoration time is not given.

Bulletin dated 26 October: National Grid reports all Austen and Boelo customers restored within its network; exact restoration time and current SSEN recovery remain unverified.

Verificado pela YPS: 27 de out. de 2026, 09:51 UTC

Illustration of household backup supplies arranged in a drawer.
Ilustração de IA

Gana / Tema Region

Evidência antiga

Tema power outage: ECG reports network fault in Afienya, Golf City and Gbetsile

The Electricity Company of Ghana (ECG) reported a power outage in parts of Tema Region on Saturday, 14 November, and attributed it to a fault on its network. The utility named Afienya, Golf City and Gbetsile among the affected areas. It said engineers were working to restore electricity.

ECG reported a network fault on 14 November and said engineers were working to restore supply.

Verificado pela YPS: 15 de nov. de 2026, 11:48 UTC

An open drawer containing a flashlight, batteries and other emergency supplies.
Ilustração de IA

Indonésia / Jember

Evidência antiga

Sumbersalak power outage after strong winds hit Jember

Strong winds hit Puloombo and Juroju in Sumbersalak, Ledokombo, on 8 November. Jember BPBD, the local disaster management agency, said a PLN pole fell and trees came down on power cables, cutting electricity in the affected area. Power was still out when the agency compiled its 20:45 WIB update, and PLN was repairing the network.

BNPB’s 10 November report said network restoration was underway in its 9 November snapshot.

Verificado pela YPS: 10 de nov. de 2026, 18:03 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Indonésia / Manggarai, South Jakarta

Evidência antiga

Manggarai power outage: PLN reported network repairs on 30 October

A resident’s report of lost electricity in Manggarai, South Jakarta, received a direct response from PLN on 30 October 2026: electricity-network repairs were underway in the reported area. The response supports a local repair report, with no verified customer total or restoration time. Supply conditions on 31 October have not been established.

PLN reported repairs in the Manggarai area on 30 October; supply and restoration on 31 October remain unverified.

Verificado pela YPS: 31 de out. de 2026, 00:50 UTC

Emergency supplies arranged inside an open drawer
Ilustração de IA

Indonésia / Kutai Barat

Status atual desconhecido

Kutai Barat power cuts: 5 MW reported energized, restoration unresolved

Local reports relay PLN’s statement that an additional 5 MW at PLTD Sentawar was energized on 31 October 2026, with monitoring and evaluation to follow. Accounts differ on whether Kutai Barat’s rotating electricity cuts have ended: one reports an end that evening, while another describes the end conditionally on 1 November. Current full restoration remains unresolved, and the direct operator statement has not been checked.

Reports relay an additional 5 MW energized at PLTD Sentawar; conflicting accounts leave the end of Kutai Barat rotating cuts and full restoration unresolved.

Verificado pela YPS: 1 de nov. de 2026, 20:54 UTC

Emergency preparation items arranged in a drawer
Ilustração de IA

Indonésia / Nusa Penida · Klungkung, Bali

Evidência antiga

Nusa Penida power outage: police relay backup generator fault

Bali police report widespread electricity outage complaints in Nusa Penida district, Klungkung, and say officers visited the local PLTD power station on 6 October. In an account published on 7 October, police relay the station’s explanation that one backup generator developed a fault. The report gives no restoration time or number of affected connections.

Police account published on 7 October: outage complaints and a reported backup generator fault; no confirmed restoration time.

Verificado pela YPS: 8 de out. de 2026, 00:25 UTC

Emergency supplies arranged inside an open drawer
Ilustração de IA

Indonésia / Paser Regency

Evidência antiga

Paser rolling power outages: district reports reduced PLN supply

Paser district government reports rolling electricity interruptions in parts of East Kalimantan, including Paser Regency, following a 26 October visit to PLN Tanah Grogot. The district report quotes the local PLN manager attributing reduced available supply to generating-unit disturbances and scheduled equipment maintenance. Exact affected addresses, customer numbers and a completion time are not established.

The district government reports rolling interruptions in Paser; no verified all-clear or completion time.

Verificado pela YPS: 28 de out. de 2026, 01:11 UTC

Emergency supplies arranged in an open drawer
Ilustração de IA

Indonésia / Pontianak

Status atual desconhecido

Pontianak power cuts: Bengkayang maintenance update

Rotating electricity interruptions in Pontianak and surrounding areas are described in a provincial media centre report published on 1 November 2026. The account concerns the governor’s 29 October visit to PLTU Bengkayang. It reports maintenance progress at Unit 3, while leaving the present supply position at individual addresses unconfirmed.

Rotating interruptions reported around Pontianak; current address-level supply and restoration timing remain unconfirmed.

Verificado pela YPS: 1 de nov. de 2026, 14:48 UTC

Emergency preparation supplies arranged in a drawer
Ilustração de IA

Indonésia / Selatpanjang

Status atual desconhecido

Selatpanjang power outage: 29 October report describes returning supply

A Meranti government report dated 29 October 2026 quotes PLN manager Roni Saputra saying electricity was back in affected areas of the Selatpanjang system, Riau, while further work was needed for normal, stable operation. Reports give different interruption times. The available evidence does not establish a complete restoration or the current situation on 30 October.

Dated 29 October report says supply was back in affected Selatpanjang areas with stability work still needed; complete restoration and 30 October status unverified.

Verificado pela YPS: 30 de out. de 2026, 08:30 UTC

Open wooden drawer holding a headlamp, lantern, power bank, cables and radio
Ilustração de IA

Indonésia / Central Surabaya

Evidência antiga

Surabaya power cut: PLN reports restoration after central-area interruption

Electricity briefly failed in several central Surabaya streets on 19 October 2026, according to independent local reporting. PLN subsequently told reporters that supply in affected areas had returned to normal. The precise cause remains under investigation, and no verified customer or connection total is available.

PLN reports restoration in affected areas through local media; the precise cause and total affected connections remain unknown.

Verificado pela YPS: 19 de out. de 2026, 19:59 UTC

Illustrated drawer holding emergency supplies for a power outage
Ilustração de IA

Indonésia / Berau

Evidência antiga

Berau power outages: police report two damaged PLN towers

Polres Berau says a fallen tree brought down two PLN high-voltage towers at KM39 in Dumaring, Talisayan, contributing to rolling electricity interruptions in Berau and parts of North Kalimantan. Its report describes a joint site inspection on 27 October 2026. Separate local reporting describes residents’ complaints and business disruption; complete restoration and the current supply status at individual addresses remain unverified.

Polres Berau reports tower damage contributing to rolling interruptions; complete restoration remains unverified.

Verificado pela YPS: 6 de nov. de 2026, 04:16 UTC

Emergency supplies arranged inside an open drawer
Ilustração de IA

Índia / Gurugram

Evidência antiga

Gurugram power cuts: strike reportedly ends, recovery unconfirmed

Reports of power cuts in parts of Gurugram on 22–23 October 2026 describe disruption to household water supplies and exhausted backup power. The Tribune and The Times of India subsequently reported that Haryana’s electricity employees’ strike ended on 23 October and officials were instructed to coordinate restoration. Those reports do not confirm that electricity returned across Gurugram.

Reports describe Gurugram interruptions on 22–23 October; the strike reportedly ended on 23 October, but completed restoration remains unconfirmed.

Verificado pela YPS: 24 de out. de 2026, 03:35 UTC

Drawer holding a flashlight, batteries and other power outage supplies.
Ilustração de IA

Iraque / Kurdistan Region of Iraq

Evidência antiga

Dana Gas says Khor Mor gas production has not restarted

Dana Gas said on 14 November that damage at Khor Mor still prevented the field from producing gas, according to Rudaw and Shafaq News. The company denied reports that production had resumed. The statement gave no new figures for electricity supply in Iraq’s Kurdistan Region.

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 16 de nov. de 2026, 07:03 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Japão / Chiba Prefecture

Evidência antiga

Chiba power outage: TEPCO reports 20 homes still without supply

Twenty customer homes in hard-to-access parts of Chiba Prefecture remained without electricity at 12:00 JST on 27 October 2026, according to TEPCO. The operator reported the remaining interruptions in its Typhoon No. 25 recovery update. Road clearance and power restoration were continuing with municipalities and relevant agencies, with no completion deadline given.

TEPCO reports 20 customer homes still without electricity in its 27 October noon Chiba recovery snapshot; no completion deadline given.

Verificado pela YPS: 27 de out. de 2026, 15:53 UTC

Japão / Isesaki, Gunma

Evidência antiga

Isesaki, Gunma

Último status conhecido: restabelecido, segundo a fonte

Verificado pela YPS: 13 de nov. de 2026, 04:02 UTC

Emergency preparation supplies arranged in a drawer
Ilustração de IA

Japão / Ito

Evidência antiga

Ito power outage: city reports about 510 premises affected

Ito City in Shizuoka reports an electricity outage affecting approximately 510 premises in Oka and Minamicho on 26 October 2026. Its notice places the start at around 15:38 JST and gives the affected count for 15:59 JST. The city relays that TEPCO is assessing the situation; the notice provides no technical cause or estimated restoration time.

Ito City reports about 510 premises affected at 15:59 JST on 26 October. Current count and restoration time unknown.

Verificado pela YPS: 26 de out. de 2026, 15:33 UTC

An open wooden drawer with a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Japão / Kanagawa

Evidência antiga

Fujisawa and Kamakura power outage: TEPCO records restoration

TEPCO recorded power restored at 17:52 JST on 10 November after an outage affected approximately 2,700 premises in parts of Fujisawa and Kamakura in Kanagawa. The utility’s outage history lists 14:44 JST as the start. Its 18:00 JST update still showed the cause under investigation.

TEPCO recorded restoration at 17:52 JST for its Fujisawa and Kamakura outage entry.

Verificado pela YPS: 10 de nov. de 2026, 09:50 UTC

An open wooden drawer with a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Japão / Nagano Prefecture

Evidência antiga

Nagano power outage: power restored in parts of Azumino and Matsumoto

Chubu Electric Power Grid said up to approximately 32,160 customer premises lost power in parts of Azumino and Matsumoto in Nagano Prefecture on 8 November 2026. The utility recorded the interruption from 09:31 to 11:26 Japan Standard Time, a maximum of 115 minutes.

Power restored. The operator recorded the end of the outage at 11:26 JST on 8 November.

Verificado pela YPS: 8 de nov. de 2026, 07:01 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Japão / Noboribetsu

Evidência antiga

Noboribetsu power outage: restoration recorded at 22:29 on 6 November

The network operator’s outage history records restoration at 22:29 Japan Standard Time (JST) on 6 November 2026 for about 50 household connections in Kawakamicho and Kozancho, Noboribetsu. The listed interruption began at 18:17. The operator gives contact with trees or similar vegetation as the cause.

Operator history records restoration at 22:29 JST on 6 November for about 50 household connections in Kawakamicho and Kozancho; recorded cause is contact with trees or similar vegetation.

Verificado pela YPS: 7 de nov. de 2026, 02:33 UTC

Headlamp, lantern, power bank and radio arranged in a wooden drawer
Ilustração de IA

Japão / Osaka

Evidência antiga

Osaka power outages: city reports four interruptions on 26–27 October

Osaka City says an electrical fault at its Hayashiji No. 2 temporary storage facility caused four separate power interruptions in parts of Ikuno, Abeno and Higashisumiyoshi wards on 26–27 October 2026. The city reports that surrounding electricity supply resumed at 14:39 JST on 27 October. The faulty facility was disconnected, and its drainage pump remains stopped.

Osaka City reports surrounding electricity resumed at 14:39 JST on 27 October; the drainage pump remains stopped.

Verificado pela YPS: 28 de out. de 2026, 16:39 UTC

Emergency preparation supplies arranged in a drawer
Ilustração de IA

Japão / Shimonoseki

Evidência antiga

Shimonoseki power restored after lightning fault affected about 2,480 properties

Electricity was restored at 11:50 JST on 30 October 2026 after a lightning-related equipment fault affected approximately 2,480 properties in listed parts of Shimonoseki, Yamaguchi Prefecture, Japan. The operator’s outage-history table records a 09:19 JST start. Its restoration record applies to that listed footprint, rather than every address in the city.

Operator history records restoration at 11:50 JST on 30 October in listed parts of Shimonoseki after a lightning-related equipment fault.

Verificado pela YPS: 30 de out. de 2026, 14:39 UTC

Headlamp, lantern, power bank and radio arranged in a wooden drawer
Ilustração de IA

Japão / Takasaki, Gunma

Evidência antiga

Power restored after Takasaki outage

TEPCO Power Grid records that power was restored at 13:51 Japan Standard Time on 9 November 2026 after an outage affected about 1,580 premises in Takasaki, Gunma. The utility lists a vehicle collision with its equipment as the cause.

TEPCO records restoration at 13:51 JST on 9 November.

Verificado pela YPS: 9 de nov. de 2026, 09:17 UTC

Emergency supplies arranged in an open drawer
Ilustração de IA

Japão / Edogawa, Tokyo

Evidência antiga

Tokyo Edogawa power outage: city reports restoration

Edogawa City says electricity was restored at 09:25 Japan time on 2 November 2026 following a power outage in Shinozakimachi 3-chome and 4-chome, and Shimoshinozakimachi. The municipal notices put the approximate start at 07:05 and the initial impact at about 2,000 connections. The restoration statement covers those named areas; it does not establish conditions across all of Tokyo.

Edogawa City reports restoration at 09:25 JST on 2 November in the three named areas; the technical cause is unstated.

Verificado pela YPS: 2 de nov. de 2026, 03:59 UTC

A laptop, a power bank and a portable power station on a table beside a lamp
Ilustração de IA

Japão / Katsushika, Tokyo

Evidência antiga

Higashikanamachi power outage: TEPCO records restoration

TEPCO Power Grid recorded a power outage in parts of Higashikanamachi in Katsushika, Tokyo, on 11 November 2026. The outage began at 09:50 JST and affected about 180 premises, according to the operator. Its outage history records restoration at 12:43 JST.

TEPCO Power Grid records the Higashikanamachi outage as restored at 12:43 JST on 11 November 2026.

Verificado pela YPS: 11 de nov. de 2026, 04:17 UTC

Emergency supplies arranged in an open drawer
Ilustração de IA

Japão / Kita, Tokyo

Evidência antiga

Tokyo Kita power outage: TEPCO records restoration

TEPCO Power Grid recorded a power outage in five parts of Kita, Tokyo, on 7 November 2026. The interruption began at 10:18 JST and affected about 3,000 electricity connections, according to the utility. Its outage history records restoration at 11:28 JST.

TEPCO Power Grid records restoration at 11:28 JST on 7 November for the outage in five listed parts of Kita, Tokyo.

Verificado pela YPS: 7 de nov. de 2026, 16:49 UTC

Emergency preparation supplies arranged in a drawer
Ilustração de IA

Japão / Ube and Sanyo-Onoda

Evidência antiga

Ube and Sanyo-Onoda power restored after about 3,040 properties affected

Electricity was restored at 07:07 JST on 30 October 2026 after an outage affecting approximately 3,040 properties in listed parts of Ube and Sanyo-Onoda, Yamaguchi Prefecture, Japan. The operator’s outage-history table records a 05:00 JST start and lists the cause as unknown. Restoration applies to that recorded footprint.

Operator history records restoration at 07:07 JST on 30 October in the listed parts of Ube and Sanyo-Onoda; cause unknown.

Verificado pela YPS: 30 de out. de 2026, 06:35 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Japão / Wakkanai and Sarufutsu

Evidência antiga

Wakkanai and Sarufutsu power outage: restoration recorded on 6 November

The network operator’s outage history records restoration for about 950 household connections in named parts of Wakkanai and Sarufutsu on 6 November 2026. The selected entry lists an interruption from 12:02 to 12:19, interpreted as Japan Standard Time (JST) from the operator’s location. The cause is listed as under investigation.

Operator history records restoration at 12:19 on 6 November for the selected group of about 950 household connections; cause under investigation.

Verificado pela YPS: 7 de nov. de 2026, 02:33 UTC

Headlamp, lantern, power bank, cables and radio arranged in a wooden drawer
Ilustração de IA

Sri Lanka / Sri Lanka

Status atual desconhecido

Sri Lanka power cuts: no demand-management cuts scheduled for 24 October

Sri Lanka’s National System Operator (NSO) lists no demand-management interruptions for 24 October 2026 on its date-selected schedule page, which displays “NormalCondition”. This is the latest dated scheduling information after the 17 October blackout and subsequent conditional cuts. It does not independently confirm electricity at every address or rule out unplanned local outages.

24 October NSO schedule: no demand-management interruptions scheduled; unplanned local outages and individual supply are not independently verified.

Verificado pela YPS: 24 de out. de 2026, 08:40 UTC

Reino Unido / London

Evidência antiga

Grande apagão em Londres afeta milhares de casas e empresas

Um grande apagão afetou milhares de casas e empresas em mais de 30 zonas postais de Londres na segunda-feira, 5 de outubro de 2026. Também falharam painéis de informação e iluminação em estações. Mais tarde, foi comunicado o restabelecimento da eletricidade.

Último status conhecido: restabelecido, segundo a fonte

Verificado pela YPS: 6 de out. de 2026, 09:43 UTC

A drawer with a torch and other power outage supplies.
Ilustração de IA

Marrocos / Casablanca

Evidência antiga

Casablanca power outage: Substations restored after Storm Charles

Storm Charles disrupted electricity in parts of Casablanca and neighbouring Nouaceur province on Wednesday, 11 November. Morocco’s national electricity operator, ONEE, said power was back at all affected source substations at 20:54 local time, according to Médias24. Local reporting describes supply returning later in some neighbourhoods.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 13 de nov. de 2026, 00:53 UTC

Illustration comparing a power bank with a portable power station
Ilustração de IA

México / Acahuizotla

Status atual desconhecido

Acahuizotla residents protest electricity problems in Guerrero

Residents of Acahuizotla, in Guerrero’s Chilpancingo municipality, blocked the federal Chilpancingo–Acapulco road and the Autopista del Sol on 15 October 2026 to demand electricity service, according to two local reports. Interviewees described several days of supply problems with brief returns of power. Current restoration has not been established.

Local reports dated 15 October describe an Acahuizotla protest over electricity problems; current restoration remains unverified.

Verificado pela YPS: 16 de out. de 2026, 02:41 UTC

Illustrated drawer containing household power outage preparation supplies
Ilustração de IA

México / Playas de Tijuana

Status atual desconhecido

Playas de Tijuana power cuts: residents protest at CFE offices

Residents protested at CFE offices in Playas de Tijuana on 6 October 2026 after reporting several days of electricity interruptions, according to two original local reports. Uniradio Baja describes spoiled food brought to the protest and a resident account of continuing loss of supply at that time. The reports do not establish a current all-clear for 7 October.

October 6 local reports: residents protest over multiday interruptions in parts of Playas de Tijuana; no October 7 all-clear verified.

Verificado pela YPS: 7 de out. de 2026, 04:07 UTC

A wooden drawer containing a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Malásia / Johor Bahru, Johor

Evidência antiga

Johor Bahru power outage: TNB reports restoration after substation fire

TNB says electricity supply to all affected areas around Johor Bahru was restored within 77 minutes after a fire at Kangkar Tebrau Main Intake Substation on 16 October 2026. Its statement, released the following morning, names six affected areas. The customer total is unknown and the cause remains under investigation.

TNB reports full restoration to affected Johor Bahru areas within 77 minutes after the 16 October fire; cause under investigation in its 17 October release.

Verificado pela YPS: 18 de out. de 2026, 11:23 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Nigéria / Lagos

Evidência antiga

Ikeja Electric reports Band A supply shortfalls on listed Lagos feeders

Ikeja Electric says listed Band A feeders in its Lagos distribution territory fell short of the expected 20 hours of daily electricity supply. The operator issued three notices covering 2 and 3 November, 3 and 4 November, and 4 and 5 November. The notices describe daily supply shortfalls, with feeder overlap and the return to expected supply still unverified.

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 7 de nov. de 2026, 15:49 UTC

Lagos · Foto de arquivo
Lagos · Foto de arquivo

Nigéria / Ikeja Electric distribution network

Evidência antiga

Ikeja Electric reports reduced power supply hours

Ikeja Electric says customers across its network face reduced electricity supply hours because of a shortfall in the allocation it receives from the national grid. Its notice is dated 5 October; it does not establish a nationwide blackout or a uniform interruption at every address.

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 16 de nov. de 2026, 17:14 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Nigéria / Osogbo

Evidência antiga

IBEDC reports power outages around Osogbo

Ibadan Electricity Distribution Company (IBEDC) reported power outages around Osogbo, Osun State, on 7 November 2026. Its Osun Region issued two notices: one about a broken pole at Biket Junction and another about technical work on the NCC feeder. Both reported restoration work and neither gave a restoration estimate.

IBEDC reported restoration work on 7 November. Latest feeder status and restoration times are unverified.

Verificado pela YPS: 7 de nov. de 2026, 22:59 UTC

Emergency supplies in an open drawer
Ilustração de IA

Países Baixos / Babberich

Evidência antiga

Babberich power outage: Liander reports restoration at 09:25

Liander marks the Babberich electricity interruption under reference 8466303 as resolved. The operator gives 1 November 2026 at 09:25 as the end time, after a reported time of 01:58. Its notice names Korteweide, Landkamp, Vogeldel and Zandakker. This is Liander’s restoration report; supply at each individual address has not been independently checked.

Liander marks Babberich incident 8466303 resolved with an end time of 1 November at 09:25; individual addresses have not been independently checked.

Verificado pela YPS: 1 de nov. de 2026, 08:36 UTC

Wooden drawer holding a headlamp, lantern, power bank, cables and radio
Ilustração de IA

Países Baixos / Dongen and Rijen

Evidência antiga

Dongen and Rijen power outage resolved after Oosteind station fault

Electricity has been restored after an outage affected Dongen, Rijen and surrounding places in the Netherlands on the morning of 28 October 2026, according to Enexis and the regional safety authority. The authority reports about 21,000 affected connections and locates the fault at the high-voltage station in Oosteind. Recovery times differ between sources.

Enexis and the safety authority confirm restoration after the Dongen and Rijen outage; reported recovery times differ.

Verificado pela YPS: 28 de out. de 2026, 14:30 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Nova Zelândia / Gisborne

Evidência antiga

Gisborne power outage: Kaiti and Wainui restoration on 6 November

Firstlight Network reports power restored after an unplanned interruption in Wainui, Riverside Road, Fox Street and Kaiti on 6 November 2026. The operator lists a fault on its 50kV network, with a start at 01:53 and an end at 03:00 local time. The original number of customers affected is unknown.

Firstlight reports power restored for incident 1518 in the listed areas; address-level supply has not been independently checked.

Verificado pela YPS: 6 de nov. de 2026, 22:29 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Nova Zelândia / Penrose, Auckland

Evidência antiga

Penrose power restored after McNab substation fire, Vector says

Vector says power was fully restored on the morning of 6 November 2026 after the previous afternoon’s fire at its McNab substation in Penrose, Auckland. The update follows an initial interruption affecting 7,000 customers, according to Vector as quoted by 1News. Electricity restoration does not mean permanent repairs to the damaged substation are complete.

Vector reports full restoration on the morning of 6 November 2026; permanent repairs remain outstanding and the cause is under investigation.

Verificado pela YPS: 6 de nov. de 2026, 09:16 UTC

A drawer with a torch and other power outage supplies.
Ilustração de IA

Filipinas / Lanao del Sur

Evidência antiga

Lanao del Sur power outage: NGCP restores transmission

The National Grid Corporation of the Philippines (NGCP) said it restored transmission on the Basak–Malabang 69 kV line segment at 6:10 a.m. Philippine time on 12 November 2026. The update matches an unplanned power outage that began at 4:26 a.m. in parts of Lanao del Sur. Restoration for individual LASURECO customers remains unverified.

NGCP reports transmission restored on the Basak–Malabang line segment. Restoration at individual addresses remains unverified.

Verificado pela YPS: 12 de nov. de 2026, 08:42 UTC

Emergency supplies arranged inside an open drawer
Ilustração de IA

Sudão / Abu Hamad and Al Dabbah

Status atual desconhecido

Abu Hamad and Al Dabbah power outages reported after station strikes

Sudan Tribune reports power disruption in Abu Hamad and surrounding villages, and in Al Dabbah and nearby rural areas, following reported electricity station strikes on 1 November 2026. Al Jazeera separately reports a station fire in Abu Hamad and an attack on the Al Dabbah station. The affected-customer total and current restoration position remain unverified. The reporting concerns two distinct locations in northern Sudan and does not establish a nationwide outage.

Local power disruption after station strikes is reported in Abu Hamad and Al Dabbah; current restoration and customer totals remain unverified.

Verificado pela YPS: 1 de nov. de 2026, 22:57 UTC

An open wooden drawer with a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Sudão / Kassala state, Sudan

Status atual desconhecido

Sudan power outages: reports of disruption in Kassala after attacks

Two newsrooms report electricity loss across broad parts of Kassala state in eastern Sudan after attacks on electricity infrastructure on 2 November 2026. Al Arabiya/Al Hadath reports an attack at New Halfa, while Ultra Sudan separately reports attacks on Aroma and New Halfa. The reports support an attributed account of disruption; the current supply position and number of affected connections remain unknown.

Two newsrooms report electricity loss in parts of Kassala state after attacks on 2 November; present supply, affected total and restoration deadline remain unknown.

Verificado pela YPS: 2 de nov. de 2026, 23:15 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Sudão / Al-Faw, Al-Hawata and Singa, Sudan

Status atual desconhecido

Sudan power outages reported after attacks at Al-Faw and Al-Hawata

Local reporting describes electricity losses after attacks at Al-Faw and Al-Hawata in Sudan on 26 October 2026. Separate witness reporting also describes power loss in Singa. The reports support local outages, while accounts of the wider regional impact differ. No verified affected-customer total or restoration deadline is available.

Local power losses reported in Sudan on 26 October; regional scope differs by source and restoration remains unverified.

Verificado pela YPS: 27 de out. de 2026, 09:51 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Sudão / Omdurman

Status atual desconhecido

Omdurman power outage: government reports Al-Markhiyat station damage

Sudan’s government says the Al-Markhiyat transformer station northwest of Omdurman was severely damaged and taken out of service on the morning of 27 October 2026. Its statement reports electricity interruptions in parts of Khartoum and River Nile states and other unnamed states. No restoration deadline or affected-customer total is provided.

Government confirms Al-Markhiyat station damage and electricity interruptions in its 27 October statement; current supply and restoration time remain unverified.

Verificado pela YPS: 29 de out. de 2026, 03:52 UTC

Emergency supplies arranged in an open drawer
Ilustração de IA

Ucrânia / Kyiv and Dnipro

Status atual desconhecido

Kyiv and Dnipro power outages after attacks on 30–31 October

DTEK reports electricity loss in parts of Kyiv and in Dnipro, Kamianske and nearby districts after attacks on 30–31 October 2026. The operator reports damage and says repair work depends on security conditions. Separate regional estimates from President Zelenskyy describe families without electricity on 31 October; no reliable completion estimate is available.

DTEK reports electricity loss after attacks; no full restoration or reliable completion estimate is established.

Verificado pela YPS: 31 de out. de 2026, 16:13 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Ucrânia / Brovary district

Status atual desconhecido

Brovary district power outage after energy facility damage, DTEK says

DTEK said on 7 November that an overnight attack damaged an energy facility, cutting electricity in part of Brovary district in Kyiv region. The operator described the damage as significant and said air alerts and the risk of further attacks were complicating repair work. The exact areas affected within the district and the restoration timing are unverified.

DTEK confirmed an interruption in part of Brovary district; restoration timing is unknown.

Verificado pela YPS: 7 de nov. de 2026, 13:43 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Ucrânia / Chernihiv and Slavutych

Status atual desconhecido

Chernihiv and Slavutych power outage: operator reports partial restoration

Chernihivoblenergo reported that an emergency at an electricity supply facility interrupted power to about 150,000 connections on 7 November. The operator named the cities of Chernihiv and Slavutych and the districts of Koriukivka and Chernihiv. It said some connections had been restored and work was continuing, without giving a remaining count or a time for full restoration.

Chernihivoblenergo reported partial restoration. The remaining count and full restoration timing are unknown.

Verificado pela YPS: 7 de nov. de 2026, 14:46 UTC

An open drawer with supplies for a power outage.
Ilustração de IA

Ucrânia / Dnipro, Ukraine

Status atual desconhecido

Dnipro power outage: DTEK reports citywide loss of electricity on 16 November

DTEK reported that all of Dnipro was without electricity on the evening of 16 November after an attack on energy facilities. The operator said some residents in three nearby districts also lost power. It did not give a time for reconnection.

DTEK reported a citywide outage and restoration work on 16 November. Full restoration is unconfirmed.

Verificado pela YPS: 17 de nov. de 2026, 01:29 UTC

An open wooden drawer with a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Ucrânia / Dnipro and Dnipropetrovsk Oblast

Evidência antiga

Dnipro metro resumes after renewed power outages

Dnipro’s transport department said the metro was running on its weekday timetable on the morning of 10 November, with fewer trams and trolleybuses in service. The update followed renewed power outages reported in parts of Dnipro and Kamianske the previous evening. The transport update did not establish when electricity returned to affected homes.

Dnipro reported the metro running on its weekday timetable on 10 November. That report did not confirm household restoration.

Verificado pela YPS: 10 de nov. de 2026, 09:50 UTC

A drawer with a flashlight and other supplies for power outages.
Ilustração de IA

Ucrânia / Ukraine

Evidência antiga

Ukraine power outages: Ukrenergo sets Sunday schedules

Ukrenergo announced hourly power outage schedules for parts of Ukraine on Sunday, 15 November, alongside separate industrial electricity limits. The plans cover one to two scheduling groups and give no current count of disconnected customers.

Ukrenergo announced hourly outage schedules in parts of Ukraine for 15 November. The plan gives no new customer count.

Verificado pela YPS: 15 de nov. de 2026, 09:52 UTC

An open drawer holding a flashlight, batteries and other power outage supplies.
Ilustração de IA

Ucrânia / Kharkiv Oblast

Evidência antiga

Kharkiv power cuts: low voltage disrupted metro service

Emergency power cuts affected Kharkiv and other parts of Kharkiv Oblast on 16 November, the distributor told Suspilne. Low voltage also disrupted the city’s metro. The metro spokesperson said trains had been held at stations across all lines and that service then began to resume.

Kharkivoblenergo announced emergency cuts in Kharkiv Oblast; the reports gave no electricity restoration estimate.

Verificado pela YPS: 16 de nov. de 2026, 21:19 UTC

A laptop connected to a power bank and a table lamp connected to a portable power station on a wooden table
Ilustração de IA

Ucrânia / Kyiv

Evidência antiga

Kyiv power outage: DTEK reports partial cuts in four districts after attack

DTEK reports partial electricity loss in four Kyiv districts after an attack on energy facilities on 20 October 2026. The named districts are Shevchenkivskyi, Sviatoshynskyi, Solomianskyi and Pecherskyi. Crews are working to restore supply, but no affected-customer total or full restoration deadline has been established.

20 October: operators report partial district electricity loss and restoration work in Kyiv; full recovery is unconfirmed.

Verificado pela YPS: 20 de out. de 2026, 16:12 UTC

An open drawer containing a flashlight, batteries and other emergency supplies.
Ilustração de IA

Ucrânia / Kyiv city and the Kharkiv, Poltava and Sumy regions

Status atual desconhecido

Emergency power cuts in Kyiv city and three regions on 10 November

Ukraine’s Energy Ministry said emergency power cuts were in use in Kyiv city and the Kharkiv, Poltava and Sumy regions on 10 November. The ministry cited equipment damage and lower voltage on the high voltage network. It gave no address list, customer count or time for predictable schedules to resume. In a separate update, DTEK reported cuts in Kyiv city and in the Vyshhorod and Bucha districts of Kyiv region.

Ukraine’s Energy Ministry reported emergency power cuts in Kyiv city and three regions on 10 November.

Verificado pela YPS: 10 de nov. de 2026, 21:09 UTC

A laptop connected to a power bank and a table lamp connected to a portable power station on a wooden table
Ilustração de IA

Ucrânia / Kyiv region

Status atual desconhecido

Kyiv region: DTEK reports power restored to over 56,000 families after weather outages

DTEK reported on 20 October 2026 that electricity had been restored to more than 56,000 families in Kyiv region after weather caused emergency interruptions on 19 October. The operator said restoration of the main network was complete. Scheduled cuts and repairs following attacks continued separately, so the statement does not establish an all-clear for every address.

DTEK’s 20 October report: weather-related main-network restoration complete in Kyiv region; scheduled cuts and attack repairs remain separate. Current address-level supply unverified.

Verificado pela YPS: 21 de out. de 2026, 01:08 UTC

A wooden drawer holding a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Ucrânia / Ukraine

Evidência antiga

Ukraine power outages: Ukrenergo reports new interruptions in 12 regions on 20 October

Ukrenergo’s morning bulletin for 20 October 2026 reports new electricity interruptions following attacks in 12 Ukrainian regions. A separate notice published that day announced hourly restrictions for 21 October in part of Ukraine. These are dated reports: they do not establish the present supply position at every address or prove continuous power loss since the earlier 14 October interruptions.

20 October bulletin: new interruptions reported in 12 oblasts; a separate notice announced restrictions for 21 October. Present address-level supply and restoration completion remain unconfirmed.

Verificado pela YPS: 20 de out. de 2026, 17:07 UTC

A wooden drawer holding a headlamp, lantern, power bank, radio and notebook.
Ilustração de IA

Ucrânia / Northern Odesa Oblast, Ukraine

Evidência antiga

Power cuts in northern Odesa Oblast after attack on DTEK site

Some families in northern Odesa Oblast lost electricity on Sunday evening, 8 November, after an attack on a large DTEK energy facility. The Odesa regional administration reported power interruptions in the north of the oblast, and DTEK confirmed that households had lost supply. Crews began inspecting equipment and clearing debris once conditions allowed.

DTEK reported inspection and debris clearance on Sunday evening. Later restoration remains unverified.

Verificado pela YPS: 9 de nov. de 2026, 07:21 UTC

A wooden drawer holding a headlamp, lantern, power bank, radio and notebook.
Ilustração de IA

Ucrânia / Northern Odesa region, Ukraine

Evidência antiga

Northern Odesa power outage leaves nearly 50,000 families without electricity, DTEK says

Nearly 50,000 families lost electricity after an attack on an energy facility in northern Odesa region on the morning of 14 November, DTEK said. The company said crews began clearing debris and carrying out repairs once conditions were safe.

DTEK reported repair work in northern Odesa region. A restoration time remains unconfirmed.

Verificado pela YPS: 15 de nov. de 2026, 05:48 UTC

An open drawer with supplies for a power outage.
Ilustração de IA

Ucrânia / Northern Odesa Oblast, Ukraine

Evidência antiga

Northern Odesa power outage: DTEK reports 52,200 families lost power

DTEK reported that 52,200 families in northern Odesa Oblast lost electricity after attacks on energy facilities on the morning of 16 November. The utility said workers were addressing damage and restoring equipment. It gave no current count or time for reconnection.

DTEK reported power cuts and work on damaged equipment on 16 November.

Verificado pela YPS: 17 de nov. de 2026, 00:29 UTC

A wooden drawer holding a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Ucrânia / Odesa region, Ukraine

Status atual desconhecido

Odesa region power outage: DTEK reports partial restoration after attack

DTEK says an overnight attack damaged an energy facility in Ukraine’s Odesa region on 16 October, interrupting electricity supplies to local customers. In its morning account, the operator reported 33,300 customers reconnected and a further 11,500 households still without electricity. The statement gives no precise observation time for those figures, and the remaining afternoon total has not been verified.

DTEK’s 16 October morning account reports partial restoration; current remaining supply interruptions and full-restoration time are unverified.

Verificado pela YPS: 16 de out. de 2026, 15:52 UTC

A wooden drawer holding a headlamp, lantern, power bank, radio and notebook.
Ilustração de IA

Ucrânia / Odesa region, Ukraine

Evidência antiga

Odesa region power outage: DTEK reports 41,000 families lost electricity

DTEK says 41,000 families lost electricity after an overnight attack on an energy facility in Ukraine’s Odesa region on 15 November. The company said crews started clearing debris and working to restore damaged equipment once it was safe to do so.

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 16 de nov. de 2026, 02:04 UTC

A laptop connected to a power bank and a table lamp connected to a portable power station on a wooden table
Ilustração de IA

Ucrânia / Odesa region

Evidência antiga

Odesa region power outage: DTEK reported 32,700 families without supply on 20 October morning

DTEK said 32,700 families in the Odesa region remained without electricity in its morning statement on 20 October 2026, after overnight attacks on three of its energy facilities. Some homes had already been resupplied. The morning figure is dated evidence; the current number without power has not been verified.

20 October morning: DTEK reported partial restoration and 32,700 families without supply in Odesa region. Current supply remains unverified.

Verificado pela YPS: 20 de out. de 2026, 16:14 UTC

An open drawer holding a flashlight, batteries and other power outage supplies.
Ilustração de IA

Ucrânia / Poltava Oblast

Evidência antiga

Poltava power cuts: distributor lifts ordinary emergency order

Poltavaoblenergo said it cancelled the ordinary emergency power cut order in Poltava Oblast in full at 21:35 Kyiv time on 16 November. Earlier that evening the distributor had cancelled the order for groups 6–10. The later notice did not establish when power came back at individual addresses.

Poltavaoblenergo said the ordinary emergency order was cancelled in full at 21:35 Kyiv time.

Verificado pela YPS: 16 de nov. de 2026, 21:19 UTC

A wooden drawer holding a headlamp, lantern, power bank, radio and notebook.
Ilustração de IA

Ucrânia / Sumy region, Ukraine

Evidência antiga

Sumy region emergency power cuts: operator announces switch to groups 6–10

Sumyoblenergo said emergency power cuts began at 16:50 local time in Ukraine’s Sumy region on Sunday, 15 November. The distributor later announced that groups 6–10 would be cut and groups 1–5 reconnected at 19:00. The announcement did not confirm that the switch had happened.

Emergency cuts reported in the Sumy region; the announced switch remains unconfirmed.

Verificado pela YPS: 15 de nov. de 2026, 17:55 UTC

A wooden drawer holding a headlamp, lantern, power bank, radio and notebook.
Ilustração de IA

Ucrânia / Sumy region, Ukraine

Evidência antiga

Sumy region power outage: unstable supply after high voltage fault

Parts of Ukraine’s Sumy region still lacked stable electricity on Sunday, 15 November, after a fault at a high voltage facility. Distribution operator Sumyoblenergo said work was continuing for a second day.

Sumyoblenergo says parts of the Sumy region still lacked stable power on 15 November.

Verificado pela YPS: 15 de nov. de 2026, 16:58 UTC

A wooden drawer holding a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Ucrânia / Lutsk, Ukraine

Evidência antiga

Lutsk power outage: authorities report attack damage and backup operation

Authorities have reported electricity interruptions in Lutsk, in Ukraine’s Volyn region, following drone attacks. The regional authority described damaged electricity lines and interruptions to power and water supplies on 15 October. At 07:54 EEST on 16 October, city council secretary Andrii Razumovskyi said the city had been left without electricity and municipal services were operating on backup power. These are dated official statements; current restoration remains unverified.

16 October, 07:54 EEST: the council secretary reports electricity loss and municipal backup operation; current restoration is unverified.

Verificado pela YPS: 16 de out. de 2026, 14:51 UTC

A drawer with a flashlight, batteries and other supplies for power outages.
Ilustração de IA

Ucrânia / Zaporizhzhia city and Ukrainian-controlled part of Zaporizhzhia region

Evidência antiga

Zaporizhzhia lifts extra emergency power cuts; hourly schedules continue

Zaporizhzhiaoblenergo says it withdrew extra emergency power cuts in Zaporizhzhia region by 09:00 Kyiv time on 16 November. The operator had introduced the additional measures that morning because of equipment damage from the previous day. Its hourly power cuts remained in force while repairs continued.

Zaporizhzhiaoblenergo says extra emergency cuts ended while hourly cuts and repairs continued.

Verificado pela YPS: 16 de nov. de 2026, 13:16 UTC

An open drawer holding household power outage supplies
Ilustração de IA

Ucrânia / Zaporizhzhia nuclear power plant

Evidência antiga

Zaporizhzhia nuclear plant regains external power

The Zaporizhzhia nuclear power plant regained external electricity from Ukraine’s grid on 8 November, according to Energoatom. The operator says it switched on the 330 kV Ferosplavna-1 line at 17:41 Kyiv time. The plant had lost its last working external connection that morning and relied on emergency diesel generators.

Energoatom reported that the Zaporizhzhia nuclear plant was again receiving external grid power.

Verificado pela YPS: 9 de nov. de 2026, 00:18 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Estados Unidos / MEA service territory, Alaska

Evidência antiga

Alaska windstorm outages: MEA reports 604 members still without power

MEA reported 604 members still without electricity at 9:20 p.m. Alaska daylight time on October 30, 2026, with additional crews continuing restoration overnight. Earlier that evening, just under 1,900 members remained off; more than 13,500 had been reported without power at 6:25 a.m. during widespread windstorm outages. These dated figures cover MEA members and do not establish the current number affected across Alaska.

MEA reported 604 members still without power on October 30 at 9:20 p.m. AKDT, with additional crews working overnight; current address-level supply remains unverified.

Verificado pela YPS: 31 de out. de 2026, 05:56 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Estados Unidos / Amelia Island, Florida

Evidência antiga

Amelia Island power outage: restoration reported after emergency line repairs

Nassau County Emergency Management reported electricity restored to Amelia Island, Florida, in its 3:05 p.m. EDT update on October 30, 2026. Emergency repairs to a compromised major power line near Shuckers had required an island-wide interruption. An earlier authority update reported more than 17,000 customers affected. These are historical updates; supply conditions on October 31 have not been independently established.

Nassau County reported power restored to Amelia Island on October 30; October 31 supply conditions remain unverified.

Verificado pela YPS: 31 de out. de 2026, 02:55 UTC

A wooden drawer holding a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Estados Unidos / Concord, Massachusetts

Evidência antiga

Concord, Massachusetts power outage: officials report restoration

Power was restored to affected areas of Concord, Massachusetts, at 11:25 a.m. EDT on 14 October, according to officials cited in updated local reporting. The municipal utility director also confirmed that there was no active disruption during an afternoon interview. His explanation resolves the earlier apparent conflict between the restoration account and later outage-map readings.

Officials report restoration at 11:25 a.m. EDT on 14 October; the director explains apparent afternoon outages as map artifacts.

Verificado pela YPS: 15 de out. de 2026, 01:22 UTC

Open wooden drawer containing a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Estados Unidos / Foggy Bottom

Evidência antiga

Foggy Bottom power outage: Pepco reports supply restored

Pepco says power has been restored to all customers impacted by the Foggy Bottom outage following an incident at its I Street Substation in Washington, DC. Its direct update on 2 November 2026 labels the restoration report “as of 2 pm”. The cause remains under investigation, and the statement does not establish an exact switching time or outage duration.

Pepco reports all customers impacted by the Foggy Bottom incident restored; the cause remains under investigation.

Verificado pela YPS: 2 de nov. de 2026, 20:08 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Estados Unidos / McCully, Honolulu

Evidência antiga

Hawaiian Electric confirms power restored after McCully outage

Hawaiian Electric said it restored power to all customers affected by the November 6 outage in McCully, Honolulu. The operator initially reported about 1,340 customers without electricity and attributed the outage to a motor vehicle crash. Its evening update confirmed that power had returned for the customers affected by this incident.

Hawaiian Electric confirmed power restored to all customers affected by the November 6 McCully outage.

Verificado pela YPS: 7 de nov. de 2026, 14:46 UTC

Estados Unidos / Northern Lights supply area

Status atual desconhecido

Northern Lights supply area

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 7 de out. de 2026, 06:10 UTC

Illustration of household backup supplies arranged in a drawer
Ilustração de IA

Estados Unidos / Todd and Logan counties, Kentucky

Evidência antiga

Pennyrile Electric outage: map listed 4,407 members out on 25 October

Pennyrile Electric’s outage viewer listed one outage and 4,407 members without electricity when checked on 25 October 2026. The affected members were in Todd and Logan counties, Kentucky. This is a snapshot of the operator’s map, rather than a verified count of people affected or evidence that either whole county has lost supply.

Pennyrile’s earlier 25 October snapshot listed 4,407 members out. A later empty map does not establish restoration of this incident; the current affected-member count remains unverified.

Verificado pela YPS: 25 de out. de 2026, 12:15 UTC

Illustrated drawer containing equipment for power outage preparation
Ilustração de IA

Estados Unidos / California · PG&E service territory

Evidência antiga

California PG&E shutoffs: more than 86% restored, operator says

PG&E reports that electricity has been restored to more than 86% of customers affected by its current Public Safety Power Shutoff in California. In its 7:30 am PDT update on 17 October 2026, the operator says approximately 11,400 customers remained without power, primarily in Santa Barbara, San Luis Obispo and Kern counties. Individual address status and the time of complete restoration remain unknown.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 18 de out. de 2026, 10:22 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Estados Unidos / Richmond, Virginia

Status atual desconhecido

Richmond polling-site power outage: electricity restored at two locations

Richmond’s Office of Elections confirmed that electricity had been restored at two polling locations after a morning power outage on 3 November 2026. The confirmation names Precinct 504 at Randolph Community Center and Precinct 505 at Clark Springs Elementary School. It establishes restoration at those two sites, without giving an exact restoration time.

Richmond’s Office of Elections confirms electricity restored at both named polling locations after the 3 November morning outage; exact restoration time unknown.

Verificado pela YPS: 4 de nov. de 2026, 02:43 UTC

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Estados Unidos / Richmond, Virginia

Evidência antiga

Richmond pump-station power outage: generator supports service

Richmond’s Department of Public Utilities (DPU) reports that a power outage at a pump station affected water pressure on 2 November 2026. The department attributes the interruption to a vehicle striking a utility pole. Its latest operational update says the station remains on generator power while Dominion works to restore commercial electricity.

DPU reports generator-supported pumping and improving water pressure; commercial electricity restoration at the station remains unconfirmed.

Verificado pela YPS: 5 de nov. de 2026, 09:00 UTC

Estados Unidos / Shoreline and North Seattle

Evidência antiga

Shoreline and North Seattle

Último status conhecido: restabelecido, segundo a fonte

Verificado pela YPS: 9 de out. de 2026, 17:56 UTC

An open drawer stocked with supplies for a power outage
Ilustração de IA

Estados Unidos / Beacon Hill, Seattle

Evidência antiga

Beacon Hill power outage: Seattle City Light confirms restoration

Seattle City Light said at 1:32 a.m. PST on Tuesday, November 10, that all customers affected by the Beacon Hill power outage had service again. The utility first reported about 4,150 customers without power on Monday evening. It later attributed the outage to a downed wire along Airport Way South.

Seattle City Light confirmed restoration for all customers affected by the Beacon Hill outage.

Verificado pela YPS: 10 de nov. de 2026, 17:01 UTC

An open drawer stocked with supplies for a power outage
Ilustração de IA

Estados Unidos / Seattle, Washington

Evidência antiga

Seattle City Light confirms power restored after weekend windstorm

Seattle City Light announced at 6:23 a.m. PST on Monday, November 9, that power had been restored to all of its customers affected by the weekend storm outages. About 240 were still without power at 7 p.m. PST on Sunday. The Monday notice confirms restoration for the storm outages the utility was tracking; it gives no exact time for the final reconnection.

Seattle City Light confirmed restoration for all of its customers affected by the weekend storm outages on November 9.

Verificado pela YPS: 10 de nov. de 2026, 17:01 UTC

An open drawer stocked with supplies for a power outage
Ilustração de IA

Estados Unidos / Western Washington

Evidência antiga

Western Washington outages: about 3,100 PSE customers out November 8

About 3,100 Puget Sound Energy customers were without electricity around 3 p.m. Pacific on November 8, KIRO Newsradio reported. The figure covered Kitsap, Thurston, Pierce and King counties. PSE said earlier that crews were restoring service and assessing damage after strong overnight winds.

KIRO Newsradio reported about 3,100 PSE customers without power around 3 p.m. Pacific on November 8.

Verificado pela YPS: 9 de nov. de 2026, 03:14 UTC

An open wooden drawer with a headlamp, lantern, power bank, radio and paper
Ilustração de IA

Venezuela / Baruta

Evidência antiga

Baruta power outage: Mayor reports partial restoration

Baruta Mayor Darwin González said he had been told electricity was back in the areas affected by the 8 November power outage, with one case still open in Prados del Este. In his 12:27 Venezuela time update, González said electricity operator Corpoelec was working on that case. The number of customers affected and the time service returned in Prados del Este remain unverified.

Baruta’s mayor reported partial restoration on 8 November, with one case open in Prados del Este.

Verificado pela YPS: 9 de nov. de 2026, 05:22 UTC

Organised wooden drawer holding a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

Ilhas Virgens Americanas / St. Thomas–St. John, U.S. Virgin Islands

Status atual desconhecido

St. Thomas–St. John outages: WAPA anticipates Saturday part installation

WAPA says it has sourced a VSV actuator for GE Unit 27 from the U.S. mainland and is pursuing an alternate source in Puerto Rico. Its release dated 23 October 2026 anticipates installation on Saturday, 24 October. Part arrival, installation and the unit’s return to service are not yet confirmed; the plan is not a guaranteed restoration deadline for St. Thomas–St. John.

23 October: WAPA says a Unit 27 part has been sourced and installation is anticipated on 24 October. Arrival, restart and stable restoration remain unconfirmed.

Verificado pela YPS: 24 de out. de 2026, 07:33 UTC

A drawer with a torch and other power outage supplies.
Ilustração de IA

Vietnã / Eastern Đắk Lắk

Evidência antiga

Đắk Lắk flood power outages: EVN reports 8,714 customers affected

Vietnam Electricity (EVN) reported that 8,714 customers served by 86 transformer stations in eastern Đắk Lắk had interrupted supply at 06:00 ICT on Friday, 13 November. The utility said its regional operators switched off power where floodwater made it unsafe to keep the network live.

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 13 de nov. de 2026, 13:08 UTC

Emergency supplies arranged inside an open drawer
Ilustração de IA

Iêmen / Taiz

Status atual desconhecido

Taiz hospital fuel shortages: Reuters reports reduced incubator capacity

Fuel shortages reduced the number of operating incubators from 40 to 10 at the Yemeni-Swedish Hospital for Maternity and Childhood in Taiz, Reuters reported on 26 October, citing named neonatal staff. The figures describe equipment capacity, not the number of babies or people affected.

Reuters reports reduced incubator capacity at a Taiz hospital on 26 October amid fuel shortages; current reserves and recovery remain unverified, with no citywide outage established.

Verificado pela YPS: 27 de out. de 2026, 06:53 UTC

Johannesburg buildings and a tower illuminated at dusk
Johannesburg · File photo

África do Sul / Aeroton, Johannesburg

Evidência antiga

Aeroton power outage: City Power to investigate

City Power reports an unplanned electricity disruption affecting customers in Aeroton, Johannesburg. In its notice published early on 28 October 2026 local time, the operator says operators have been notified and will be dispatched to investigate. The cause, affected-customer total and restoration deadline remain unknown.

City Power reports an unplanned disruption in Aeroton; investigation and restoration plans are pending.

Verificado pela YPS: 28 de out. de 2026, 05:15 UTC

Johannesburg skyline above roads, elevated highways and trees in daylight
Johannesburg · File photo

África do Sul / Aeroton, Johannesburg

Evidência antiga

Aeroton power outage: City Power issues new restoration notice

City Power reported power restored to customers in Aeroton and Ormonde in a separate Showground notice published on 23 October. The utility attributed that interruption to an overload. This follows its earlier restoration notice for a Robertsham Substation cable fault affecting Aeroton, reported on 21 October. A technical connection between the two interruptions has not been established.

City Power reported Aeroton and Ormonde supply restored in a separate 23 October Showground notice; a technical link to the earlier Robertsham cable fault is unverified.

Verificado pela YPS: 23 de out. de 2026, 21:30 UTC

Johannesburg skyline beyond roads and buildings
Johannesburg · File photo

África do Sul / Aeroton

Evidência antiga

Aeroton power restored after overload, City Power says

City Power says electricity supply has been restored to customers in Aeroton following an outage it attributes to an overload. Its Showground Switching Station notice says the interruption was reported on the evening of 30 October 2026. The operator has not given an affected-customer count, the exact time power was lost or the precise time supply returned.

City Power reports electricity supply restored to customers in Aeroton after an overload; exact duration and customer total remain unknown.

Verificado pela YPS: 30 de out. de 2026, 21:44 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Aeroton West power restored after Soccer City Switching Station fault

City Power confirmed on 14 November that power had been restored to customers affected by the Aeroton West outage reported on 6 November. The Johannesburg utility linked the interruption to a burnt chamber at Soccer City Switching Station.

City Power confirmed power was restored to affected Aeroton West customers after the Soccer City Switching Station fault.

Verificado pela YPS: 14 de nov. de 2026, 09:27 UTC

An open wooden drawer containing a headlamp, lantern, radio, power bank and charging cables
Ilustração de IA

África do Sul / Thokoza, Eden Park, Greenfield, Albertsdal, Brackendowns and Alrode South

Evidência antiga

Thokoza and Brackendowns power outage: six areas named by municipality

The City of Ekurhuleni’s service-interruption account reported a power outage affecting Thokoza, Eden Park, Greenfield, Albertsdal, Brackendowns and Alrode South on 19 October. Its 13:19 SAST statement said a team was on site investigating. The cause and restoration estimate had not been established in that update.

19 October municipal statement: six areas named and investigation reported; current address-level supply, cause and full restoration remain unverified.

Verificado pela YPS: 19 de out. de 2026, 18:56 UTC

Hillbrow Tower above Johannesburg buildings
Johannesburg · File photo

África do Sul / Johannesburg · Cresta Switching Station

Evidência antiga

Aldara Park power outage: City Power reports supply restored

City Power reports that power supply has been restored at Cresta Switching Station for the interruption affecting Aldara Park in Johannesburg. The operator attributes the outage to a cable fault and says it was reported on 6 October 2026. Its restoration statement was published at 00:02 SAST on 7 October; that is the update time, rather than an exact physical restoration time.

City Power update published at 00:02 SAST, 7 October: supply restored for the Cresta Switching Station incident affecting Aldara Park.

Verificado pela YPS: 6 de out. de 2026, 22:57 UTC

An aerial view of buildings in Johannesburg lit up at night.
Johannesburg · File photo

África do Sul / Alexandra, Johannesburg

Evidência antiga

Alexandra power outage: City Power says about 98% of affected supply is back

City Power says about 98% of the affected electricity supply is back in part of Alexandra, Johannesburg. On 16 November the utility said it was still sourcing a unit to replace damaged equipment along 15th Avenue and gave no estimate for when the remaining supply would return. The outage notices cover 13th to 16th Avenue between London and Roosevelt.

City Power says about 98% of affected supply is back and gave no restoration estimate.

Verificado pela YPS: 16 de nov. de 2026, 12:05 UTC

Johannesburg skyline viewed from nearby highways
Johannesburg · File photo

África do Sul / Alexandra

Evidência antiga

Alexandra power outage: supply restored in named avenue corridor

City Power says electricity has been fully restored to customers from 13th Avenue to 17th Avenue between London and Roosevelt in Alexandra. Its announcement was published at 17:54 SAST on 11 October. The operator attributes the interruption, reported that morning, to a faulty overhead line. The restoration statement applies to this named corridor, rather than all of Alexandra.

11 October, 17:54 SAST: City Power reports full restoration for the named Alexandra avenue corridor.

Verificado pela YPS: 11 de out. de 2026, 16:07 UTC

Johannesburg skyline seen across the city.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Alexandra power outage: power restored on 17th to 22nd Avenue

City Power says power is fully restored to customers along 17th to 22nd Avenue between London Road and Roosevelt Street in Alexandra, Johannesburg. In its 16 November update, the utility said it had found no fault.

City Power confirms power is fully restored on 17th to 22nd Avenue between London Road and Roosevelt Street.

Verificado pela YPS: 16 de nov. de 2026, 15:16 UTC

Johannesburg skyline viewed from nearby highways
Johannesburg · File photo

África do Sul / Alexandra

Evidência antiga

Alexandra power restored from 4th to 8th Avenue, City Power says

City Power says electricity has been fully restored to customers from 4th Avenue to 8th Avenue, between London Road and Roosevelt Road, in Alexandra. The operator published its restoration announcement at 21:59 SAST on 11 October and said no fault was found. Its statement covers this named corridor, with no address-by-address confirmation in the recorded evidence.

11 October, 21:59 SAST: City Power announces full restoration for the named Alexandra corridor.

Verificado pela YPS: 12 de out. de 2026, 02:05 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Alexandra power outage: City Power confirms 8th to 12th Avenue restoration

City Power says power is back for customers affected by a cable fault along 8th to 12th Avenue between Hofmeyer Street and Selborne Street in Alexandra, Johannesburg. It announced full restoration at 09:38 SAST on 11 November. The notice concerns the corridor outage the utility acknowledged on 8 November.

City Power confirmed full restoration for the 8 November Alexandra corridor outage.

Verificado pela YPS: 11 de nov. de 2026, 08:18 UTC

Buildings across the Johannesburg skyline.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Lombardy East power outage: City Power reports full restoration

City Power says it fully restored power to customers affected by the Lombardy East outage reported on Friday, 13 November. The Johannesburg utility identified a cable fault in its restoration notice for Alexandra Substation.

City Power reported full restoration for the Lombardy East outage reported on 13 November.

Verificado pela YPS: 14 de nov. de 2026, 01:24 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Johannesburg · Alexandra Substation

Evidência antiga

River Park and Far East Bank: City Power reports full supply restored

City Power says full electricity supply has been restored to customers in River Park and Far East Bank served by Alexandra Substation. Its update was published at 21:04 SAST on 9 October. The operator identifies a cable fault and says the outage was reported on 6 October; it does not give the exact switching time or an affected customer total.

9 October, 21:04 SAST: City Power reports full supply restored in River Park and Far East Bank; exact switching time unknown.

Verificado pela YPS: 9 de out. de 2026, 19:58 UTC

Johannesburg skyline seen from the motorway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Alexandra power outage: City Power requests fault testing

City Power says it has asked its test branch to locate the fault affecting Riverpark, East Bank and Tsutsumani after an interruption at Alexandra Substation in Johannesburg. In its Monday update, the utility said about 40% of power supply had been restored.

City Power says about 40% of power supply is restored and its test branch has been asked to locate the fault.

Verificado pela YPS: 16 de nov. de 2026, 07:03 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Alexandra Substation

Evidência antiga

Alexandra outage: City Power reports full restoration

City Power reports full restoration to customers in River Park Extension 9 and Far East Bank after the Alexandra Substation cable-fault outage acknowledged on 25 October. Its announcement on 2 November 2026 follows earlier reports of partial restoration, trenching and final tests. The utility announcement does not establish the exact switching time or the number of affected connections.

City Power reports full restoration after a cable-fault outage.

Verificado pela YPS: 2 de nov. de 2026, 09:59 UTC

Johannesburg skyline beyond a highway interchange
Johannesburg · File photo

África do Sul / Alexandra

Evidência antiga

Alexandra power outage: contractor exposing fault

City Power says a contractor is on site exposing the fault affecting customers on 12th Avenue to 16th Avenue between Roosevelt and Selborne in Alexandra. Its latest update on 1 November 2026 says repairs will follow once the fault is fully exposed. The operator has not provided an estimated restoration time, affected-customer total or technical cause.

Último status conhecido: restabelecido, segundo a fonte

Verificado pela YPS: 1 de nov. de 2026, 15:49 UTC

Johannesburg buildings and Hillbrow Tower beneath a bright, partly cloudy sky
Johannesburg · File photo

África do Sul / Alexandra, Johannesburg

Evidência antiga

Alexandra power restored along 8th to 12th Avenue, City Power says

City Power reports full restoration to customers along 8th to 12th Avenue between Roosevelt Street and Selborne Street in Alexandra, Johannesburg. The utility attributes the outage acknowledged on 29 October 2026 to a cable fault. Its announcement does not supply the exact switching time or an affected-customer total.

City Power reports full restoration along 8th to 12th Avenue between Roosevelt and Selborne streets in Alexandra after a cable fault; exact switching time unknown.

Verificado pela YPS: 29 de out. de 2026, 14:10 UTC

Johannesburg skyline seen from a highway
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Alexandra Substation outage: City Power confirms full restoration

City Power confirmed that power had been fully restored to customers affected by the Alexandra Substation outage reported on 9 November and the subsequent cable fault. The bulletin, dated 12:30 SAST on 11 November, was posted at 13:09 SAST. It did not give the exact time power came back.

City Power confirmed full restoration for customers affected by the 9 November outage and the subsequent cable fault.

Verificado pela YPS: 11 de nov. de 2026, 11:22 UTC

Johannesburg city skyline in the evening
Johannesburg · File photo

África do Sul / Allandale Substation / Rabie Ridge Extension 05

Evidência antiga

Rabie Ridge Extension 5 power trips again after restoration

City Power says power supply has tripped following restoration, affecting customers in Rabie Ridge Extension 5. Its 19:08 SAST update on 10 October says operators will inspect the line the next morning because of safety concerns. This follows an earlier 15:49 SAST notice reporting full restoration after an outage attributed to a cable fault. The latest notice does not provide a new restoration estimate.

10 October, 19:08 SAST: City Power reports a trip after restoration affecting Rabie Ridge Extension 5. Operators will inspect the line the next morning due to safety concerns; no new restoration estimate is given.

Verificado pela YPS: 11 de out. de 2026, 11:57 UTC

Johannesburg skyline viewed from a distance
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Allandale power outage: City Power reports 94% of supply restored

City Power reported on 14 November that 94% of the power supply affected by the Allandale outage had been restored. The utility said repairs were still underway for the remaining supply. Its update covers all Rabie Ridge extensions and parts of Austin View and Mayibuye in Johannesburg. City Power gave no estimate for completing the repairs.

City Power reports 94% of affected power supply restored, with repairs continuing and no restoration estimate.

Verificado pela YPS: 14 de nov. de 2026, 17:39 UTC

Johannesburg skyline viewed from highways
Johannesburg · File photo

África do Sul / Austin View

Evidência antiga

Austin View: City Power reports electricity restored

City Power reports that electricity supply has been fully restored in Austin View, Johannesburg, after a trip on the Eskom side. The utility’s announcement on 2 November 2026 updates its earlier notice of an interruption and planned morning attendance by Eskom. The exact switching time and number of affected connections remain unknown.

City Power reports electricity supply fully restored in Austin View after an Eskom-side trip.

Verificado pela YPS: 2 de nov. de 2026, 12:01 UTC

Hillbrow Tower above Johannesburg buildings
Johannesburg · File photo

África do Sul / Austin View

Evidência antiga

Austin View power outage: 89% supply restored, fault search requested for Monday

City Power reports that 89% of the power supply has been restored to customers in Austin View after a cable fault. Its latest Rabie Ridge Switching Station notice, published at 20:45 SAST on 11 October, says the Test Branch has been requested to locate the fault the following morning, 12 October. The request does not establish a restoration deadline.

11 October, 20:45 SAST: City Power repeats 89% power-supply restoration in Austin View and says fault location has been requested for 12 October morning.

Verificado pela YPS: 13 de out. de 2026, 04:40 UTC

Johannesburg skyline with highways, vehicles and trees in the foreground
Johannesburg · File photo

África do Sul / Bellevue and Bellevue East, Johannesburg

Evidência antiga

Bellevue and Bellevue East power restored after cable fault

City Power reports that electricity supply to customers in Bellevue and Bellevue East, Johannesburg, has been fully restored after an outage attributed to a faulty cable. Its statement on 29 October 2026 says the interruption was reported the previous night. The exact switch-on time and number of affected customers are unknown.

City Power reports full restoration to Bellevue and Bellevue East after a cable fault; exact switch-on time unknown.

Verificado pela YPS: 29 de out. de 2026, 12:09 UTC

Johannesburg skyline beyond curving roads, trees and highway bridges beneath a blue, cloudy sky
Johannesburg · File photo

África do Sul / Bellevue and named Yeoville streets, Johannesburg

Evidência antiga

Bellevue and Yeoville power outage: multiple cable faults

City Power attributes the Bellevue Substation (Hopkins) outage to multiple cable faults affecting customers on Becker, Yeo and Pope Streets in Yeoville as well as Bellevue, Johannesburg. Its evening update on 3 November 2026 says affected customers remain without electricity until repairs. The utility has not supplied an affected connection count or a restoration deadline.

City Power reports multiple cable faults affecting Bellevue and Becker, Yeo and Pope Streets in Yeoville; restoration deadline unknown.

Verificado pela YPS: 3 de nov. de 2026, 18:34 UTC

Johannesburg skyline seen from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Beyers Naudé transformer trip cuts power in parts of Johannesburg

City Power reported that transformer No. 3 at Beyers Naudé Substation tripped on 10 November, interrupting electricity supply to customers in Bromhof, Kelland, Boskruin and Randpark Ridge. The Johannesburg utility said operators were on site working to restore supply.

City Power reported a transformer trip and work to restore power. A switch-on time remains unconfirmed.

Verificado pela YPS: 10 de nov. de 2026, 13:54 UTC

Johannesburg skyline above roads, highway interchanges and green spaces
Johannesburg · File photo

África do Sul / Kensington and Bez-Valley, Johannesburg

Evidência antiga

Kensington and Bez-Valley power outage: City Power reports partial restoration

City Power reports partial restoration following the electricity outage affecting Kensington, Betrams, Lorentzville and Bez-Valley in Johannesburg. Its 3 November 2026 update says operators have restored the power supply up to 80% for customers in those areas. Further faults have been detected and assessments continue. No estimated restoration time is established.

City Power reports partial restoration, with power supply restored up to 80% for the four named areas; further faults are being assessed and no ETR is established.

Verificado pela YPS: 3 de nov. de 2026, 12:26 UTC

An open drawer with supplies for a power outage.
Ilustração de IA

África do Sul / Hillsideview Phase 2, Bloemfontein

Status atual desconhecido

Hillsideview Phase 2 power outage: CENTLEC reports transformer damage

CENTLEC said damage to a transformer at the Hillsideview New Development Sewerage Pump Station disrupted electricity for a significant portion of Phase 2 residents in Bloemfontein. In its 16 November statement, the utility gave no affected customer count or time for reconnection.

CENTLEC reported a disruption in Hillsideview Phase 2. Restoration is unconfirmed.

Verificado pela YPS: 17 de nov. de 2026, 01:29 UTC

Johannesburg buildings illuminated at dusk
Johannesburg · File photo

África do Sul / Bloubosrand, Johannesburg

Evidência antiga

Bloubosrand power outage: City Power says operators will investigate

City Power has acknowledged a power outage affecting customers in Bloubosrand, Johannesburg. In its 25 October 2026 statement, the operator says operators have been notified and will be dispatched to investigate. The available update does not establish their arrival, the cause of the interruption or a restoration deadline.

City Power acknowledges an outage in Bloubosrand and announces dispatch for investigation. Arrival, cause and restoration time remain unconfirmed.

Verificado pela YPS: 25 de out. de 2026, 13:18 UTC

Johannesburg skyline seen from above a motorway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Boothill power outage: City Power confirms full restoration

City Power announced at 13:23 SAST on 10 November that supply was back for all customers affected by the Boothill Switching Station outage in Johannesburg. The utility named Wilgeheuwel, Harveston AH and parts of Honeydew Manor and attributed the outage to an overload.

City Power reported full restoration for customers affected by the Boothill outage on 10 November.

Verificado pela YPS: 10 de nov. de 2026, 11:52 UTC

Johannesburg buildings and Hillbrow Tower beneath a bright, partly cloudy sky
Johannesburg · File photo

África do Sul / Booysens Reserve, Johannesburg

Evidência antiga

Booysens Reserve power outage: City Power awaits police investigation

City Power reports a power outage affecting customers in Booysens Reserve, Johannesburg, on 22 October 2026. The operator attributes the interruption to attempted theft at a local MVC and says operators will be dispatched once SAPS completes its investigations. No restoration estimate or crew arrival has been confirmed.

City Power reports a Booysens Reserve outage and dispatch after SAPS investigations; no crew arrival or restoration time confirmed.

Verificado pela YPS: 22 de out. de 2026, 08:55 UTC

Archive view of Hillbrow Tower and the Johannesburg skyline
Johannesburg · File photo

África do Sul / Bosmont and Newclare, Johannesburg

Evidência antiga

Bosmont and Newclare power restored, City Power reports

City Power reports that electricity has been fully restored to affected customers in Bosmont and Newclare, Johannesburg. The operator issued the restoration update on October 31, 2026, at 10:47 SAST. Earlier that morning, it had reported an unplanned interruption and said operators were on site investigating. The latest statement provides an operator-reported all-clear for the affected customers in those two named areas.

City Power reports full restoration to affected customers in Bosmont and Newclare on October 31; exact reconnection time and individual address-level supply remain unverified.

Verificado pela YPS: 31 de out. de 2026, 08:58 UTC

A tall tower above densely grouped Johannesburg buildings under a bright, cloudy sky
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Braamfontein power restoration reported; Smit Street status unverified

City Power reports electricity restored to Braamfontein, Parktown, Parktown West, Wits University and surrounding areas after emergency isolation of Braamfontein Substation on 20 October. An earlier notice excepted parts of Smit Street. The later statement does not explicitly resolve that exception, so current supply there remains unverified.

City Power reports restoration; current supply to parts of Smit Street remains unverified after the earlier exception.

Verificado pela YPS: 20 de out. de 2026, 14:10 UTC

Hillbrow tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Johannesburg · Braamfontein

Evidência antiga

Braamfontein power outage: dated restoration estimate remains unconfirmed

City Power’s 9 October notice said repairs were in progress in parts of Braamfontein, Johannesburg, with a conditional full-restoration estimate of 18:00 that evening. That dated estimate has passed and is not proof of restoration. The operator attributed the outage, reported on 5 October, to theft of 980 metres of cable.

Dated 9 October notice: repairs were ongoing with a conditional 18:00 SAST estimate; full restoration remains unverified in this record.

Verificado pela YPS: 9 de out. de 2026, 21:55 UTC

Hillbrow Tower above surrounding buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Braamfontein power outage: City Power reports partial restoration

City Power reported on 11 November that electricity had returned to customers in parts of Braamfontein and Parktown West served by Braamfontein Substation in Johannesburg. Its earlier outage notice also named Berea and Hillbrow. The latest notice did not confirm restoration in either of those areas.

City Power reported restoration in parts of Braamfontein and Parktown West. Restoration in Berea and Hillbrow remains unconfirmed.

Verificado pela YPS: 11 de nov. de 2026, 17:31 UTC

Johannesburg city buildings in the evening
Johannesburg · File photo

África do Sul / Bramley

Evidência antiga

Bramley power outage: generator supply reported on Kelvin and Homestead Roads

City Power says temporary generator supply was provided on 21 October to customers along Kelvin and Homestead Roads in Bramley while work continues on a permanent solution. Its update published on 22 October qualifies an earlier full-restoration notice. The operator says a few customers remain disconnected for non-compliance; that explanation has not been independently verified.

City Power reports temporary generator supply on Kelvin and Homestead Roads while permanent work continues; closure of the 15 October incident remains unconfirmed.

Verificado pela YPS: 22 de out. de 2026, 10:52 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Bryanston

Evidência antiga

Bryanston power outage: City Power reports 95% restored

City Power says electricity has been restored to 95% of customers affected by the Bryanston outage supplied by Brynorth Substation’s Logan Distributor. Its 2 November 2026 update asks customers still without power to log new calls because the team cannot locate the mini-substation affecting the remainder. Full restoration is unconfirmed, and no completion estimate or customer total is given.

City Power reports 95% customer restoration in the Bryanston incident on Brynorth’s Logan Distributor; remaining customers are asked to log new calls, with no completion estimate.

Verificado pela YPS: 2 de nov. de 2026, 19:09 UTC

Johannesburg skyline seen from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Bryanston power outage: City Power investigates at Brynorth

City Power reported a power outage affecting customers in Bryanston, Johannesburg, on Friday, 13 November. The utility named Brynorth Substation (Muswell) and said operators were investigating on site. It gave no restoration estimate.

City Power reported a Bryanston outage and said operators were on site investigating.

Verificado pela YPS: 13 de nov. de 2026, 19:22 UTC

Johannesburg skyline viewed from a highway
Johannesburg · File photo

África do Sul / Johannesburg CBD: City Hall and Harrison Corner

Evidência antiga

City Hall and Harrison Corner power outage: City Power reports Bree cable fault

City Power reports that electricity supply remains off at City Hall and Harrison Corner in Johannesburg’s CBD because of a cable fault at Bree Substation. Its 25 October 2026 statement says operators remain on site attending to the outage. The available update does not give a restoration estimate or an affected-customer total.

City Power reports supply still off at City Hall and Harrison Corner due to a Bree Substation cable fault, with operators on site. No restoration estimate is provided.

Verificado pela YPS: 25 de out. de 2026, 12:15 UTC

África do Sul / Johannesburg · Central CBD

Evidência antiga

Johannesburg · Central CBD

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 20 de out. de 2026, 17:07 UTC

Illustrated drawer containing equipment for power outage preparation
Ilustração de IA

África do Sul / Grand Central

Evidência antiga

Grand Central power outage: City Power reports supply fully restored

City Power reports that electricity supply has been fully restored at Grand Central Substation. Its statement, published on 15 October, concerns the named supplies serving Central Park, parts of New Road, Constantia and parts of Old Pretoria Road. The operator’s restoration report is the latest verified update for this incident. The exact switching time and the number of customers affected remain unknown.

15 October, 12:12 SAST: City Power reports Grand Central supply fully restored; exact switching time and customer total are unknown.

Verificado pela YPS: 15 de out. de 2026, 10:25 UTC

Johannesburg skyline with buildings lit at dusk.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Eagle Canyon power restored after cable faults, City Power says

City Power says it fully restored electricity to Eagle Canyon customers affected by the outage reported on 13 November. The Johannesburg utility had attributed the interruption to cable faults. The 14 November notice gives no exact reconnection time or customer count.

City Power reports full restoration for the Eagle Canyon outage reported on 13 November.

Verificado pela YPS: 14 de nov. de 2026, 13:32 UTC

Johannesburg skyline seen from the motorway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Denver power outage in Johannesburg: City Power plans investigation

City Power reported an unplanned power outage affecting customers in Denver, Johannesburg, on Sunday, 15 November. The utility said its team would investigate the cause on Monday, 16 November. It gave no estimate for when power would return.

City Power reports an unplanned interruption in Denver, Johannesburg.

Verificado pela YPS: 15 de nov. de 2026, 17:55 UTC

Aerial view of illuminated buildings in Johannesburg at night.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Kensington and Malvern outage: City Power reports 98% of supply restored

City Power said on Sunday, 15 November, that it had restored 98% of power supply to customers affected by the Kensington and Malvern outage in Johannesburg. The utility said a vandalised chamber was keeping the remaining supply off. It plans to assess the chamber on Monday, 16 November.

City Power reports 98% of power supply restored for this outage.

Verificado pela YPS: 15 de nov. de 2026, 17:55 UTC

Open wooden drawer containing a head torch, lantern, power bank, charging cables, radio and notebook
Ilustração de IA

África do Sul / Coega, Nelson Mandela Bay

Status atual desconhecido

Coega power outage: municipality reports industrial-area breaker trip

An unplanned power outage is affecting sections of Coega Industrial, Coega Zone 2 and surrounding areas, according to Nelson Mandela Bay Municipality. Its notice dated 19 October 2026 says the interruption follows the tripping of an 11kV circuit breaker at Neptune/Z2SS016. The municipality gives no estimated restoration timeframe.

19 October municipal notice: outage reported in sections of Coega Industrial, Coega Zone 2 and surrounding areas; no estimated restoration timeframe.

Verificado pela YPS: 19 de out. de 2026, 14:49 UTC

Hillbrow Tower above the Johannesburg skyline
Johannesburg · File photo

África do Sul / Commercia Extension 09 and Rabie Ridge Extension 04

Evidência antiga

Commercia and Rabie Ridge: City Power reports power restored

City Power reports full restoration from Allandale Substation to Commercia Extension 9 and Rabie Ridge Extension 4 in the Midrand area of Johannesburg. Its update on 2 November 2026 says no fault was found. This follows an earlier notice that operators had been dispatched to investigate. Exact switching time and affected connection count remain unknown.

City Power reports full restoration and says no fault was found.

Verificado pela YPS: 2 de nov. de 2026, 09:59 UTC

Johannesburg skyline viewed beyond roads and buildings
Johannesburg · File photo

África do Sul / Cydna

Evidência antiga

Atholl, Illovo and Inanda power outage: City Power reports full restoration

City Power reports full restoration to customers in Atholl, Illovo and Inanda after the Cydna interruption acknowledged on 15 October. Its latest notice, published at 23:54 SAST on 16 October, links the interruption to a cable fault and burnt Ring Main Unit. The exact physical restoration time and affected-customer total remain unknown.

Último status conhecido: restabelecido, segundo a fonte

Verificado pela YPS: 23 de out. de 2026, 20:28 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Houghton, Killarney, Riviera and Norwood, Johannesburg

Evidência antiga

Houghton, Killarney and Norwood power outage: City Power reports restoration

City Power reports that power has been fully restored to customers in Houghton, Killarney and Norwood, Johannesburg. Its announcement on 25 October follows an outage the utility says was reported on 22 October and resulted from multiple cable faults. Riviera appeared in an earlier affected-area list, but its present supply is not confirmed by the restoration notice.

City Power reports full restoration in Houghton, Killarney and Norwood; Riviera’s current supply remains unconfirmed.

Verificado pela YPS: 25 de out. de 2026, 10:06 UTC

Johannesburg skyline beyond highways and trees under a blue sky with white clouds
Johannesburg · File photo

África do Sul / Melrose, Johannesburg

Evidência antiga

Melrose power outage: City Power reports restoration, street follow-up pending

City Power reports that repairs are complete and electricity has been restored to customers in Melrose following the cable fault reported on 2 November. A later resident report says there is still no power in Melrose Street. The operator says it is following up, leaving that address-level report unresolved.

City Power reports Melrose power restored; a resident still reports no supply in Melrose Street, with operator follow-up pending.

Verificado pela YPS: 3 de nov. de 2026, 20:32 UTC

Hillbrow Tower above Johannesburg city buildings
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Inanda, Illovo and Athol power restored, City Power says

City Power reports full electricity supply restored to customers in Inanda, Illovo and Athol following an outage reported on the night of 10 October. The operator’s 11 October announcement names Cydna Substation and attributes the interruption to a cable fault. It does not give the exact onset, restoration switching time or number of affected connections.

City Power reports full restoration for the Inanda, Illovo and Athol outage reported on 10 October; exact switching time unknown.

Verificado pela YPS: 11 de out. de 2026, 09:50 UTC

Hillbrow Tower rising above Johannesburg buildings
Johannesburg · File photo

África do Sul / Cydna Substation supply areas

Evidência antiga

Cydna power update: City Power reports Killarney supply restored

City Power reported full electricity restoration for the Cydna Substation Killarney Standby Distributor at 12:39 SAST on 11 October. It names Birdhaven, Melrose, Houghton, Chislehurst, Fort Riviera, Norwood and Killarney. The notice dates the outage to 2 October, while an earlier seven-area statement described an interruption that evening on 8 October. The relationship between those events remains unresolved.

11 October, 12:39 SAST: City Power reports restoration for the seven-area Killarney Standby scope; linkage to the 8 October evening interruption remains unresolved.

Verificado pela YPS: 11 de out. de 2026, 10:54 UTC

Johannesburg skyline with illuminated buildings after dark.
Johannesburg · File photo

África do Sul / Wanderers Stadium

Evidência antiga

Wanderers Stadium power outage: City Power investigates

City Power reported a power outage affecting Wanderers Stadium in Johannesburg on Friday, 13 November. The utility said its operators were on site investigating the cause. The notice did not say when the power went off or give a time for restoration.

City Power reported a power outage affecting Wanderers Stadium in Johannesburg. Its operators were investigating on site, and the notice gave no restoration time.

Verificado pela YPS: 13 de nov. de 2026, 17:21 UTC

Aerial view of the Johannesburg skyline and illuminated buildings at night
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Dainfern power outage: City Power reports power back in parts of Dainfern

City Power said at 20:51 SAST on 10 November that it had completed cable repairs at Dainfern Substation and restored electricity to affected customers in parts of Dainfern, Johannesburg. The utility attributed the outage reported on 9 November to a cable fault. Its evening notice gave no exact switch-on time.

City Power reported repairs complete and power restored in parts of Dainfern on 10 November.

Verificado pela YPS: 10 de nov. de 2026, 20:08 UTC

Johannesburg city buildings and a lit tower at dusk
Johannesburg · File photo

África do Sul / Delta Substation, Johannesburg

Evidência antiga

Craighall Park power outage: another distributor interruption

City Power reported Craighall Park supply restored late on 23 October, then clarified that technicians were attending another distributor affecting parts of the area. Its reply early on 24 October gave no estimated restoration time. A resident also reported power still out. These updates do not establish recovery at every address or a technical link to the earlier Delta Substation trip.

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 24 de out. de 2026, 03:35 UTC

Wide view of Johannesburg skyline and highways
Johannesburg · File photo

África do Sul / Eagle Canyon Golf Estate

Evidência antiga

Eagle Canyon power outage: City Power reported restoration on 8 October

City Power reported full restoration of electricity to Eagle Canyon Golf Estate in a notice published at 20:58 SAST on 8 October 2026. The Johannesburg operator attributed the disruption to sagging overhead lines and said it had been reported that day. This is a dated restoration announcement, rather than a new check of supply at individual properties.

8 October 2026, 20:58 SAST: City Power reported full restoration to Eagle Canyon Golf Estate after a disruption attributed to sagging overhead lines; current individual-address supply is not independently verified.

Verificado pela YPS: 8 de out. de 2026, 19:39 UTC

Johannesburg skyline beyond a highway interchange
Johannesburg · File photo

África do Sul / Eikenhof Substation

Evidência antiga

Eikenhof outage: City Power reports cut protection cables

City Power says protection cables were found cut at Orlando Switching Station during its investigation into the Eikenhof electricity outage affecting Rand Water. In an update published at 02:38:33 SAST on 30 October 2026, the operator says its protection team is carrying out repairs. No estimated restoration time has been set.

City Power reports repairs to cut protection cables during the Eikenhof outage affecting Rand Water; no restoration estimate or verified water-service impact.

Verificado pela YPS: 30 de out. de 2026, 04:26 UTC

Aerial view of Johannesburg buildings and the Hillbrow Tower beneath a bright, partly cloudy sky
Johannesburg · File photo

África do Sul / Eldorado Park Extension 1, Johannesburg

Evidência antiga

Eldorado Park Extension 1 power restored, City Power says

City Power says electricity has been fully restored to customers in Eldorado Park Extension 1, Johannesburg, supplied through Nancefield Substation. Its 18 October 2026 statement attributes the outage to a vandalised chamber. The reported recovery applies to the extension named by the operator; it does not establish restored supply across all of Eldorado Park.

18 October, 15:16 SAST: City Power reports electricity restored to Eldorado Park Extension 1; exact onset, duration and physical restoration time remain unknown.

Verificado pela YPS: 18 de out. de 2026, 13:22 UTC

Hillbrow Tower above Johannesburg buildings
Johannesburg · File photo

África do Sul / Ennerdale Extension 9 and Lawley 1

Evidência antiga

Ennerdale Extension 9 and Lawley 1: 89% restored, materials awaited

City Power says power remains 89% restored to customers in Ennerdale Extension 9 and Lawley 1 in Johannesburg. Its latest 2 November 2026 notice says faults have been located and repairs will commence once material is delivered on site. The operator links this update to the multiple-cable-fault outage reported on 30 October. No customer total or full-restoration deadline is provided.

City Power reports 89% restoration in Ennerdale Extension 9 and Lawley 1; remaining repairs await material delivery, with no completion deadline.

Verificado pela YPS: 2 de nov. de 2026, 22:07 UTC

Aerial view of illuminated buildings in Johannesburg at night.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Ennerdale outage: City Power reports 62% of supply restored

City Power reported at 11:52 SAST on 9 November that it had restored 62% of the power supply affected by a cable fault in Ennerdale Extension 6 and Mid-Ennerdale, Johannesburg. Repairs were continuing when the utility posted the update.

City Power reported 62% of affected supply restored at 11:52 SAST on 9 November. Repairs continued.

Verificado pela YPS: 9 de nov. de 2026, 11:23 UTC

Johannesburg skyline seen from a highway.
Johannesburg · File photo

África do Sul / Ennerdale

Evidência antiga

Ennerdale feeder outage: City Power confirms Lunar Substation restoration

City Power says supply has returned at Lunar Substation for affected customers in Lenasia South Extension 7. The substation was the last location still without power in the utility’s earlier update on the 16 November Ennerdale feeder outage.

City Power confirmed restoration at Lunar Substation for affected customers in Lenasia South Extension 7.

Verificado pela YPS: 16 de nov. de 2026, 22:26 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power restores power to affected customers in parts of Ennerdale Extension 1

City Power says power has been fully restored to customers affected by the 14 November interruption in parts of Mid-Ennerdale and parts of Ennerdale Extension 1. The Johannesburg utility said its investigation found no fault and gave no exact time for when supply returned.

City Power confirms full restoration for the 14 November interruption in parts of Mid-Ennerdale and parts of Ennerdale Extension 1.

Verificado pela YPS: 14 de nov. de 2026, 11:33 UTC

Hillbrow Tower above surrounding buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Ennerdale

Evidência antiga

Ennerdale switch outage: City Power reports restoration up to 94%

City Power reported on 16 November that supply had been restored up to 94% following a faulty local switch outage at Ennerdale Substation. The utility dated the outage to 14 November and named Mid-Ennerdale and Ennerdale Extensions 3 and 5. It gave no confirmed time for restoring the remaining supply.

City Power reported restoration up to 94% after the switch outage; remaining restoration time unconfirmed.

Verificado pela YPS: 16 de nov. de 2026, 18:17 UTC

Johannesburg skyline viewed from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Ennerdale outage: City Power says up to 98% of customers have power again

City Power says it has restored electricity to up to 98% of customers affected by the outage reported on 12 November in Mid-Ennerdale and Ennerdale Extensions 3 and 5. In its 14 November update, the Johannesburg utility said a contractor was repairing a cable fault and two load centres would remain off until repairs were complete.

City Power says supply is back for up to 98% of affected customers; two load centres remain off pending cable repairs.

Verificado pela YPS: 14 de nov. de 2026, 11:33 UTC

Johannesburg city skyline with illuminated buildings at dusk
Johannesburg · File photo

África do Sul / Ennerdale, Johannesburg

Evidência antiga

Ennerdale Extension 5 outage: repairs underway, conditional 19:00 forecast

City Power says repairs are underway on the additional cable fault in Ennerdale Extension 5, with approximately 25% of the affected power supply restored. An earlier notice on 21 October 2026 anticipated full supply by 19:00 SAST that evening, provided everything went according to plan. The later repair update does not confirm full restoration.

21 October: City Power reports repairs underway and approximately 25% of affected supply restored; its earlier conditional 19:00 SAST forecast is not confirmed recovery.

Verificado pela YPS: 21 de out. de 2026, 14:27 UTC

Hillbrow Tower rising above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Ferndale

Evidência antiga

Ferndale power outage: City Power reports full supply restored

City Power reports full electricity supply restored to customers in Ferndale and Vandia Groove in its Harley Substation notice of 1 November 2026. The operator links the cable fault to the outage reported on 30 October. Its restoration notice does not give an exact switching time or an affected-customer total.

City Power reports full supply restored to Ferndale and Vandia Groove on 1 November; individual connections have not been independently checked.

Verificado pela YPS: 1 de nov. de 2026, 14:48 UTC

África do Sul / Fleurhof Extension 09

Evidência antiga

Fleurhof Extension 09

Último status conhecido: restabelecido, segundo a fonte

Verificado pela YPS: 11 de out. de 2026, 07:39 UTC

Johannesburg skyline beyond roads and buildings
Johannesburg · File photo

África do Sul / Fleurhof and Pennyville

Evidência antiga

Fleurhof and Pennyville power restored, City Power says

City Power reports that electricity has been fully restored to affected customers in Fleurhof and Pennyville, Johannesburg. In its update published on 31 October 2026, the utility attributes the earlier evening trip to overload. The statement updates an earlier notice that operators had been dispatched to investigate.

City Power reports full restoration to affected customers in Fleurhof and Pennyville; exact switching time unknown.

Verificado pela YPS: 31 de out. de 2026, 20:12 UTC

Johannesburg skyline above a road interchange with traffic and trees
Johannesburg · File photo

África do Sul / Florida and parts of Florida North, Johannesburg

Evidência antiga

Florida and parts of Florida North: City Power reports power restored

City Power reports that power has been fully restored to customers in Florida and parts of Florida North, Johannesburg, for the outage reported on 24 October 2026. The operator’s evening update follows its earlier fault-finding notice. Exact switching times, the affected-customer total and the cause remain unknown; the statement covers the operator-named customers.

City Power reports power fully restored to customers in Florida and parts of Florida North for the 24 October outage; exact switching times are unknown.

Verificado pela YPS: 24 de out. de 2026, 19:36 UTC

Johannesburg skyline viewed from nearby highways
Johannesburg · File photo

África do Sul / Florida South

Evidência antiga

Florida South: City Power reports full restoration after mini-substation installation

City Power says power has been fully restored to all customers affected by the Florida South mini-substation outage. Its update, published at 22:26 SAST on 9 October, confirms completion of the installation at the corner of Naomi and Kathleen streets. The operator attributes the outage to vandalism and says it was first reported on 30 September 2026.

9 October, 22:26 SAST: City Power reports full restoration after mini-substation installation at Naomi and Kathleen streets in Florida South.

Verificado pela YPS: 9 de out. de 2026, 20:58 UTC

Johannesburg skyline with roads, traffic and trees beneath a cloudy blue sky
Johannesburg · File photo

África do Sul / Fontainebleau and Malanshof, Randburg, Johannesburg

Evidência antiga

Fontainebleau and Malanshof power outage: City Power reports full restoration

City Power reports that full electricity supply has been restored to customers in Fontainebleau and Malanshof, in the Randburg area of Johannesburg, after a cable fault reported on 21 October 2026. The operator published its restoration notice late that evening. The exact outage onset, reconnection time and number of affected customers have not been established.

City Power reports full supply restored in Fontainebleau and Malanshof following a cable fault reported on 21 October.

Verificado pela YPS: 21 de out. de 2026, 20:39 UTC

Hillbrow tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Berea and Hillbrow

Evidência antiga

Berea and Hillbrow power outage: City Power reports full restoration

City Power reported full supply restoration in Berea and Hillbrow following the Fort Substation outage, which it says was reported on 7 October due to multiple cable faults. Later resident posts reported continued electricity loss, and at 19:25 SAST on 9 October the operator acknowledged an outage in Hillbrow and Berea. Whether that later interruption belongs to the same Fort event remains unknown.

9 October: Fort restoration reported at 16:44 SAST; City Power acknowledges a later Hillbrow/Berea outage at 19:25 SAST, with event relationship unresolved.

Verificado pela YPS: 9 de out. de 2026, 17:56 UTC

Johannesburg buildings and Hillbrow Tower beneath a partly cloudy sky
Johannesburg · File photo

África do Sul / Berea, Johannesburg

Evidência antiga

Berea power outage: City Power reports supply restored to four streets

City Power says electricity has been fully restored to customers on Prospect Road, Catherine Avenue, O’Reilly Road and Primrose Terrace in Berea, Johannesburg. Its restoration announcement on 21 October 2026 follows a faulty-cable outage that the operator says was reported on 20 October. The exact time power returned is unspecified.

City Power reports full restoration to customers on Prospect Road, Catherine Avenue, O’Reilly Road and Primrose Terrace; exact restoration time unspecified.

Verificado pela YPS: 21 de out. de 2026, 16:35 UTC

Johannesburg skyline beyond curving roads, vehicles and green trees under a blue sky
Johannesburg · File photo

África do Sul / Fort, Johannesburg

Evidência antiga

Fort power outage: partial restoration after overhead-line repairs

City Power reports electricity restored to parts of Braamfontein, Doornfontein, Hillbrow and Johannesburg’s CBD following the Fort overhead-line fault. Its 19 October update says repairs are complete, but final testing and assessment remain for other customers. Full restoration is expected that evening only if the tests go to plan.

19 October update: partial restoration reported after Fort overhead-line repairs; final testing remains and full restoration is conditional.

Verificado pela YPS: 19 de out. de 2026, 16:56 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Berea and Hillbrow outage: City Power reports 90% restored at Edith Carvell

City Power reported 90% of power supply restored in its 14 November update on the Edith Carvell distributor at Fort Substation. The Johannesburg utility named Berea and Hillbrow and said cable repairs were still in progress.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 15 de nov. de 2026, 17:55 UTC

Hillbrow Tower rises above Johannesburg buildings and tree-lined streets in daylight
Johannesburg · File photo

África do Sul / Founders View, Midrand, Johannesburg

Evidência antiga

Founders View power outage: City Power reports supply restored

City Power reports that electricity supply has been restored at Westfield Substation, affecting Founders View in Midrand, Johannesburg, after a faulty-cable outage reported on 21 October 2026. The operator issued its restoration notice late that evening. The exact interruption onset, reconnection time and number of affected customers have not been established.

City Power reports supply restored at Westfield Substation affecting Founders View after a faulty-cable outage reported on 21 October.

Verificado pela YPS: 21 de out. de 2026, 21:38 UTC

Hillbrow Tower above Johannesburg city buildings
Johannesburg · File photo

África do Sul / Founders View

Evidência antiga

Founders View power outage: City Power investigates

City Power says a team is on site investigating an electricity outage affecting customers in Founders View on the Westfield Substation Founders View Distributor. The checked post displays a latest-edit time just after midnight on 30 October 2026 in South Africa. The cause, affected-customer total and restoration estimate remain unknown.

City Power reports an investigation into an outage affecting Founders View on the Westfield distributor; cause, affected count and restoration time remain unknown.

Verificado pela YPS: 29 de out. de 2026, 22:27 UTC

Johannesburg skyline viewed from a highway
Johannesburg · File photo

África do Sul / Craigavon, Maroeladal and Witkoppen, Fourways

Evidência antiga

Craigavon, Maroeladal and Witkoppen power outage: Eskom gives no restoration time

Eskom reported electricity interruptions affecting customers in Craigavon, Maroeladal and Witkoppen in a notice published on 25 October 2026. The operator attributed the interruptions to cables damaged by Joburg Water contractors and said its teams had worked overnight on repairs. Eskom could not provide an estimated restoration time when it issued the notice.

In its 25 October notice, Eskom reports interruptions in Craigavon, Maroeladal and Witkoppen and says its teams worked overnight on cable repairs; no estimated restoration time is given.

Verificado pela YPS: 4 de nov. de 2026, 12:48 UTC

Illuminated buildings in the Johannesburg skyline at night
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power reports power restored in Freedom Park East

City Power reported full restoration in Freedom Park East, Johannesburg, at 21:03 SAST on 8 November. The utility named Nirvana Substation in its evening update. In the afternoon it had reported a power outage affecting customers in Freedom Park East and said it would send operators to investigate.

City Power reported full restoration in Freedom Park East at 21:03 SAST on 8 November.

Verificado pela YPS: 9 de nov. de 2026, 01:14 UTC

Johannesburg skyline seen from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power reports power restored in Freedom Park North

City Power reported on Monday, 9 November, that power was back for affected customers in Freedom Park North, Johannesburg. The utility attributed the interruption to an overhead line fault. Its morning outage notice and afternoon restoration notice both named Goldev Switching Station.

City Power reported power restored to affected Freedom Park North customers.

Verificado pela YPS: 9 de nov. de 2026, 18:34 UTC

Hillbrow Tower above the Johannesburg skyline
Johannesburg · File photo

África do Sul / Freedom Park South

Evidência antiga

Freedom Park South power outage: investigation planned

City Power reports a power outage affecting customers in Freedom Park South in Johannesburg, supplied by Goldev Switching Station. Its statement on 2 November 2026 says operators have been notified and will be dispatched to investigate. The cause, exact outage start and restoration time remain unknown.

City Power reports an outage in Freedom Park South on the Goldev supply network; dispatch is planned and no cause or restoration estimate is confirmed.

Verificado pela YPS: 2 de nov. de 2026, 16:10 UTC

Johannesburg skyline seen from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Glenesk and Meredale power outage: City Power reports full restoration

City Power reported full restoration in Glenesk and Meredale early on Saturday, 14 November. The Johannesburg utility attributed the power outage, reported the previous evening, to a cable fault at Mondeor Substation.

City Power reported full restoration in Glenesk and Meredale after a cable fault at Mondeor Substation.

Verificado pela YPS: 13 de nov. de 2026, 23:19 UTC

Johannesburg skyline with illuminated buildings in the evening
Johannesburg · File photo

África do Sul / Glenvista

Evidência antiga

Glenvista power outage: City Power reports full restoration

City Power says power has been fully restored to customers in Glenvista, Johannesburg, following an outage caused by a cable fault. The operator published its restoration notice on 10 October at 12:26 SAST under the heading Mulbarton Substation. The statement confirms the operator’s reported recovery for Glenvista; it does not give an affected customer total or the exact time supply returned.

10 October, 12:26 SAST: City Power reports power fully restored to customers in Glenvista after a cable fault.

Verificado pela YPS: 10 de out. de 2026, 11:11 UTC

Open wooden drawer holding a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

África do Sul / Greenstone Hill

Evidência antiga

Greenstone Hill power outage: City Power reports supply restored

City Power reports that electricity has been restored to customers in Modderfontein, Greenstone Hill and Stoneridge after a cable fault reported earlier on 3 November 2026. The operator statement establishes reported restoration for those named areas, while the exact outage onset, affected connection count and physical restoration minute remain unknown.

City Power reports power restored in Modderfontein, Greenstone Hill and Stoneridge after a cable fault reported on 3 November.

Verificado pela YPS: 3 de nov. de 2026, 20:32 UTC

Prepared backup equipment arranged in a drawer
Ilustração de IA

África do Sul / Greenstone Hill Switching Station

Evidência antiga

Greenstone power outage: City Power reports restoration at two complexes

City Power reports that electricity supply has been restored to customers at Greenstone Shopping Centre and Greenstone Gate Complex. The operator attributes the interruption to a double cable fault. Its statement was published at 21:15 SAST on 6 October 2026. That is the publication time of the restoration report, rather than a verified timestamp for the moment power returned at individual connections.

City Power update published at 21:15 SAST, 6 October: supply restored at the two named Greenstone complexes.

Verificado pela YPS: 6 de out. de 2026, 19:51 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Greenstone Drive power outage: City Power reports 66% restored

City Power reported at 19:22 SAST on 10 November that 66% of supply had been restored on Greenstone Drive in Johannesburg by feeding power from another route. The utility said it was repairing two cable faults and working to restore the remaining 34%. It expected full restoration by 23:00 SAST that evening. That time was an estimate in the notice; the bulletin did not confirm full restoration.

Último status conhecido: restabelecido, segundo a fonte

Verificado pela YPS: 11 de nov. de 2026, 00:15 UTC

High-rise buildings on the Johannesburg skyline
Johannesburg · File photo

África do Sul / Gresswold, Johannesburg

Evidência antiga

City Power reports 90% of supply restored in Bramley View and Corlett Gardens

City Power said on Monday, 16 November, that 90% of power supply remained restored in Bramley View and Corlett Gardens, Johannesburg. In its latest Gresswold Substation update, the utility said its team was on its way to continue investigating.

City Power says 90% of supply remains restored and its team is on its way to continue investigating.

Verificado pela YPS: 16 de nov. de 2026, 07:03 UTC

Hillbrow Tower above Johannesburg city buildings
Johannesburg · File photo

África do Sul / Gresswold

Evidência antiga

Gresswold power outage: investigation to follow current task

City Power says operators will investigate an outage affecting Bramley View, Corlett Gardens and Lombardy West after completing their current task. The latest notice on 30 October 2026 follows an earlier statement that a team was on site investigating the cause. The cause and restoration time remain unknown.

City Power says operators will investigate the Gresswold-area interruption after their current task; cause and restoration time are unknown.

Verificado pela YPS: 30 de out. de 2026, 08:30 UTC

Johannesburg skyline with highways in the foreground
Johannesburg · File photo

África do Sul / Bramley View, Bramley Gardens and Whitney Gardens, Johannesburg

Evidência antiga

Bramley View power outage: City Power reports supply restored

City Power reports full restoration to customers in Bramley View, Bramley Gardens and Whitney Gardens after a cable fault. The operator published its recovery statement at 13:37 SAST on 17 October 2026. This updates the earlier investigation notice for these three Johannesburg areas; it does not establish restoration across other Gresswold supply areas.

17 October, 13:37 SAST: City Power reports full restoration in Bramley View, Bramley Gardens and Whitney Gardens after a cable fault.

Verificado pela YPS: 18 de out. de 2026, 03:18 UTC

Johannesburg skyline viewed from a highway
Johannesburg · File photo

África do Sul / Gresswold Substation, Johannesburg

Evidência antiga

Gresswold power outage: City Power reports full restoration

City Power says full electricity supply has been restored following the Gresswold cable fault affecting Bramley Park, Raumarais Park and Wynberg. Its 22:09 SAST statement on 8 October explicitly names those three areas and links the outage to the acknowledgement on 5 October. The announcement replaces the earlier position of jointing work still underway, with no restoration estimate.

8 October, 22:09 SAST: City Power reports full restoration for the three named areas following a faulty cable.

Verificado pela YPS: 8 de out. de 2026, 20:37 UTC

Johannesburg skyline seen from nearby roads
Johannesburg · File photo

África do Sul / Gresswold

Evidência antiga

Gresswold power outage: City Power reports supply restored

City Power reports that power supply has been fully restored after the Gresswold interruption reported earlier on the evening of 15 October 2026. Its later statement names Highlands North, Gresswold, Savoy, Savoy Estate, Waverly, Fairmont, Sandringham, Bramley and Sydenham. This is an operator restoration report for the named event; it does not independently verify electricity at every address.

15 October, 21:28 SAST: City Power reports full restoration of the earlier Gresswold interruption; individual address status remains unverified.

Verificado pela YPS: 15 de out. de 2026, 19:32 UTC

Johannesburg skyline above roads, vehicles and trees beneath a cloudy blue sky
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Gresswold power outage: Wynberg fault location temporarily halted

City Power says approximately 20% of the power supply has been restored to customers in Wynberg, while technical challenges have temporarily halted fault location. Its update at 15:31:15 SAST on 22 October 2026 says the test branch team remains on site. The operator links this to the Gresswold outage acknowledged on 19 October; it gives no full-restoration deadline.

City Power reports approximately 20% of power supply restored in Wynberg; technical challenges temporarily halt fault location, with the test branch still on site.

Verificado pela YPS: 22 de out. de 2026, 14:55 UTC

Johannesburg buildings and Hillbrow Tower beneath a partly cloudy sky
Johannesburg · File photo

África do Sul / Halfway Gardens, Midrand, Johannesburg

Evidência antiga

Halfway Gardens power outage: City Power reports full restoration

City Power reports that power supply has been fully restored in Halfway Gardens, Midrand, following the outage acknowledged on 21 October 2026. In its 22 October update, the operator attributes the interruption to double cable faults and asks customers still without electricity to log calls.

City Power reports full restoration in Halfway Gardens after double cable faults; customers still without electricity are asked to log calls.

Verificado pela YPS: 22 de out. de 2026, 13:55 UTC

Open wooden drawer containing a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

África do Sul / Waterfall

Evidência antiga

Waterfall power outage: City Power reports supply restored

City Power reports that electricity supply has been restored to customers in Allandale, Halfway House, Vorna Valley and surrounding areas supplied by Waterfall Substation. Its late 2 November 2026 update attributes the outage reported earlier that day to an upstream trip. This supersedes the earlier report of 40% restoration and continuing night-shift investigation. Exact switching time, duration and affected-customer count remain unknown.

City Power reports restored supply in the named Waterfall supply areas after an upstream trip; exact switching time and customer count remain unknown.

Verificado pela YPS: 2 de nov. de 2026, 22:07 UTC

Johannesburg skyline with roads and buildings
Johannesburg · File photo

África do Sul / Harley, Ferndale and Beverly Gardens

Evidência antiga

Harley outage: City Power reports Ferndale and Beverly Gardens restored

City Power says electricity has been restored to customers in Ferndale and Beverly Gardens following the Harley Substation interruption reported on the evening of 15 October 2026. The operator attributes the outage to a faulty cable. Its latest statement does not give an affected-customer count or the precise time reconnection was completed.

15 October, 23:01 SAST: City Power reports Ferndale and Beverly Gardens restored after the Harley interruption; faulty cable attributed by operator.

Verificado pela YPS: 15 de out. de 2026, 21:31 UTC

Hillbrow Tower above Johannesburg city buildings
Johannesburg · File photo

África do Sul / Heriotdale Extension 10

Evidência antiga

Heriotdale Extension 10 power outage: City Power to investigate

City Power reports an unplanned outage at Cleveland Substation’s Marathon Distributor affecting customers in Heriotdale Extension 10, Johannesburg. Its statement on 30 October 2026 says a team has been informed to investigate the cause. The operator gives no restoration estimate, and the number of affected connections remains unknown.

City Power reports an outage affecting Heriotdale Extension 10 via Cleveland Substation’s Marathon Distributor; a team has been informed to investigate, with restoration time unknown.

Verificado pela YPS: 30 de out. de 2026, 02:26 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Hillbrow power outage: City Power reports restoration at Micro Towers

City Power says it has fully restored supply to Hillbrow customers affected by the Micro Towers Substation outage in Johannesburg. The utility issued its update on Sunday, 15 November, for the outage reported on Friday, 13 November.

City Power reports full restoration for the Micro Towers Substation outage in Hillbrow.

Verificado pela YPS: 15 de nov. de 2026, 15:50 UTC

Johannesburg skyline beyond roads, cars and green roadside trees
Johannesburg · File photo

África do Sul / Homestead Park and Amalgam, Johannesburg

Evidência antiga

Homestead Park and Amalgam: City Power reports power restored

City Power reports that electricity has been restored to customers in Homestead Park and Amalgam, Johannesburg, following a cable fault at Mayfair Substation. The operator issued its restoration statement on 25 October 2026. The exact time supply returned, the outage start and the number of affected customers remain unknown.

25 October: City Power reports power restored in Homestead Park and Amalgam following a cable fault at Mayfair Substation.

Verificado pela YPS: 25 de out. de 2026, 14:19 UTC

Hillbrow Tower above Johannesburg buildings
Johannesburg · File photo

África do Sul / Honey Park and Laser Park, Johannesburg

Evidência antiga

Honey Park and Laser Park power outage: City Power reports restoration

City Power says electricity has returned to all customers affected by the Clover Road outage in Honey Park and Laser Park, Johannesburg. The utility attributed the interruption to lightning in its 15:22 SAST update on 16 November. That was when the update appeared; City Power did not give an exact time for when supply returned.

City Power reports full restoration for the Clover Road outage affecting Honey Park and Laser Park.

Verificado pela YPS: 16 de nov. de 2026, 16:19 UTC

África do Sul / Johannesburg

Evidência antiga

Johannesburg

Último status conhecido: restabelecido, segundo a fonte

Verificado pela YPS: 20 de out. de 2026, 11:02 UTC

Johannesburg skyline viewed from the highways
Johannesburg · File photo

África do Sul / Honeydew

Evidência antiga

Honeydew power outage: City Power reports full restoration

City Power reports that full electricity supply has been restored to customers in Honeydew, Honeypark, Honeydew Manor and Honeydew Grove. Its 13:46 SAST update on 8 October attributes the outage to overload. The restoration report follows a morning notice of unplanned loss of supply in those four areas; the exact interruption and reconnection times remain unknown.

8 October, 13:46 SAST: City Power reports full supply restored in the four named Honeydew and Honeypark areas, following an outage attributed to overload.

Verificado pela YPS: 8 de out. de 2026, 12:36 UTC

Aerial view of illuminated buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power reports power restored in Honeydew Manor and Eagle Canyon

City Power says power returned to affected customers in Honeydew Manor and Eagle Canyon Golf Estate, Johannesburg, after an overhead line fault at Christiaan De Wet Substation. The utility posted the restoration notice at 20:52 SAST on 9 November and dated the original outage report to 8 November.

City Power reported power restored in Honeydew Manor and Eagle Canyon Golf Estate at 20:52 SAST on 9 November.

Verificado pela YPS: 10 de nov. de 2026, 05:36 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Harveston and Honeydew, Johannesburg

Evidência antiga

Harveston and Honeydew power restored after cable fault

City Power reports that electricity has been fully restored to customers in Harveston and Honeydew supplied through Boothill Switching Station in Johannesburg. The operator attributes the outage reported on 27 October 2026 to a cable fault. The exact start of the interruption, switching completion time and affected-customer total remain unknown.

City Power reports full restoration in Harveston and Honeydew through Boothill Switching Station after a cable fault.

Verificado pela YPS: 27 de out. de 2026, 23:12 UTC

Johannesburg buildings lit up at night
Johannesburg · File photo

África do Sul / Honeydew, Johannesburg

Evidência antiga

Honeydew power outage: City Power confirms Peter Road restoration

City Power said electricity had been fully restored to customers affected by the Peter Road Substation outage in Honeydew, Johannesburg. In its 14:00 SAST update on 11 November, the utility identified a cable fault. The notice gave no exact switch-on time or affected customer count.

City Power reported full restoration for customers affected by the Peter Road Substation outage.

Verificado pela YPS: 11 de nov. de 2026, 12:25 UTC

Johannesburg skyline at dusk.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Horizon View power restored after cable fault in Roodepoort

City Power says it has fully restored electricity to affected customers in Horizon View, Roodepoort, after a power outage reported on 14 November. The Johannesburg utility identified a faulty cable in its Ontdekkers Substation update.

City Power confirmed full restoration for affected Horizon View customers after a cable fault.

Verificado pela YPS: 14 de nov. de 2026, 09:27 UTC

Johannesburg skyline with illuminated buildings at evening
Johannesburg · File photo

África do Sul / Northriding, Tirong Estate, Kya Sand and Noordhang

Evidência antiga

Bellairs North power outage: final cable jointing under way

City Power reports that crews are busy with the last cable jointing on the Bellairs North distributor at Houtkoppen Substation. Its 30 October 2026 notice names Northriding, Tirong Estate, Kya Sand and Noordhang as affected areas. The operator attributes the outage to cable theft and vandalism and says restoration will follow once repairs are complete.

Último status conhecido: restabelecido, segundo a fonte

Verificado pela YPS: 31 de out. de 2026, 11:57 UTC

África do Sul / Houtkoppen Substation, Johannesburg

Evidência antiga

Houtkoppen Substation, Johannesburg

Último status conhecido: restabelecido, segundo a fonte

Verificado pela YPS: 16 de nov. de 2026, 10:10 UTC

Hillbrow skyline and tower in Johannesburg
Johannesburg · File photo

África do Sul / Inchanga, Johannesburg

Evidência antiga

Inchanga power outage: City Power reports 84% of supply restored

City Power says 84% of power supply had been restored after an interruption in Inchanga. The Johannesburg utility attributed the outage to a cable fault in a notice naming Houtkoppen Substation. It said work would continue on the remaining 16% and gave no time for full restoration.

City Power says 84% of power supply was restored and work would continue on the remaining 16%.

Verificado pela YPS: 15 de nov. de 2026, 22:57 UTC

Johannesburg skyline beyond highways and green verges beneath a bright cloudy sky
Johannesburg · File photo

África do Sul / Kya Sands Estates, Johannesburg

Evidência antiga

Kya Sands Estates power outage: City Power reports supply restored

City Power reports that electricity supply has been fully restored to customers in Kya Sands Estates in Johannesburg. Its latest statement on 22 October 2026 identifies the Houtkoppen Substation Maroeladal No. 1 Distributor and attributes the outage to a cable fault. Restoration is the operator’s report; individual addresses have not been independently checked.

City Power reports Kya Sands Estates supply restored; individual addresses and the exact restoration time have not been independently confirmed.

Verificado pela YPS: 22 de out. de 2026, 20:07 UTC

Johannesburg skyline seen beyond roads and highway interchanges
Johannesburg · File photo

África do Sul / Farmall, Kya Sand Estate and Tirong

Evidência antiga

Farmall power restored, City Power says; Kya Sand Estate and Tirong included

City Power says electricity has been fully restored to Farmall, Kya Sand Estate and Tirong on the Maroeladal No. 1 distributor. Its 27 October 2026 update follows a notice about an earth-fault trip affecting the same three areas on 26 October. The operator says no fault was found during investigations; it gives no exact restoration time or affected-customer total.

City Power reports full restoration for Farmall, Kya Sand Estate and Tirong on the Maroeladal No. 1 distributor; exact completion time unknown.

Verificado pela YPS: 27 de out. de 2026, 08:55 UTC

Johannesburg skyline and highways
Johannesburg · File photo

África do Sul / Prichard North, Johannesburg

Evidência antiga

Prichard North power outage: City Power confirms restoration

City Power confirmed full restoration after the Prichard North distributor cable fault in a notice published at 10:48 SAST on Monday, 16 November. The operator named Cedar Creek, Cedar Lakes and Fourways Estate as the areas affected by that outage.

City Power confirmed full restoration for the Prichard North outage.

Verificado pela YPS: 16 de nov. de 2026, 09:11 UTC

Johannesburg skyline and illuminated buildings after dusk.
Johannesburg · File photo

África do Sul / Prichard North distributor, Houtkoppen Substation, Johannesburg

Evidência antiga

Prichard North power outage in Cedar Creek, Cedar Lakes and Fourways Estate

City Power reported a new Prichard North distributor trip on 16 November affecting customers in Cedar Creek, Cedar Lakes and Fourways Estate in Johannesburg. The utility said a team was on site repairing a cable fault. It had reported full restoration earlier that day for an interruption on 15 November in the same named areas.

City Power says a team is repairing a cable fault after the 16 November Prichard North trip.

Verificado pela YPS: 16 de nov. de 2026, 13:16 UTC

Hillbrow and the Johannesburg skyline.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Needwood and Maroeladal power outage: City Power names Houtkoppen Substation

City Power reported a power outage affecting customers in Needwood and Maroeladal on 16 November. The utility identified Houtkoppen Substation, RMU 639, and said existing faults prevented it from restoring supply through backfeeding.

City Power reported an outage affecting Needwood and Maroeladal customers and said existing faults blocked backfeeding.

Verificado pela YPS: 16 de nov. de 2026, 20:18 UTC

Johannesburg skyline at dusk with an illuminated tower and city buildings
Johannesburg · File photo

África do Sul / Houtkoppen

Evidência antiga

Houtkoppen power outage: City Power reports partial restoration

City Power reported partial restoration at Houtkoppen Substation on 20 October 2026, following an outage affecting customers in Tirong Estates, Kyasands Estates and Farmall. The operator said power had been restored “up to 60%”, while four load centres would remain off until a cable fault was located and repaired. No full-restoration deadline was given.

City Power reports partial restoration at Houtkoppen; four load centres remain off pending cable fault location and repair. No full-restoration deadline is given.

Verificado pela YPS: 20 de out. de 2026, 05:05 UTC

Prepared backup equipment arranged in a drawer
Ilustração de IA

África do Sul / Johannesburg · Hursthill Feederboard3

Evidência antiga

Hursthill Feederboard3 power outage: protection assessment awaited

City Power reports an outage on Hursthill Feederboard3 affecting Auckland Park, Crosby, Kathrada, Westdene, Melville and Richmond in Johannesburg. The operator places the interruption at approximately 15:00 SAST on 6 October 2026 and says a team is on site. It identifies a suspected protection-system fault, with a restoration estimate to follow the protection assessment. The preliminary cause is not a confirmed final diagnosis.

City Power post published at 18:48:39 SAST, 6 October: team on site for Hursthill Feederboard3; protection assessment and restoration estimate awaited.

Verificado pela YPS: 6 de out. de 2026, 17:50 UTC

Johannesburg skyline viewed from the highways
Johannesburg · File photo

África do Sul / Johannesburg · Hursthill

Evidência antiga

Hursthill power outage: no reported MV faults, earlier incident closure unclear

City Power says its Hursthill Service Delivery Centre currently has no reported medium voltage outages. The 17:01 SAST statement on 8 October shifts attention to outstanding low voltage service requests. It does not explicitly close the earlier cable fault affecting two load centres, so full restoration of that particular incident remains unconfirmed.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 16 de nov. de 2026, 06:06 UTC

Johannesburg skyline seen from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power reports power restored in Claremont, Johannesburg

City Power reported that power had returned to affected customers in Claremont, Johannesburg, in a Hursthill Substation update posted at 15:03 SAST on Monday, 9 November. The utility said the outage was reported on 7 November. The update did not give the time at which customers were reconnected.

City Power reported full restoration for affected Claremont customers in its 15:03 SAST update on 9 November.

Verificado pela YPS: 9 de nov. de 2026, 13:27 UTC

Johannesburg skyline with the Hillbrow Tower above nearby buildings.
Johannesburg · File photo

África do Sul / Hursthill Substation, Johannesburg

Evidência antiga

Hursthill outage: City Power reports power restored in Coronationville, Newclare and Westbury

City Power says electricity supply was fully restored in Coronationville, Newclare and Westbury after an outage at Hursthill Substation in Johannesburg. The utility announced the restoration on 16 November and said the outage had been reported on 15 November. It did not give the exact time power came back.

City Power reports full restoration in Coronationville, Newclare and Westbury; Paarlshoop’s status is unclear.

Verificado pela YPS: 16 de nov. de 2026, 12:05 UTC

High-rise buildings in Johannesburg’s Hillbrow district
Johannesburg · File photo

África do Sul / Hursthill Substation, Johannesburg

Evidência antiga

Hursthill power outage affects Auckland Park and Melville

City Power reported a power outage in parts of Johannesburg on Monday, 16 November, after incoming feeder No. 03 tripped at Hursthill Substation. The utility said its operators were on site and waiting for its protection team to investigate the cause.

City Power says operators are on site at Hursthill Substation awaiting the protection team.

Verificado pela YPS: 16 de nov. de 2026, 08:06 UTC

Johannesburg skyline beyond a highway interchange
Johannesburg · File photo

África do Sul / Sophiatown, Westdene and Martinadale

Evidência antiga

Sophiatown and Westdene power restored after cable repairs

City Power says repairs on the faulty cable at Hursthill Substation’s Triomf distributor are complete and power supply has been restored. Its latest notice on 30 October 2026 names Sophiatown and Westdene. The announcement follows an earlier missed restoration estimate and final cable jointing. Specific restoration in Martinadale, named in the original outage notice, remains unverified.

City Power reports completed cable repairs and restored supply in the Sophiatown and Westdene footprint; Martinadale’s specific restoration remains unverified.

Verificado pela YPS: 30 de out. de 2026, 20:48 UTC

Johannesburg skyline and illuminated buildings beneath an evening sky
Johannesburg · File photo

África do Sul / Hyde Park, Johannesburg

Evidência antiga

Hyde Park power outage: City Power reports Rosebank supply restored

City Power says supply has been restored at Rosebank Substation for the cable-fault outage affecting Hyde Park customers, reported on 17 October 2026. Its announcement was published at 18:49:21 SAST on 22 October. A resident reply disputes restoration without identifying an address or circuit, so the operator’s report does not establish that every individual connection has electricity.

22 October: City Power reports Rosebank Substation supply restored for Hyde Park; a resident disputes restoration at an unspecified location.

Verificado pela YPS: 22 de out. de 2026, 16:58 UTC

Johannesburg buildings and a tall communications tower beneath a bright, cloudy sky
Johannesburg · File photo

África do Sul / Industria, Johannesburg

Evidência antiga

Industria power outage: City Power reports full restoration

City Power reports that electricity has been fully restored to customers in Industria, Johannesburg, after a cable-fault interruption reported on the morning of 3 November 2026. The restoration statement was published that afternoon. It does not give the exact time when supply returned or the number of affected connections.

City Power reports full restoration in Industria; exact restoration completion time and affected connection count remain unknown.

Verificado pela YPS: 3 de nov. de 2026, 14:31 UTC

Hillbrow Tower above the Johannesburg skyline.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Industria and Riverlea power outage: Kudu Street still without power

City Power says electricity has returned to customers affected by the Industria Substation outage in Bosmont, Industria, Riverlea and Paarlshoop, except on Kudu Street. In its 14 November bulletin, the utility attributed the outage to a cable fault.

City Power says supply is back for the affected customers in the four named areas except on Kudu Street.

Verificado pela YPS: 14 de nov. de 2026, 15:39 UTC

Johannesburg buildings and the city skyline viewed from highways
Johannesburg · File photo

África do Sul / Jeppe, Johannesburg

Evidência antiga

Jeppe power outage: repairs underway, conditional 20:00 restoration estimate

City Power says the fault on the Cleveland Substation Jeppe Standby Distributor has been located and repairs are underway. Its 16 October update gives a conditional estimate of full restoration at 20:00 SAST that evening, provided work goes to plan. The operator links the interruption affecting customers in Jeppe to multiple cable faults reported on 14 October.

16 October, 13:32 SAST: City Power reports repairs underway on the Jeppe Standby Distributor; 20:00 SAST restoration remains a conditional estimate.

Verificado pela YPS: 16 de out. de 2026, 11:43 UTC

High-rise buildings on the Johannesburg skyline
Johannesburg · File photo

África do Sul / Jeppestown South, Johannesburg

Evidência antiga

Jeppestown South power outage: City Power reports up to 13% restoration

City Power reported restoration of up to 13% after a cable fault affecting customers in Jeppestown South, Johannesburg, on 16 November. The utility named the Jeppe Standby Distributor at Cleveland Substation and said work on the outstanding supply would continue on 17 November.

City Power reported up to 13% restoration in Jeppestown South and said work would continue on 17 November.

Verificado pela YPS: 16 de nov. de 2026, 20:18 UTC

Johannesburg skyline viewed across a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Central B outage: City Power reports 90% of supply restored

City Power said on 14 November that it had restored 90% of power supply in the Central B Substation outage affecting parts of Marshalltown and the Johannesburg CBD. The utility said it was having difficulty getting access from a building owner and gave no restoration estimate for the remaining portion.

City Power reports 90% of supply restored; building access delays the remainder.

Verificado pela YPS: 14 de nov. de 2026, 19:40 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power reports outage at Johannesburg Fresh Produce Market

City Power reported an unplanned power outage affecting Johannesburg’s Fresh Produce Market shortly after midnight on 17 November. The utility said safety concerns meant it would attend to the interruption in the morning. It gave no restoration time.

City Power reported an outage at the Fresh Produce Market and gave no restoration time.

Verificado pela YPS: 16 de nov. de 2026, 22:26 UTC

Hillbrow Tower above the Johannesburg skyline.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Longmeadow Business Estate power outage: City Power confirms restoration

City Power confirmed that power was restored at Longmeadow Business Estate in Johannesburg after a cable fault. It posted the confirmation on Thursday, 12 November, after reporting partial restoration earlier that day.

City Power reported power restored at Longmeadow Business Estate after a cable fault.

Verificado pela YPS: 13 de nov. de 2026, 19:22 UTC

Aerial view of illuminated buildings in Johannesburg at night.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Mayfair outage: City Power energises Hesdale transformer

City Power has energised one transformer at Hesdale Substation as it works to restore power after the Mayfair Substation outage in Johannesburg. Spokesperson Isaac Mangena told SABC that the utility intended to use the transformer for priority sites, including SABC and Netcare Garden City Hospital. The report did not confirm either site was back on grid power.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 16 de nov. de 2026, 19:21 UTC

Johannesburg skyline seen from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Prospect Substation power outage affects Selby and Marshalltown customers

City Power reported a power outage linked to a trip of Transformer 3 at Prospect Substation in Johannesburg on 16 November. The distributor named customers in Selby, Marshalltown, Johannesburg and City & Suburban as affected. It said operators had been notified and would be sent to investigate.

Transformer trip reported at Prospect Substation; City Power said operators would investigate.

Verificado pela YPS: 16 de nov. de 2026, 19:21 UTC

Aerial view of the Johannesburg skyline with illuminated buildings.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Johannesburg power outage: City Power names Oakdene, Mulbarton and three other areas

City Power reported a power outage affecting customers in Oakdene, Mulbarton, Turffontein, Forest Hill and Haddon on Thursday, 12 November. The Johannesburg utility posted the notice for its Reuven service area at 18:42 SAST and said operators had been notified and would be dispatched to investigate.

City Power reported an outage affecting customers in five areas and said operators would investigate. It gave no restoration estimate.

Verificado pela YPS: 12 de nov. de 2026, 17:52 UTC

Johannesburg skyline viewed across a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Johannesburg power outage interrupts pumping to Waterval Tower

Johannesburg Water said on 14 November that a City Power outage interrupted pumping to Waterval Tower and caused water levels to fall. The utility warned that people in the tower’s service area could have low pressure, intermittent water supply or no water. It gave no restoration time.

Johannesburg Water reports that a power outage interrupted pumping to Waterval Tower.

Verificado pela YPS: 14 de nov. de 2026, 18:38 UTC

Aerial view of illuminated buildings in Johannesburg at night.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Johnware outage in Marshalltown and Selby: City Power reports 93% of supply restored

City Power said on 14 November that it had restored 93% of power supply in the Johnware Substation outage affecting parts of Marshalltown and Selby in Johannesburg. The utility said concrete demolition was still underway and gave no time for the rest of the supply to return.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 15 de nov. de 2026, 17:55 UTC

Johannesburg skyline beneath clouds, with roads, cars and greenery in the foreground
Johannesburg · File photo

África do Sul / Jukskei Park, Johannesburg

Evidência antiga

Jukskei Park and Johannesburg North power restored, City Power says

City Power reports full restoration after a faulty cable outage affecting Jukskei Park and Johannesburg North. Its statement was published at 12:00 SAST on 19 October 2026. Maroeladal, named in the previous evening’s three-area interruption notice, is absent from this restoration update; its supply position cannot be inferred from that statement.

19 October, 12:00 SAST: City Power reports restoration after a faulty cable in Jukskei Park and Johannesburg North; Maroeladal is not named.

Verificado pela YPS: 19 de out. de 2026, 10:46 UTC

Hillbrow Tower above Johannesburg city buildings
Johannesburg · File photo

África do Sul / Wolhuter and City and Suburban

Evidência antiga

Kazerne outage: power restored in City and Suburban

City Power reports full restoration in City and Suburban after the Kazerne multiple-cable-fault outage reported on 26 October. Its 2 November 2026 announcement does not name Wolhuter, which was included in the earlier outage notice. The wider incident therefore remains recorded as partial restoration, with Wolhuter’s current supply status unverified.

City Power reports full restoration in City and Suburban; Wolhuter’s current supply status remains unverified.

Verificado pela YPS: 2 de nov. de 2026, 11:04 UTC

Johannesburg skyline viewed from a highway
Johannesburg · File photo

África do Sul / Kazerne Substation supply areas, Johannesburg

Evidência antiga

Kazerne power outage: City Power reports restoration in four Johannesburg areas

City Power reports full restoration of electricity in Drosty Park, Wolhunter, Jeppestown and New Doornfontein following a cable fault at Kazerne Substation. The operator published its statement on 25 October 2026. The precise time electricity returned, the outage start and the number of affected customers remain unknown.

City Power reports full restoration in Drosty Park, Wolhunter, Jeppestown and New Doornfontein following a Kazerne Substation cable fault.

Verificado pela YPS: 25 de out. de 2026, 13:18 UTC

Johannesburg skyline beyond curving highways and green roadside areas beneath a blue sky
Johannesburg · File photo

África do Sul / Kew West, Johannesburg

Evidência antiga

Kew West outage: separate Kew and Lombardy West notice on 22 October

City Power separately reported a power outage affecting customers in Kew and Lombardy West on 22 October 2026 and said operators would be dispatched. Its relationship to the 18 October Kew West outage remains unresolved. The newer notice does not establish four days of continuous interruption.

The 18 October Kew West investigation remains a separate record; the 22 October Kew and Lombardy West notice establishes no continuous duration or verified restoration.

Verificado pela YPS: 22 de out. de 2026, 06:51 UTC

Hillbrow Tower above Johannesburg buildings
Johannesburg · File photo

África do Sul / Klipfontein View

Evidência antiga

Klipfontein View power outage: City Power reports full restoration

City Power reports that power has been fully restored to customers in Klipfontein View, in Johannesburg’s Midrand service context. Its update was published at 00:18 SAST on 10 October 2026, following an earlier interruption that City Power attributed to a trip on Eskom’s side. The precise restoration time is not supplied.

10 October, 00:18 SAST: City Power reports full restoration in Klipfontein View following an interruption it attributed to an Eskom-side trip.

Verificado pela YPS: 9 de out. de 2026, 22:58 UTC

Johannesburg skyline in the evening
Johannesburg · File photo

África do Sul / Klipfontein, Johannesburg

Evidência antiga

Klipfontein View power outage: City Power reports full restoration

City Power reported full restoration of supply for the Klipfontein View outage at 11:55 SAST on Monday, 16 November. The utility attributed the outage to a fault on Eskom’s side. The update did not give the exact time power returned.

City Power reports full restoration for the Klipfontein View outage.

Verificado pela YPS: 16 de nov. de 2026, 10:10 UTC

Johannesburg skyline beyond highways, trees and an elevated road under a cloudy blue sky
Johannesburg · File photo

África do Sul / Klipfontein View, Johannesburg

Evidência antiga

Klipfontein View power outage: conditional 17:00 restoration estimate

City Power says repairs in Klipfontein View are ongoing and expects full restoration by 17:00 SAST on 22 October 2026, provided work proceeds as planned. The utility reports that approximately 20% of affected customers have had supply restored. This is a conditional estimate, with no confirmation that full restoration has occurred.

City Power reports repairs ongoing and approximately 20% of affected customers restored; full restoration is expected by 17:00 SAST on 22 October if work proceeds as planned.

Verificado pela YPS: 22 de out. de 2026, 11:51 UTC

Johannesburg skyline beyond curving highways and green roadside areas beneath a blue sky
Johannesburg · File photo

África do Sul / Kliptown, Johannesburg

Evidência antiga

Kliptown power outage: City Power reports full restoration

City Power says electricity has been fully restored to customers in Kliptown, Johannesburg, supplied through Nancefield Substation. In its 18 October 2026 update, the utility attributes the outage to a wire on the line. The exact onset, physical restoration time and affected-customer count remain unknown.

City Power reports full restoration in Kliptown in its 18 October, 11:01 SAST update and attributes the outage to a wire on the line; exact restoration time unknown.

Verificado pela YPS: 18 de out. de 2026, 09:23 UTC

Johannesburg buildings and Hillbrow Tower under a bright cloudy sky
Johannesburg · File photo

África do Sul / Kya Sand Estate

Evidência antiga

Kya Sand Estate power outage: supply trips again

City Power says electricity in Kya Sand Estate tripped immediately after it had been restored. The utility reports partial restoration and says further investigations on four load centres will take place on 3 November because the area is unsafe at night. Its latest notice concerns the estate supplied from Houtkoppen Substation in Johannesburg; no full-restoration deadline is confirmed.

City Power reports partial restoration in Kya Sand Estate; investigation is planned for 3 November, with no full-restoration deadline.

Verificado pela YPS: 2 de nov. de 2026, 21:10 UTC

Johannesburg skyline seen from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power reports Kya Sands restored; Tirong Estate status unconfirmed

City Power reported full restoration in Kya Sands in its Houtkoppen/Inadan notice at 23:44 SAST on 9 November. It had earlier reported cable repairs affecting Kya Sand Estate and Tirong Estate after an interruption dated 8 November. The late notice did not name Tirong Estate.

City Power reported restoration in Kya Sands at 23:44 SAST on 9 November. Tirong Estate’s status remains unconfirmed.

Verificado pela YPS: 10 de nov. de 2026, 05:36 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

La Rochelle power outage: City Power reports full restoration

City Power says it has fully restored power to affected customers in La Rochelle, Johannesburg. In its Sunday, 15 November update, the utility said repairs at Wemmer Substation were complete. It attributed the outage, reported on Friday, 13 November, to a cable fault.

City Power reports repairs complete and power fully restored to affected La Rochelle customers.

Verificado pela YPS: 15 de nov. de 2026, 13:55 UTC

Johannesburg skyline viewed beyond roads and buildings
Johannesburg · File photo

África do Sul / Booysens, Ophirton and Lakeview, Johannesburg

Evidência antiga

Booysens, Ophirton and Lakeview outage: cable fault identified

City Power says a cable fault between Medium Voltage Cable 111 and Medium Voltage Cable 70 is affecting Booysens, Ophirton and Lakeview. Its 1 November 2026 update says 13 load centres will remain off until the fault is located and repaired. No restoration time or affected-customer total is provided. The notice does not establish a continuous outage since the earlier Lakeview reports of 25 October.

City Power reports a cable fault affecting Booysens, Ophirton and Lakeview, with 13 load centres remaining off pending fault location and repair; no restoration time is given.

Verificado pela YPS: 1 de nov. de 2026, 09:36 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Laser Park, Johannesburg

Evidência antiga

Laser Park power restored after termination failure, City Power says

City Power reports that supply has been fully restored to affected customers in Laser Park, Johannesburg, after a termination failure. Its restoration statement identifies Christiaan De Wet Substation / Ridge Road Switching Station. The statement was published on 27 October 2026 at 16:41 SAST; the actual switch-on time remains unknown.

City Power reports full restoration to affected Laser Park customers supplied through Christiaan De Wet Substation / Ridge Road Switching Station after a termination failure.

Verificado pela YPS: 27 de out. de 2026, 15:53 UTC

Johannesburg skyline viewed from highways
Johannesburg · File photo

África do Sul / Lawley 1 and Ennerdale Extension 9

Evidência antiga

Lawley 1 and Ennerdale Extension 9 power restored, City Power says

City Power says electricity has been fully restored to customers in Lawley 1 and Ennerdale Extension 9, Johannesburg. Its latest Ennerdale Substation notice, published on 26 October 2026, attributes the outage to multiple attempted cable thefts. The operator dates the interruption to Friday, 23 October. The exact start and reconnection times, and the number of affected customers, remain unknown.

City Power reports full restoration in Lawley 1 and Ennerdale Extension 9. Exact reconnection time and customer count unknown.

Verificado pela YPS: 26 de out. de 2026, 11:29 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Lawley 1 and Ennerdale Extension 9

Evidência antiga

Lawley 1 and Ennerdale Extension 9 outage: operators dispatched

City Power says its operators have been dispatched to investigate an electricity outage affecting customers in Lawley 1 and Ennerdale Extension 9, Johannesburg. Its 07:52 SAST update on 12 October names both areas under Ennerdale Substation. The operator says the outage was reported in the early hours of that morning; an exact start time remains unknown.

12 October, 07:52 SAST: operators dispatched to investigate the outage affecting Lawley 1 and Ennerdale Extension 9; cause and restoration estimate unconfirmed.

Verificado pela YPS: 12 de out. de 2026, 06:18 UTC

Johannesburg skyline viewed from highways
Johannesburg · File photo

África do Sul / Lehae Phase 1

Evidência antiga

Lehae Phase 1 power restored, City Power reports

City Power reports that electricity has been restored to customers in Lehae Phase 1, Johannesburg. The operator says no fault was found. Its latest statement on 26 October 2026 follows an interruption reported around 22:12 SAST on 25 October. The exact time supply returned and the number of affected customers remain unknown.

City Power reports supply restored to Lehae Phase 1 and says no fault was found. Exact reconnection time unknown.

Verificado pela YPS: 26 de out. de 2026, 14:32 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Lehae and Zakariya Park power restored, City Power says

City Power confirmed in an update on 10 November that electricity had been restored to affected customers in Lehae phases 1 to 4 and Zakariya Park in Johannesburg. The utility attributed the outage reported the previous day to an equipment fault. It did not give an exact reconnection time or a customer count.

City Power confirmed restoration for affected customers in Lehae phases 1 to 4 and Zakariya Park.

Verificado pela YPS: 10 de nov. de 2026, 10:50 UTC

Illustrated drawer containing household emergency supplies
Ilustração de IA

África do Sul / Lenasia Extension 2 and Lenasia Extension 5

Evidência antiga

Lenasia extensions 2 and 5 power outage: operators dispatched

City Power says operators have been dispatched to investigate an outage affecting Lenasia extensions 2 and 5. The operator published the notice at 21:20 SAST on 29 October 2026. It identifies the two extensions and the dispatch of a team, but does not establish that operators have arrived or that the cause has been found.

City Power reports an outage in Lenasia extensions 2 and 5 and says operators have been dispatched to investigate; restoration is unconfirmed.

Verificado pela YPS: 29 de out. de 2026, 19:25 UTC

Daytime aerial view of Johannesburg buildings and the Hillbrow Tower under a bright, cloudy sky
Johannesburg · File photo

África do Sul / Lenasia Extension 1, Johannesburg

Evidência antiga

Lenasia Extension 1 power outage: City Power reports full restoration

City Power reports full restoration to customers in Lenasia Extension 1 in Johannesburg following a cable fault. Its 24 October statement explicitly refers to the outage reported on 20 October. The operator’s restoration notice supersedes the earlier updates about customers still without supply and work to expose the faulty cable.

City Power reports full restoration in Lenasia Extension 1 on 24 October for the outage reported on 20 October.

Verificado pela YPS: 24 de out. de 2026, 10:40 UTC

Johannesburg skyline beyond a highway interchange
Johannesburg · File photo

África do Sul / Lenasia Extension 1

Evidência antiga

Lenasia Extension 1: City Power reports 80% supply restoration

City Power reports that its operators have restored 80% of the power supply to customers in Lenasia Extension 1, Johannesburg, following an outage it attributes to a cable fault. In its 30 October 2026 update, the operator says the remaining customers will stay without power until repairs are completed. No restoration deadline is available.

City Power reports 80% power supply restoration in Lenasia Extension 1; remaining customers await repairs, with no completion deadline.

Verificado pela YPS: 30 de out. de 2026, 10:39 UTC

Hillbrow Tower above the Johannesburg city skyline
Johannesburg · File photo

África do Sul / Lenasia South Extension 4

Evidência antiga

Lenasia South Extension 4 power outage: operators onsite

City Power says operators are onsite investigating an outage affecting customers in parts of Lenasia South Extension 4, Johannesburg. Its statement, published at 09:23 SAST on 16 October 2026, says the outage was reported in the early hours that day. The cause, customer total and restoration time remain unknown.

16 October, 09:23 SAST: City Power reports onsite investigation in parts of Lenasia South Extension 4; cause and restoration time unknown.

Verificado pela YPS: 16 de out. de 2026, 07:40 UTC

Johannesburg buildings and the Hillbrow Tower beneath a cloudy sky
Johannesburg · File photo

África do Sul / Lombardy East and Rembrandt Park, Johannesburg

Evidência antiga

Lombardy East and Rembrandt Park power outage: up to 90% restored

City Power reports power restored up to 90% to customers in Lombardy East and Rembrandt Park, Johannesburg. The operator says the fault has been isolated, but work will continue on 25 October after unexpected challenges. It attributes the outage reported on 21 October 2026 to a vandalised chamber. Full-restoration timing remains unknown.

City Power reports up to 90% restored in Lombardy East and Rembrandt Park; fault isolated, work continues on 25 October and full-restoration timing is unknown.

Verificado pela YPS: 24 de out. de 2026, 19:36 UTC

Johannesburg skyline viewed from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Lombardy East and Rembrandt Park outage: City Power says about 95% of supply is back

City Power reported that about 95% of the affected electricity supply had been restored in Lombardy East and Rembrandt Park on 12 November. The Johannesburg utility named Alexandra Substation in its outage notices. A test team was still looking for the fault when the utility issued its afternoon update.

City Power reported about 95% of affected supply restored while its test team looked for the fault.

Verificado pela YPS: 12 de nov. de 2026, 13:45 UTC

View of buildings in Johannesburg’s Hillbrow area.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Longdale power outage: Two load centres still without power

City Power said on 14 November that power was partially restored after a cable fault in the Longdale outage at Industria Substation in Johannesburg. Two load centres were still off. The utility did not give a new restoration percentage.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 16 de nov. de 2026, 23:22 UTC

Johannesburg skyline and illuminated buildings after dusk.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Vlakfontein power outage: supply trips again in Extensions 1–3

City Power says electricity supply tripped again in Vlakfontein Extensions 1–3 on 16 November after an earlier restoration. The Johannesburg utility named Lotus Substation in the notice and said operators would be dispatched to investigate.

City Power reports a repeat trip in Vlakfontein Extensions 1–3 and says operators will investigate.

Verificado pela YPS: 16 de nov. de 2026, 14:12 UTC

Johannesburg skyline with buildings lit at dusk.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power reports Lufhereng power outage after mini-substation vandalism

City Power says vandalism at a mini-substation has cut electricity to customers on four streets in Lufhereng. The Johannesburg utility said on 14 November that repairs would start only after its Meter Services team verifies that the area meets an 80% electricity vending threshold. It gave no restoration time.

City Power attributes the outage to mini-substation vandalism and says repairs depend on the vending check.

Verificado pela YPS: 14 de nov. de 2026, 11:33 UTC

Johannesburg city buildings and a lit tower at dusk
Johannesburg · File photo

África do Sul / New Doornfontein, Johannesburg

Evidência antiga

New Doornfontein power outage: City Power investigates on site

City Power says operators are on site investigating the cause of an electricity outage affecting customers in New Doornfontein, Johannesburg. Its 3 November 2026 statement identifies Siemert Substation (Sivewright). The exact outage start, affected connection count, technical cause and restoration deadline remain unknown.

City Power reports an on-site investigation into the New Doornfontein outage; exact onset, cause and restoration time remain unknown.

Verificado pela YPS: 3 de nov. de 2026, 10:31 UTC

Johannesburg skyline beyond highways and trees
Johannesburg · File photo

África do Sul / Malvern, Johannesburg

Evidência antiga

Malvern power outage: replacement mini substation being sourced

City Power says customers on 13th Street in Malvern, Johannesburg, have been without electricity since September following vandalism at a mini substation at Jules and Loch streets. In its 28 October 2026 update, the utility says it is sourcing a replacement unit after the existing equipment failed final safety tests.

City Power says the Malvern mini substation replacement is being sourced; restored supply and a restoration deadline are unconfirmed.

Verificado pela YPS: 28 de out. de 2026, 17:37 UTC

Johannesburg buildings and the Hillbrow skyline
Johannesburg · File photo

África do Sul / Manufacta · Lindhaven, Grobler Park and Roodepoort West

Evidência antiga

Manufacta power outage: City Power reports full restoration

City Power reports full restoration after the Manufacta cable-fault interruption affecting customers in Lindhaven, Grobler Park and Roodepoort West. Its statement at 17:24 SAST on 17 October links the update to the outage reported on 15 October. The statement time is not the exact moment electricity returned.

17 October, 17:24 SAST: City Power reports full restoration for the Manufacta interruption; exact switching time unknown.

Verificado pela YPS: 17 de out. de 2026, 16:15 UTC

A laptop connected to a power bank and a table lamp connected to a portable power station on a wooden table
Ilustração de IA

África do Sul / Manufacta / Reefhaven

Evidência antiga

Manufacta power outage: City Power reports 84% of affected customers restored

City Power reports electricity supply restored to 84% of affected customers following the restoration of Transformer No. 2 at Manufacta Switching Station. Its 20 October 2026 notice says a technical team is investigating the cause of the outage affecting the remaining customers at Reefhaven Switching Station, Cedar No. 1. No restoration deadline is available.

20 October, 15:13 SAST: City Power reports 84% of affected customers restored; the remaining Reefhaven outage is under investigation, with no restoration deadline.

Verificado pela YPS: 20 de out. de 2026, 14:10 UTC

A divided wooden drawer holding a headlamp, lantern, power bank, radio and notebook
Ilustração de IA

África do Sul / Mapleton substation, Ekurhuleni

Evidência antiga

Mapleton power outage: Ekurhuleni reports substation restored

The City of Ekurhuleni reports that power has been restored at Mapleton substation following extensive repair work. Its statement was published on 3 November 2026. The electrical restoration announcement does not establish normal water service at every property or the electricity status of individual households.

Ekurhuleni reports power restored at Mapleton substation; exact completion time and completed water-service recovery remain unverified.

Verificado pela YPS: 3 de nov. de 2026, 22:38 UTC

Johannesburg buildings around Hillbrow Tower under a bright cloudy sky
Johannesburg · File photo

África do Sul / Vezinyawo, Johannesburg

Evidência antiga

Vezinyawo power outage: overhead-line work handed to day shift

City Power says faulty overhead lines are behind a power outage affecting Vezinyawo customers supplied from Marlboro Substation in Johannesburg. Its 28 October 2026 update says remaining work has been handed to the day shift because of safety concerns. The operator gives no restoration deadline.

City Power reports remaining overhead-line work for Vezinyawo customers; no restoration deadline or confirmed return of supply.

Verificado pela YPS: 28 de out. de 2026, 19:37 UTC

Johannesburg skyline above roads and buildings
Johannesburg · File photo

África do Sul / Main Street and Fox Street West, Johannesburg

Evidência antiga

Main Street restored; Fox West Street repair work planned for Monday

City Power says Main Street Distributor in Johannesburg is restored, while Fox West Street remains without power. In its latest statement on 25 October 2026, the utility says fault location and repairs will begin on Monday, 26 October. That is a plan for work to start, not a restoration deadline. An earlier correction reported Main Street restored and a small section of Fox Street West still off.

City Power says Main Street Distributor is restored; Fox West Street remains off, with fault location and repairs planned from Monday, 26 October. No completion time is established.

Verificado pela YPS: 25 de out. de 2026, 21:18 UTC

Aerial view of Johannesburg buildings and Hillbrow Tower beneath a bright, partly cloudy sky
Johannesburg · File photo

África do Sul / Marshalltown, Johannesburg

Evidência antiga

Marshalltown power outage: City Power reports full supply restored

City Power reports full electricity supply restored to the affected Central Substation areas: Marshalltown, parts of Inner City, Selby, Selby West, Selby East and Selby Central. Its 1 November 2026 update follows earlier staged reconnection. The operator statement establishes reported recovery for those named areas; it is not an independent check of electricity at every address.

City Power reports full supply restored to the named affected Central Substation areas, including Marshalltown and Selby; individual address status is unverified.

Verificado pela YPS: 1 de nov. de 2026, 07:30 UTC

Johannesburg buildings and Hillbrow Tower beneath a bright, cloudy sky
Johannesburg · File photo

África do Sul / Mayfair, Johannesburg

Evidência antiga

Mayfair power outage: City Power reports full restoration

City Power reports that electricity supply has been fully restored to customers at Mayfair on the Amalgam Standby Distributor. Its evening update on 3 November 2026 follows a morning outage attributed to blown terminations. The latest statement names Mayfair; it does not establish a wider Johannesburg all-clear or give the exact physical restoration time.

City Power reports full supply restored to Mayfair customers on the Amalgam Standby Distributor; exact restoration completion time remains unknown.

Verificado pela YPS: 3 de nov. de 2026, 18:34 UTC

Johannesburg skyline with tall buildings and roads in the foreground
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Mayfair Substation outage: City Power reports supply restored to five areas

City Power reports that electricity supply has been fully restored to customers in Amalgam, Crown, Crown Ext3, Laanglaagte and Paarlshoop following a Mayfair Substation double cable fault reported on 28 October 2026. The Johannesburg utility published the restoration update on 29 October. The exact switching time and affected-customer total are not supplied.

City Power reports electricity restored in Amalgam, Crown, Crown Ext3, Laanglaagte and Paarlshoop after the Mayfair Substation double cable fault.

Verificado pela YPS: 29 de out. de 2026, 08:06 UTC

Johannesburg skyline viewed from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power investigates Modderfontein power outage

City Power reported a power outage affecting customers in Modderfontein, Johannesburg, on the morning of Monday, 9 November. In its 10:13 South African Standard Time update, the utility said a team was already at Founders Hill Switching Station investigating the cause. It gave no estimate for when power would return.

City Power reported a power outage and an investigation. A restoration estimate remained unknown.

Verificado pela YPS: 9 de nov. de 2026, 08:20 UTC

Johannesburg skyline seen from nearby highways
Johannesburg · File photo

África do Sul / Market Boundary

Evidência antiga

Market Boundary power restored, City Power reports

City Power reports that full electricity supply has been restored to customers at Market Boundary in Johannesburg. Its Moffat Substation update on 31 October 2026 attributes the outage to a stolen cable and says it was reported on Thursday, 29 October. The exact reconnection time and affected-customer total remain unknown.

City Power reports full supply restored at Market Boundary; exact reconnection time remains unknown.

Verificado pela YPS: 31 de out. de 2026, 15:08 UTC

Johannesburg buildings and Hillbrow Tower in daylight
Johannesburg · File photo

África do Sul / Steeledale, Johannesburg

Evidência antiga

Steeledale power restored after cable fault, City Power says

City Power says electricity has been restored at Moffat Substation affecting Steeledale, Johannesburg, following a cable fault. The restoration notice was published at 01:29 SAST on 23 October 2026. It follows an earlier notice announcing that operators had been dispatched to investigate the interruption.

City Power reports restored supply at Moffat Substation affecting Steeledale after a cable fault; exact completion time unknown.

Verificado pela YPS: 23 de out. de 2026, 01:11 UTC

Johannesburg skyline seen beyond highways
Johannesburg · File photo

África do Sul / Moffat View, Johannesburg

Evidência antiga

Moffat View power restored after plug replacement, City Power says

City Power says medium-voltage plugs have been replaced and electricity is fully restored for the Moffat View outage reported on 26 October 2026. The operator published the restoration statement on 28 October. The exact completion time and affected-customer total remain unknown.

City Power says plugs have been replaced and power is fully restored for the Moffat View outage reported on 26 October.

Verificado pela YPS: 28 de out. de 2026, 18:36 UTC

Johannesburg buildings and skyline illuminated in the evening
Johannesburg · File photo

África do Sul / Mondeor and Winchester Hills

Evidência antiga

Mondeor and Winchester Hills: City Power reports power restored

City Power reports full restoration on the Mondeor Substation Adelaide Distributor serving Mondeor and Winchester Hills in Johannesburg, following a cable fault. Its announcement on 2 November 2026 follows an earlier on-site investigation. Exact switching time, physical onset and the number of affected connections remain unknown.

City Power reports full restoration following a cable fault.

Verificado pela YPS: 2 de nov. de 2026, 09:59 UTC

Johannesburg skyline with illuminated buildings after dark.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Motsoaledi power outage: City Power plans to resume cable repairs Monday

City Power says it plans to resume work on a faulty cable at Soweto Substation on Monday morning, 16 November, after technical difficulties delayed repairs. The outage was reported on Sunday, 15 November, and affects customers in Motsoaledi, Johannesburg.

City Power plans to resume cable repairs on Monday morning; no restoration time given.

Verificado pela YPS: 15 de nov. de 2026, 18:51 UTC

Johannesburg skyline viewed from a road interchange
Johannesburg · File photo

África do Sul / Motsoaledi

Evidência antiga

Motsoaledi outage: City Power cites cable theft, excavation planned

City Power attributes the electricity outage affecting customers in Motsoaledi to multiple incidents of cable theft. In its 11 October update, labelled “Soweto Substation”, the operator says concrete slabs are blocking access to affected cables. It is arranging excavation support for 12 October and sourcing repair materials. No restoration time has been announced.

11 October, 19:41 SAST: City Power cites cable theft affecting Motsoaledi, with excavation assistance planned for 12 October; no restoration time stated.

Verificado pela YPS: 12 de out. de 2026, 06:18 UTC

Hillbrow Tower above the Johannesburg cityscape
Johannesburg · File photo

África do Sul / Nancefield Industrial area

Evidência antiga

Nancefield Industrial power restored after cable-fault outage

City Power says electricity supply has been fully restored to customers in Nancefield Industrial, Johannesburg. Its notice appeared at 00:20 SAST on 9 October and explicitly links the outage to the cable fault reported on Tuesday, 6 October. This replaces the earlier partial-restoration position for that incident; it does not identify the exact switching time or the number of affected connections.

9 October, 00:20 SAST: City Power reports full restoration in Nancefield Industrial for the cable-fault outage reported on 6 October.

Verificado pela YPS: 8 de out. de 2026, 22:38 UTC

Johannesburg buildings and city lights at dusk.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Olifantsvlei power outage: City Power confirms restoration

City Power said power was restored at Olifantsvlei Wastewater Treatment Works in Johannesburg. The utility attributed the outage to a consumer fault in its 14:51 SAST notice on 11 November. It did not give the exact time electricity came back.

City Power reported restored power at Olifantsvlei Wastewater Treatment Works on 11 November.

Verificado pela YPS: 11 de nov. de 2026, 13:26 UTC

Johannesburg skyline at dusk with a tall tower and illuminated buildings beneath a blue and orange sky
Johannesburg · File photo

África do Sul / Nasrec and FNB

Evidência antiga

Nasrec and FNB power outage: City Power reports supply restored

City Power reports that electricity supply has been fully restored in Nasrec and FNB after a cable fault. The utility published the update on Tuesday 20 October 2026. The precise time of restoration and the duration of the interruption have not been established.

20 October: City Power reports supply fully restored in Nasrec and FNB after a cable fault.

Verificado pela YPS: 20 de out. de 2026, 19:06 UTC

Hillbrow Tower above the Johannesburg city skyline
Johannesburg · File photo

África do Sul / Nasrec

Evidência antiga

Nasrec power outage: City Power reports full restoration

City Power reports that electricity supply has been fully restored for the Crown Substation outage affecting customers in Nasrec, Johannesburg. The operator’s 11:23 SAST notice on 16 October attributes the outage to cable theft and says it was reported that day. The restoration statement is scoped to this incident; individual addresses have not been independently checked.

16 October, 11:23 SAST: City Power reports full restoration for the Crown Substation outage affecting Nasrec; cable theft is the operator’s attributed cause.

Verificado pela YPS: 16 de out. de 2026, 09:46 UTC

Johannesburg skyline viewed from highways
Johannesburg · File photo

África do Sul / Naturena distributor

Evidência antiga

Naturena power outage: City Power reports full restoration

City Power reports that power supply has been fully restored for the Naturena distributor at Eikenhof Substation in Johannesburg. Its 13:36 SAST update on 7 October 2026 says a faulty cable caused the outage affecting customers in Naturena. The outage was reported that day; the exact onset and actual restoration time remain unknown.

7 October, 13:36 SAST: City Power announces full restoration for the Naturena distributor after a faulty-cable outage.

Verificado pela YPS: 7 de out. de 2026, 12:16 UTC

Aerial view of Johannesburg buildings and Hillbrow Tower beneath a cloudy sky
Johannesburg · File photo

África do Sul / New Junction Mall, Johannesburg

Evidência antiga

New Junction Mall power outage: cable repairs in flooded tunnels

City Power says a power outage at New Junction Mall in Newtown, Johannesburg, was reported on 26 October 2026 and involves multiple cable faults. In an update on 28 October, the operator said teams were repairing a second fault in flooded tunnels. It gave a conditional restoration estimate of 16:00 that afternoon; electricity returning has not been confirmed.

City Power reports cable repairs at New Junction Mall; its conditional 16:00 estimate for 28 October does not confirm restoration.

Verificado pela YPS: 28 de out. de 2026, 14:30 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Noordwyk

Evidência antiga

Noordwyk power outage: City Power reports restoration after afternoon interruption

City Power reports full restoration to customers in Noordwyk for an outage reported on the afternoon of 15 October 2026. The operator attributes this specific interruption to an Eskom fault. Its evening statement does not provide the exact restoration time, customer count or technical details of that fault.

15 October, 20:29 SAST: City Power reports full restoration for the Noordwyk afternoon outage, attributed to an Eskom fault; exact restoration time unknown.

Verificado pela YPS: 15 de out. de 2026, 18:36 UTC

Illustrated drawer containing household backup supplies
Ilustração de IA

África do Sul / Noordwyk · Country View · Sagewood

Evidência antiga

Noordwyk and Country View: City Power reports power restored

City Power reports that power has been fully restored to customers in Noordwyk, Country View and parts of Sagewood. Its announcement was published at 00:23 SAST on 8 October. The operator attributes the outage reported on 7 October to a cable fault; the exact time electricity returned is not specified.

8 October, 00:23 SAST: City Power reports full restoration in Noordwyk, Country View and parts of Sagewood.

Verificado pela YPS: 7 de out. de 2026, 23:23 UTC

Johannesburg skyline viewed across highways
Johannesburg · File photo

África do Sul / Johannesburg · Noordwyk Substation, Midrand

Evidência antiga

Sagewood power outage: City Power reports full restoration

City Power reports that power supply has been fully restored in Sagewood following the Noordwyk Substation outage. Its 15:02 SAST bulletin on 9 October says double faults affected customers in the area. This restoration announcement supersedes the morning notice that the test branch team was locating a cable fault affecting the remaining 12% of customers.

9 October, 15:02 SAST: City Power reports full power supply restored in Sagewood after double faults.

Verificado pela YPS: 9 de out. de 2026, 13:56 UTC

Hillbrow Tower rising above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Fairlands, Roosevelt and Northcliff, Johannesburg

Evidência antiga

Fairlands, Roosevelt and Northcliff: City Power reports power restored

City Power reports that electricity has been restored to customers in Fairlands, Roosevelt and Northcliff, Johannesburg, following a cable fault at Roosevelt Park Substation. The operator issued its restoration statement on 25 October 2026. The exact time supply returned, the outage start and the number of affected customers remain unknown.

25 October: City Power reports power restored in Fairlands, Roosevelt and Northcliff following a cable fault at Roosevelt Park Substation.

Verificado pela YPS: 28 de out. de 2026, 22:44 UTC

Johannesburg skyline seen from a highway
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Northcliff West, Greymont and Hursthill power restored, City Power says

City Power reported full power restoration in Northcliff West, Greymont and Hursthill on 14 November. The update covers the Hursthill Substation outage reported on 11 November, which the Johannesburg utility attributed to vandalism.

City Power reports full supply restoration for the 11 November Hursthill Substation outage.

Verificado pela YPS: 14 de nov. de 2026, 13:32 UTC

Johannesburg buildings and skyline at dusk.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Northcliff power update: City Power tests new Mark Avenue mini-substation

City Power said on 10 November that it had installed a replacement mini-substation serving Mark Avenue in Northcliff, Johannesburg. The utility was testing the equipment before starting restoration. Its update did not confirm that customers were back on regular supply.

City Power says the Mark Avenue replacement is installed and under test. A return to regular supply remains unconfirmed.

Verificado pela YPS: 10 de nov. de 2026, 13:54 UTC

Hillbrow Tower rising above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Northcliff

Evidência antiga

Northcliff power outage: City Power plans investigation

City Power has acknowledged an electricity outage affecting customers in Northcliff, Johannesburg. In a notice published at 21:46 SAST on 11 October, the operator said its operators had been notified and would be dispatched to investigate the cause. The statement does not confirm their arrival, identify a fault or provide a restoration estimate.

11 October, 21:46 SAST: City Power acknowledges the Northcliff outage and plans an investigation.

Verificado pela YPS: 12 de out. de 2026, 02:05 UTC

Johannesburg skyline with buildings and roads
Johannesburg · File photo

África do Sul / Houtkoppen and surrounding areas

Evidência antiga

Houtkoppen power outage: rain suspends Bernie line repairs

Heavy rain has suspended repairs to snapped overhead lines on the Houtkoppen Bernie Distributor, City Power says. Its evening update on 2 November 2026 names Kya Sands, Farmall, Tirong Estates and Inadan as affected areas and says work is planned to resume the following morning. The operator links the interruption to 1 November. It gives no restoration deadline or verified customer total.

City Power says heavy rain has suspended Bernie Distributor repairs affecting Kya Sands, Farmall, Tirong Estates and Inadan; work is planned to resume on 3 November morning, with no restoration deadline.

Verificado pela YPS: 2 de nov. de 2026, 18:10 UTC

Johannesburg skyline viewed from a distance.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Northriding and Northgate power restored after Olivenhout outage

City Power confirmed that it had restored electricity to customers affected by the Olivenhout outage in Northriding and Northgate, Johannesburg. In an update posted shortly after midnight on Friday, 13 November, the utility attributed the outage to a cable fault. It said the outage had been reported on Thursday, 12 November.

City Power confirmed full restoration for customers affected by the Olivenhout cable fault in Northriding and Northgate.

Verificado pela YPS: 12 de nov. de 2026, 22:53 UTC

Buildings across the Johannesburg skyline.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Northriding power outage: City Power reports Tourmaline earth fault

City Power reported an earth-fault trip on the Tourmaline distributor at Northriding 11 kV Substation in Johannesburg on 11 November. Its notice named affected customers in Northwold, Boskruin, Bromhof and Sundowner. The operator said crews were on site and did not give a restoration time.

City Power reported a Tourmaline earth fault and gave no restoration time.

Verificado pela YPS: 11 de nov. de 2026, 07:21 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Northwold and Sundowner: City Power confirms cable outage repair

City Power confirmed on 10 November that repairs were complete and power had returned to affected customers in Northwold and Sundowner. The outage followed a trip on the Tourmaline distributor at Northriding 11 kV Substation in Johannesburg. City Power reported a separate earth fault on the same distributor the next morning.

City Power confirmed restoration after the 10 November cable fault in Northwold and Sundowner.

Verificado pela YPS: 11 de nov. de 2026, 07:21 UTC

Johannesburg skyline seen beyond roads and buildings
Johannesburg · File photo

África do Sul / Northwold, Johannesburg

Evidência antiga

Northwold and Sheronlea: City Power reports full restoration

City Power reports that power has been fully restored on the Lima Distributor at Olivedale Substation following cable theft affecting customers in Northwold and Sheronlea, Johannesburg. The operator published its restoration notice on 27 October 2026. The exact switching time, total number of affected customers and complete address boundary remain unknown.

City Power reports full restoration on the Lima Distributor serving affected Northwold and Sheronlea customers; exact completion time unknown.

Verificado pela YPS: 27 de out. de 2026, 16:59 UTC

Johannesburg buildings and Hillbrow Tower beneath a cloudy sky
Johannesburg · File photo

África do Sul / Observatory, Johannesburg

Evidência antiga

Observatory outage: repairs continue on Broadway and 6th Street

City Power says repairs continue after the Observatory Substation outage reported on 22 October. Its 28 October update names Broadway and 6th Street in the affected Bez Valley, Dewetshof and Kensington area and says restoration efforts remain at 95%. The operator gives no completion time or customer total.

City Power’s 28 October update says restoration efforts remain at 95%; Broadway and 6th Street still affected, no completion time.

Verificado pela YPS: 28 de out. de 2026, 15:37 UTC

África do Sul / Johannesburg · Observatory Substation

Evidência antiga

Johannesburg · Observatory Substation

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 8 de out. de 2026, 02:28 UTC

Johannesburg city skyline with illuminated buildings in the evening
Johannesburg · File photo

África do Sul / Kensington

Evidência antiga

Kensington power restored in four named areas, City Power says

City Power reports full electricity supply restored to customers in Sovereign Parks, Reddam, Bedford Gate and Smith Street in Kensington. Its Observatory Substation notice, published at 13:48 SAST on 11 October, identifies the outage as reported on 5 October due to a cable fault. The announcement gives no exact switching time or affected customer total.

11 October, 13:48 SAST: City Power announces full supply restored in the four named Kensington areas; exact switching time unknown.

Verificado pela YPS: 11 de out. de 2026, 11:57 UTC

Johannesburg skyline beyond curving roads, trees and highway bridges under a cloudy blue sky
Johannesburg · File photo

África do Sul / Production Road, Amalgam

Evidência antiga

Production Road power outage: City Power says repairs complete, restoration pending

City Power says repairs are complete following a cable fault affecting customers on Production Road in Amalgam, Johannesburg. Its Mayfair Substation update says the outage is ready for restoration. That is a repair-progress statement: the checked notice does not confirm that electricity has returned to affected customers.

21 October, 00:25 SAST update: City Power says Production Road repairs are complete and ready for restoration; electricity returning is unconfirmed.

Verificado pela YPS: 20 de out. de 2026, 23:09 UTC

Johannesburg skyline viewed across roads and buildings
Johannesburg · File photo

África do Sul / Johannesburg · Olivedale Substation, Windsorway Distributor

Evidência antiga

Olivedale Windsorway power outage: City Power reports full restoration

City Power reports full supply restoration for the Windsorway Distributor interruption at Olivedale Substation in Johannesburg. The earlier notice linked an unplanned interruption in Sheronlea, Northwold, part of Northriding and surrounding areas to an earth-fault trip. The restoration update was published at 16:04 SAST on 6 October. That publication time does not establish the exact moment electricity returned.

City Power update published at 16:04 SAST, 6 October: full supply restoration reported for the named Windsorway Distributor incident.

Verificado pela YPS: 6 de out. de 2026, 14:48 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Orange Grove power outage: City Power reports another trip during restoration

City Power reported another trip during restoration work on 16 November for the power outage affecting Orange Grove, Mountain View and Fairwood. The Johannesburg utility said 95% of power supply had been restored and that it had asked its testing team to verify the fault.

City Power reports another trip during restoration and puts restored power supply at 95%.

Verificado pela YPS: 16 de nov. de 2026, 14:12 UTC

Johannesburg skyline viewed across highways
Johannesburg · File photo

África do Sul / Johannesburg · Orlando Switching Station supply

Evidência antiga

Orlando maintenance outage: City Power reports supply restored

City Power reports that full supply has been restored to the named Johannesburg customers affected by planned maintenance associated with Orlando Switching Station. Its follow-up notice on 10 October covers the same listed areas as the earlier maintenance overrun. The restoration statement applies to that maintenance scope; it does not establish the status of every unrelated interruption in Johannesburg.

City Power reports full supply restored after planned Orlando maintenance to the named customers; separate interruptions are outside this statement.

Verificado pela YPS: 11 de out. de 2026, 01:37 UTC

Johannesburg city buildings and a lit tower at dusk
Johannesburg · File photo

África do Sul / Ormonde, Johannesburg

Evidência antiga

Ormonde power outage: City Power reports partial restoration

City Power reports partial restoration at Robertsham Substation for customers in Ormonde, Johannesburg, in its 23:26 SAST update on 22 October 2026. The operator says a faulty mini substation must be tested before repairs can take place. An earlier full-restoration statement remains unresolved against this later account.

City Power’s latest notice reports partial restoration; its relationship to the earlier full-restoration statement remains unresolved.

Verificado pela YPS: 22 de out. de 2026, 22:04 UTC

Johannesburg city buildings in an archive view
Johannesburg · File photo

África do Sul / Pappegaaisberg

Evidência antiga

Pappegaaisberg outage: City Power investigates three streets

City Power says a resource has been dispatched to investigate a power outage affecting customers in Amanda Street, Albertina Sisulu Street and Pappegaaisberg Street. The operator’s 11 October update says the interruption was reported the previous night, 10 October. The cause and a restoration time have not been established.

City Power reports an investigation dispatched for the three named Pappegaaisberg streets; restoration is not confirmed.

Verificado pela YPS: 11 de out. de 2026, 06:40 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Parkhurst power outage: City Power reports up to 65% of affected customers restored

City Power reported that up to 65% of affected customers had power back after an outage at Parkhurst Substation in Johannesburg. The utility’s Friday, 13 November update named Emmarentia, Greenside, Parkview and Parkwood and said operators were on site.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 13 de nov. de 2026, 16:18 UTC

Johannesburg buildings and Hillbrow Tower beneath a bright, partly cloudy sky
Johannesburg · File photo

África do Sul / Parkwood, Johannesburg

Evidência antiga

Parkwood power outage: Rosebank maintenance overrun delays restoration

City Power reports an overrun of planned maintenance at Rosebank Substation affecting customers along four streets in Parkwood, Johannesburg, on 29 October 2026. The utility says maintenance is complete and its team is preparing to begin restoring electricity. That preparation does not confirm that supply has already returned.

City Power says Rosebank maintenance is complete after an overrun affecting four Parkwood streets; supply restoration is not yet confirmed.

Verificado pela YPS: 29 de out. de 2026, 15:21 UTC

Emergency preparation items arranged in a drawer
Ilustração de IA

África do Sul / Pennyville Phase 5 transformer

Evidência antiga

Pennyville Phase 5: City Power reports transformer supply restored

City Power reports that it has restored electricity to the affected Pennyville community after replacing a burnt transformer and removing identified illegal connections. A second statement identifies the transformer as Pennyville Phase 5. The operator’s two 8 October notices differ on whether the customer audit is complete or still to follow.

8 October: City Power reports Pennyville Phase 5 transformer supply restored to the affected community; audit sequencing remains unclear.

Verificado pela YPS: 8 de out. de 2026, 16:37 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Wilgeheuwel

Evidência antiga

Wilgeheuwel power outage: City Power restores Florin Lifestyle supply

City Power confirmed on Friday, 13 November, that power was fully restored to the Florin Lifestyle supply in Wilgeheuwel, Roodepoort, after a cable fault. The previous update identified three load centres that were still off.

City Power confirmed full restoration for the Florin Lifestyle supply in Wilgeheuwel after a cable fault.

Verificado pela YPS: 13 de nov. de 2026, 15:11 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Pimville Zone 9 power outage: City Power reports partial restoration

City Power said at 17:15 SAST on Monday, 9 November, that it had restored about 35% of electricity supply in Pimville Zone 9, Johannesburg. Repairs were still in progress. The utility did not give a time for full restoration.

City Power reported about 35% of supply restored in Pimville Zone 9 at 17:15 SAST on 9 November. Repairs were continuing.

Verificado pela YPS: 9 de nov. de 2026, 15:29 UTC

Johannesburg skyline above roads, vehicles and trees beneath a cloudy blue sky
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Kya Sand and Northriding AH: City Power reports supply restored

City Power reports power supply fully restored following the cable-theft outage at Precission Switching Station, naming Northriding AH in its 20 October 2026 all-clear. Earlier updates described affected customers in parts of Kya Sand and Northriding AH. The announcement confirms the operator’s reported restoration; the exact physical restoration time and individual address conditions have not been independently verified.

20 October, 08:29 SAST: City Power reports power supply fully restored following the Precission Switching Station cable-theft outage.

Verificado pela YPS: 20 de out. de 2026, 07:05 UTC

Johannesburg skyline beyond urban roads and buildings
Johannesburg · File photo

África do Sul / Princess

Evidência antiga

Princess power restored after overhead line fault, City Power says

City Power says electricity has been fully restored at Princess, in Roodepoort, Johannesburg, following the outage reported on 16 October 2026. Its update at 17:01 SAST on 17 October identifies an overhead line fault as the cause. The exact restoration time and affected customer total remain unknown.

17 October, 17:01 SAST: City Power reports full restoration at Princess following an overhead line fault; exact switching time unknown.

Verificado pela YPS: 17 de out. de 2026, 15:09 UTC

Johannesburg skyline beyond curving roads and green vegetation under a partly cloudy sky
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Rabie Ridge Extension 02 power restored after cable fault, City Power says

City Power reports full restoration of electricity to customers affected by the Rabie Ridge Extension 02 outage in the Midrand area of Johannesburg. Its 19 October 2026 update attributes the interruption to a faulty cable. The restoration statement was published at 11:15 SAST; the exact switching time and number of affected customers remain unknown.

19 October, 11:15 SAST: City Power reports full restoration in Rabie Ridge Extension 02 after a faulty cable; exact switching time unknown.

Verificado pela YPS: 19 de out. de 2026, 09:37 UTC

Johannesburg skyline beyond a highway interchange
Johannesburg · File photo

África do Sul / Mayibuye and Rabie Ridge

Evidência antiga

Rabie Ridge power restored; Mayibuye still without electricity

City Power says repairs have begun on the cable-theft outage in Mayibuye, Midrand, Johannesburg. In its latest update on 30 October 2026, the operator anticipates restoring supply by 22:00 SAST that day, provided the work goes as planned. Its earlier update reported electricity restored to customers in Rabie Ridge Extensions 1, 2 and 5.

City Power reports Rabie Ridge Extensions 1, 2 and 5 restored; Mayibuye repairs have begun with a conditional 22:00 SAST target on 30 October.

Verificado pela YPS: 30 de out. de 2026, 14:39 UTC

Johannesburg skyline beyond curving roads, trees and highway bridges beneath a blue, cloudy sky
Johannesburg · File photo

África do Sul / Radiokop, Johannesburg

Evidência antiga

Radiokop power outage: City Power investigates on site

City Power says its team is on site investigating the cause of the electricity outage affecting customers in Radiokop, Johannesburg. The utility identifies Boothill Switching Station in its 3 November 2026 update. A confirmed technical cause, affected connection count and restoration estimate remain unavailable. The exact outage onset and address boundary are also unknown.

City Power names Boothill Switching Station in the Radiokop outage and says its team is investigating on site; cause and restoration time remain unknown.

Verificado pela YPS: 3 de nov. de 2026, 09:26 UTC

Johannesburg skyline at dusk
Johannesburg · File photo

África do Sul / Randjespark, Johannesburg

Evidência antiga

Randjespark power outage: City Power reports about 93% of supply restored

City Power reported on Friday, 13 November that about 93% of the power supply had been restored after the Randjespark outage in Johannesburg. The utility said it had discovered a further fault the previous night affecting customers along Olifantsfontein Road.

Último status conhecido: parcialmente restabelecido

Verificado pela YPS: 13 de nov. de 2026, 14:15 UTC

Hillbrow Tower above the Johannesburg skyline
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Randpark Ridge power outage: City Power reports supply restored

City Power reported full restoration for the outage that affected customers in Randpark Ridge, Johannesburg. It identified a cable fault on the Ouhout Distributor at Beyers Naudé Substation. The utility posted its restoration notice at 14:52 SAST on 12 November and gave no exact restoration time.

City Power reported full restoration for the Ouhout Distributor cable fault at Beyers Naudé Substation.

Verificado pela YPS: 12 de nov. de 2026, 13:45 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Robertsham

Evidência antiga

Robertsham power outage: City Power reports restoration on two streets

City Power reports full restoration to customers on Masasa and Akere Street in Robertsham. The operator attributes the interruption to a faulty cable and says it was reported on 13 October 2026. Its restoration statement was published on 15 October; the exact time supply returned and the number of affected customers remain unknown.

15 October, 19:19 SAST: City Power reports full restoration to customers on Masasa and Akere Street; exact restoration time unknown.

Verificado pela YPS: 15 de out. de 2026, 17:33 UTC

Johannesburg skyline beyond highways, trees and traffic under a blue and cloudy sky
Johannesburg · File photo

África do Sul / Robertville, Johannesburg

Evidência antiga

Robertville power restored at Domkrag Switching Station, City Power says

City Power reports full restoration of power supply at Domkrag Switching Station in Robertville, Johannesburg. In its update on 29 October 2026, the utility attributes the outage to a low-voltage termination failure. The announcement does not provide an exact switching time or an affected-customer total.

City Power reports full restoration at Domkrag Switching Station in Robertville following a low-voltage termination failure; exact switching time unknown.

Verificado pela YPS: 29 de out. de 2026, 13:15 UTC

Johannesburg skyline viewed from highways
Johannesburg · File photo

África do Sul / Roodekrans

Evidência antiga

Roodekrans power outage: City Power reports full supply restored

City Power reports full supply restored in Roodekrans following an outage caused by multiple cable faults. Its Wilropark Substation bulletin was published at 12:58 SAST on 9 October. This supersedes its morning report that four mini substations remained off, but does not identify the exact final switching time or verify supply at every individual address.

9 October, 12:58 SAST: City Power reports full supply restored in Roodekrans after multiple cable faults.

Verificado pela YPS: 9 de out. de 2026, 11:56 UTC

Johannesburg skyline with buildings lit at dusk.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Power restored in Allen’s Nek, Laser Park and Weltevreden Park

City Power confirmed on 14 November that power had been fully restored to customers affected by the Panorama Switching Station outage in Allen’s Nek, Laser Park and Weltevreden Park. The utility had reported the outage the previous evening.

City Power reports full restoration for customers affected by the Panorama Switching Station outage.

Verificado pela YPS: 14 de nov. de 2026, 06:28 UTC

Johannesburg skyline seen from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Clearwater power outage follows switching station explosion

City Power reported a power outage after an explosion at Clearwater Switching Station in Johannesburg on 10 November. The utility named affected customers in Weltevredenpark, Little Falls, Strubensvalley and Eagle Canyon. It said it would assess the damage and investigate the cause before repairs could start.

City Power reported the Clearwater outage after an explosion. Wider restoration remains unconfirmed in the notices reviewed.

Verificado pela YPS: 10 de nov. de 2026, 12:49 UTC

Johannesburg skyline viewed from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Florida Glen power outage: City Power reports full restoration

City Power says it has fully restored supply after the cable theft outage at Florida Glen Substation in Johannesburg. The Sunday, 15 November update names Florida Glen, Quellerina, Industria North, Bergbron and Northcliff Ext 19. The utility said the outage was reported on Saturday, 14 November.

City Power reports full restoration after the Florida Glen Substation cable theft outage.

Verificado pela YPS: 15 de nov. de 2026, 14:51 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Florida Lake, Hamberg and Georginia outage: City Power sourcing cable repair materials

City Power says crews were sourcing materials on Sunday, 15 November, to repair a cable fault at the Mechanical Workshop Switching Station. The outage was reported on Saturday in Florida Lake, Hamberg and Georginia. The utility said one load centre would stay off until repairs were complete.

City Power says crews are sourcing materials and one load centre will stay off until repairs are complete.

Verificado pela YPS: 16 de nov. de 2026, 06:06 UTC

Hillbrow Tower rising above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Roodepoort Industrial Area

Evidência antiga

Roodepoort Industrial Area outage: four load centres await repairs

City Power says four load centres will remain without electricity until repairs to the burnt mini-substation are completed in the Roodepoort Industrial Area interruption. Its latest update on 26 October 2026 follows an earlier notice identifying Iodene Mini-Substation in Johannesburg. The operator gives no restoration deadline or affected-customer count.

City Power says four load centres remain without electricity pending burnt mini-substation repairs. No restoration estimate given.

Verificado pela YPS: 26 de out. de 2026, 14:32 UTC

Johannesburg skyline seen from surrounding highways
Johannesburg · File photo

África do Sul / Roodepoort

Evidência antiga

Matholesville power outage: cable fault search continues

City Power says test branch is on site helping locate the cable fault affecting Matholesville Change House and Matholesville Kiosk before repairs can begin. Its 11 October notice, published at 11:07 SAST under Roodepoort Substation, gives no restoration estimate. This follows a 10 October notice saying a fault had been located and repairs would begin; the latest wording does not confirm completed repairs or restored supply.

11 October, 11:07 SAST: City Power reports fault-location work at Matholesville Change House and Kiosk before cable repairs; no restoration estimate.

Verificado pela YPS: 11 de out. de 2026, 09:50 UTC

Johannesburg skyline and surrounding roads
Johannesburg · File photo

África do Sul / Johannesburg · Roosevelt

Evidência antiga

Northcliff, Blackheath and Berario: City Power reports full restoration

City Power reports that power has been fully restored following the Roosevelt Substation outage affecting Northcliff, Blackheath and Berario in Johannesburg. The announcement was published at 23:24 SAST on 7 October. That is the update time, not an exact measured switch-on time for every connection.

7 October, 23:24 SAST: City Power announces full restoration for the Roosevelt Substation outage in Northcliff, Blackheath and Berario.

Verificado pela YPS: 7 de out. de 2026, 22:21 UTC

Johannesburg skyline seen from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Emmarentia and Roosevelt Park outage: Braids Street still off

City Power reported on 8 November that power had been restored to up to 99% of affected customers in Emmarentia and Roosevelt Park. Braids Street in Emmarentia remained without power in that update. The operator attributed the remaining interruption there to a cable fault between the Mtata & Komatie transformer substation and minisubstation 029497.

City Power reported up to 99% restoration among affected customers. Braids Street remained off.

Verificado pela YPS: 8 de nov. de 2026, 19:09 UTC

Hillbrow Tower rising above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power reports power restored in Waterval Estate and Northcliff

City Power says electricity has been restored to affected customers in Waterval Estate, Franklin Roosevelt and Northcliff. The Johannesburg utility named Roosevelt Park Substation in its evening update on 8 November. Earlier that day it had reported a suspected power outage in Waterval Estate and said operators would investigate.

City Power reported full restoration for affected customers in Waterval Estate, Franklin Roosevelt and Northcliff.

Verificado pela YPS: 9 de nov. de 2026, 00:18 UTC

Johannesburg buildings and the Hillbrow skyline
Johannesburg · File photo

África do Sul / Rosebank

Evidência antiga

Rosebank power outage: City Power reports Sturdee Road supply restored

City Power reports that power supply has been fully restored for the Rosebank Substation Sturdee Road Distributor outage. Its statement on 16 October links the interruption to a cable fault on Wednesday night, 14 October. The announcement concerns this named distributor; it does not provide an independent check of electricity at individual addresses.

16 October, 13:28 SAST: City Power reports this Sturdee Road Distributor incident restored; individual addresses have not been independently verified.

Verificado pela YPS: 16 de out. de 2026, 11:43 UTC

Hillbrow Tower above the buildings of Johannesburg.
Johannesburg · File photo

África do Sul / Wilgeheuwel, Johannesburg

Evidência antiga

Wilgeheuwel power outage: City Power reports full restoration at Sterretjie

City Power reported full restoration at the Sterretjie Townhouse Distributor in Wilgeheuwel early on Saturday, 14 November. The utility attributed the outage to a cable fault and said the interruption was reported on 12 November.

City Power reported full restoration at the Sterretjie Townhouse Distributor after a cable fault.

Verificado pela YPS: 13 de nov. de 2026, 23:19 UTC

Johannesburg skyline above curving roads, traffic and green verges in daylight
Johannesburg · File photo

África do Sul / Sandringham, Johannesburg

Evidência antiga

Sandringham power outage: City Power reports supply restored

City Power reports that electricity has been restored to customers in Sandringham, Johannesburg, supplied through Gresswold Substation. Its notice on 18 October 2026 attributes the outage to a cable fault. The utility had acknowledged an interruption in Sandringham on 17 October, but the later notice does not explicitly repeat that date or provide an incident number.

City Power reports supply restored to Sandringham in its 18 October, 14:12 SAST notice; exact onset, physical restoration time and customer count remain unknown.

Verificado pela YPS: 18 de out. de 2026, 12:25 UTC

Hillbrow Tower rising above Johannesburg buildings
Johannesburg · File photo

África do Sul / Saxonwold, Johannesburg

Evidência antiga

Saxonwold power outage: City Power investigates parts of the suburb

City Power says operators are on site investigating a power outage affecting customers in parts of Saxonwold, Johannesburg. Its 25 October 2026 announcement identifies Rosebank Substation and says the investigation findings will guide restoration strategies. The checked statement gives no cause, affected-customer count or restoration estimate.

City Power reports an on-site investigation into an outage in parts of Saxonwold; no restoration estimate is available.

Verificado pela YPS: 25 de out. de 2026, 19:18 UTC

Hillbrow Tower rising above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Booysens Road and Rogers Street, Selby, Johannesburg

Evidência antiga

Selby power outage: City Power reports restoration on Booysens Road and Rogers Street

City Power reports that electricity has been fully restored to customers on Booysens Road and Rogers Street in Selby, Johannesburg. Its 25 October 2026 statement identifies Central Substation. The cause of the interruption, the number of affected customers and the precise time supply returned are not established by the available notice.

City Power reports full restoration to customers on Booysens Road and Rogers Street in Selby; the notice identifies Central Substation.

Verificado pela YPS: 25 de out. de 2026, 13:18 UTC

Johannesburg skyline with illuminated buildings in the evening
Johannesburg · File photo

África do Sul / Aeroton and Ormonde

Evidência antiga

Aeroton and Ormonde power outage: City Power reports full restoration

City Power reports that power supply has been fully restored in Aeroton and Ormonde following the Showground Switching Station outage. Its 14:21 SAST statement on 9 October attributes the interruption to a faulty cable and says it was reported on Thursday, 8 October. The operator’s restoration announcement supersedes the morning notice that eight load centres remained off.

9 October, 14:21 SAST: City Power reports full supply restored in Aeroton and Ormonde after a faulty cable.

Verificado pela YPS: 9 de out. de 2026, 12:52 UTC

Johannesburg buildings with Hillbrow Tower rising above the skyline
Johannesburg · File photo

África do Sul / Doornfontein, Johannesburg

Evidência antiga

Doornfontein power restored after Siemert cable fault, City Power says

City Power says electricity supply has been fully restored to customers in Doornfontein and New Doornfontein following the outage reported from Siemert Substation on the morning of 16 October. Its later update attributes the interruption to a faulty cable. The restoration statement was published at 16:47 SAST; that is the reporting time, not a confirmed switching time.

16 October, 16:47 SAST: City Power reports full restoration in Doornfontein and New Doornfontein for this Siemert incident.

Verificado pela YPS: 16 de out. de 2026, 15:52 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Doornfontein power outage: City Power reports full restoration

City Power reported on Monday evening, 9 November, that it had restored power to the affected customers in Doornfontein and New Doornfontein in Johannesburg. The utility said it had acknowledged the Siemert Road Substation outage on Sunday, 8 November, after a faulty cable caused a trip.

City Power reported full restoration to affected Doornfontein and New Doornfontein customers.

Verificado pela YPS: 9 de nov. de 2026, 18:34 UTC

Hillbrow Tower above buildings in Johannesburg.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power reports power restored in Slovo Park

City Power said power was back for the customers affected by Monday’s outage in Slovo Park, Johannesburg. The utility posted its restoration update at 11:49 South African Standard Time (SAST) on 9 November. The exact time customers got their power back remains unknown.

City Power reported restoration for affected Slovo Park customers at 11:49 SAST.

Verificado pela YPS: 9 de nov. de 2026, 10:19 UTC

Johannesburg skyline viewed from highways
Johannesburg · File photo

África do Sul / South Hills, Johannesburg

Evidência antiga

South Hills power outage: City Power reports full restoration

City Power says electricity has been fully restored to customers in South Hills supplied by Moffat Substation in Johannesburg. The operator attributes the outage reported on 27 October 2026 to a cable fault. The exact start of the interruption, restoration completion time and number of affected customers remain unknown.

City Power reports full restoration in South Hills; the statement does not establish restoration across every Moffat circuit.

Verificado pela YPS: 27 de out. de 2026, 22:11 UTC

Hillbrow Tower rising above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Sundowner and Northriding AH

Evidência antiga

Sundowner and Northriding AH: City Power reports cable-fault restoration, other outages unresolved

City Power reports that repairs are complete and supply has been restored after the cable fault reported on 25 October affecting Northriding AH and Sundowner. Its 26 October evening notice is followed by local complaints and an operator reply acknowledging multiple outages in the area and surroundings. The scoped restoration statement does not establish that every address has electricity.

City Power reports the cable fault restored. Later complaints and its reply about multiple outages leave area-wide recovery unconfirmed.

Verificado pela YPS: 27 de out. de 2026, 00:48 UTC

Johannesburg skyline viewed from a highway
Johannesburg · File photo

África do Sul / Sunninghill

Evidência antiga

Sunninghill power outage: Eskom test van investigates cable fault

Eskom reported a cable-fault power outage affecting customers in parts of Sunninghill in a notice published on 25 October 2026. The operator said a test van was on site identifying the fault location, with further updates to follow once it had been located. The statement did not provide a restoration estimate or an affected-customer total.

Eskom reports a cable-fault outage in parts of Sunninghill; a test van is identifying the fault location. No restoration estimate or verified restoration is available.

Verificado pela YPS: 25 de out. de 2026, 11:09 UTC

Johannesburg buildings and Hillbrow Tower beneath a bright, partly cloudy sky
Johannesburg · File photo

África do Sul / Sydenham and Linksfield, Johannesburg

Evidência antiga

Sydenham and Linksfield power outage: City Power reports 80% supply restored

City Power says restoration remains 80% complete for Linksfield and Sydenham at Orchards Substation in Johannesburg. Its bulletin dated 2 November 2026 at 16:40 says a test branch has been requested to locate a cable fault before repairs can begin. No affected-customer total or full-restoration deadline is available.

Partial restoration: City Power reports 80% restored for Linksfield and Sydenham; fault-location support is requested and no full-restoration deadline is available.

Verificado pela YPS: 2 de nov. de 2026, 17:12 UTC

Illustrated wooden drawer with a headlamp, lantern, power bank and radio
Ilustração de IA

África do Sul / Tsakane

Evidência antiga

Tsakane power outage: Eskom’s 19 October notice gives no restoration time

Eskom reported a power outage affecting customers in Tsakane Extensions 8, 13 and 22 and Thubelisha in a notice published on 19 October 2026. The utility said technicians were attending, with no estimated restoration time available. That evening statement confirms the reported interruption; present supply at individual addresses remains unverified.

Eskom’s 19 October notice reports the outage and technicians attending, without a restoration estimate. Current address-level supply remains unverified.

Verificado pela YPS: 20 de out. de 2026, 04:01 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Tshepisong

Evidência antiga

Tshepisong Line A outage: City Power reports restoration

City Power reports full restoration to customers supplied by Line A at Tshepisong Switching Station after a power interruption reported on the morning of 15 October 2026. The operator’s statement does not give the exact restoration completion time, the cause or an affected customer count.

15 October, 21:55 SAST: City Power reports full restoration for the Tshepisong Line A interruption reported that morning; exact restoration time unknown.

Verificado pela YPS: 15 de out. de 2026, 20:32 UTC

Prepared backup equipment arranged in a drawer
Ilustração de IA

África do Sul / Tshepisong Switching Station

Evidência antiga

Tshepisong Line A power restored, City Power reports

City Power says power has been restored to customers on Tshepisong Line A. The operator published the restoration notice at 20:17 SAST on 7 October 2026, after an earlier report of an unplanned supply loss linked to Tshepisong Switching Station. The update confirms recovery for the named line, while the cause and affected customer count remain unknown.

City Power reports Tshepisong Line A restored in its 20:17 SAST notice on 7 October; individual isolated outages may remain.

Verificado pela YPS: 8 de out. de 2026, 05:30 UTC

Emergency preparation items arranged in a drawer
Ilustração de IA

África do Sul / Tshepisong Switching Station

Evidência antiga

Tshepisong Line B power outage: City Power reports full restoration

City Power reports that electricity supply has been fully restored to customers fed from Line B at Tshepisong Switching Station. The operator’s 21:54 SAST announcement on 8 October says the outage was reported earlier that day. The all-clear concerns Line B; it does not establish the status of Line A or every supply connection in Tshepisong.

8 October, 21:54 SAST: City Power reports full supply restoration to Line B customers.

Verificado pela YPS: 8 de out. de 2026, 20:37 UTC

Johannesburg skyline seen beyond roads
Johannesburg · File photo

África do Sul / Tshepisong

Evidência antiga

Tshepisong Line C power outage: City Power reports supply restored

City Power reports electricity restored on Tshepisong Switching Station Line C in its 14:35 SAST statement on 16 October. The same notice reports Line B restored, while Lines A and D remain affected with repairs pending. The announcement supports a Line C restoration update, with no independently verified supply check at individual addresses.

16 October, 14:35 SAST: City Power reports Tshepisong Line C restored; the same notice says Lines A and D remain affected.

Verificado pela YPS: 16 de out. de 2026, 12:44 UTC

Johannesburg skyline with buildings lit at dusk.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Tshepisong Line C outage: City Power reports full restoration

City Power said supply was fully restored to customers on Tshepisong Line C after an outage reported on Friday, 13 November. The Johannesburg utility posted the restoration notice early on Saturday, 14 November.

City Power reported full restoration to customers on Tshepisong Line C.

Verificado pela YPS: 14 de nov. de 2026, 00:23 UTC

Johannesburg high-rise buildings and Hillbrow Tower beneath a partly cloudy sky
Johannesburg · File photo

África do Sul / Tshepisong, Johannesburg

Evidência antiga

Tshepisong Line D power outage: City Power to investigate

City Power reports an electricity outage affecting customers in Tshepisong Line D in Johannesburg and says operators will be dispatched to investigate. The statement was checked on 19 October 2026. The exact outage start, number of affected customers, cause and restoration time remain unknown.

Checked 19 October: City Power reports a Tshepisong Line D outage and planned investigation; cause and restoration time unknown.

Verificado pela YPS: 19 de out. de 2026, 10:46 UTC

Johannesburg buildings and Hillbrow Tower under a bright, partly cloudy sky
Johannesburg · File photo

África do Sul / Tshepisong, Johannesburg

Evidência antiga

Tshepisong power outage: Line B fully restored after Line A

City Power reports that electricity has been fully restored to all affected customers on Tshepisong Switching Station Line B. The 21 October 2026 statement follows its earlier report that Line A had been restored. The operator attributes the interruption to burnt jumpers; the exact physical restoration time is not specified.

City Power reports all affected Line B customers fully restored, following earlier Line A recovery; exact restoration time unspecified.

Verificado pela YPS: 21 de out. de 2026, 14:27 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Tshepisong

Evidência antiga

Tshepisong lines A and B power restored, City Power reports

City Power reports full power restoration to customers supplied by Tshepisong Switching Station lines A and B after an outage reported on the evening of 1 November 2026. The operator’s statement covers customers on those two lines in Johannesburg. It does not give the cause, affected-customer total or exact switching time. The restoration report comes from City Power; supply at individual addresses has not been independently checked.

City Power reports full restoration to customers supplied by Tshepisong Switching Station lines A and B after the 1 November evening outage.

Verificado pela YPS: 2 de nov. de 2026, 02:59 UTC

A laptop, a power bank and a portable power station on a table beside a lamp
Ilustração de IA

África do Sul / Bronkhorstspruit

Evidência antiga

Bronkhorstspruit power outage: Tshwane reports transformer trip

The City of Tshwane reported a power outage in Bronkhorstspruit on 11 November 2026 after a 132 kV transformer tripped. In its 06:05 SAST notice, the municipality named seven affected areas. It said initial inspections were complete and a team had been dispatched. The notice gave no restoration estimate.

Tshwane reported a transformer trip in Bronkhorstspruit on 11 November. Its notice gave no restoration estimate.

Verificado pela YPS: 11 de nov. de 2026, 05:17 UTC

Buildings in the Hillbrow area of Johannesburg
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Vezinyawo power outage continues after truck damages switchgear

City Power says the affected electricity supply in Vezinyawo has been off since 5 November after a truck damaged a ring main unit. In its 14 November update for Vezinyawo in the Alexandra service area of Johannesburg, the utility said it was dealing with the insurance process and had no estimated restoration time.

Último status conhecido: confirmado pela fonte

Verificado pela YPS: 15 de nov. de 2026, 05:48 UTC

Hillbrow Tower above the Johannesburg skyline
Johannesburg · File photo

África do Sul / Victory Park

Evidência antiga

Victory Park power outage: City Power reports supply restored

City Power says electricity supply has been restored in Victory Park, Johannesburg. The utility identified a faulty cable in its update on the Parkhurst Substation incident. It announced the restoration at 12:44 SAST on Sunday, 15 November, without giving the time power actually came back.

City Power reports Victory Park supply restored after a cable fault.

Verificado pela YPS: 15 de nov. de 2026, 11:48 UTC

Johannesburg skyline beyond a highway interchange
Johannesburg · File photo

África do Sul / Parkhurst

Evidência antiga

Victory Park and Parkhurst power restored after cable fault

City Power says electricity has been fully restored to customers in Pinepark, Blairgowrie, Victory Park and Parkhurst, Johannesburg, after an interruption on the morning of 30 October 2026. The operator attributes the interruption to a cable fault. Its restoration notice was published at 10:53:19 SAST; the exact switching time is unknown.

City Power reports full restoration in Pinepark, Blairgowrie, Victory Park and Parkhurst after a cable fault; exact restoration minute unknown.

Verificado pela YPS: 30 de out. de 2026, 09:39 UTC

Hillbrow Tower above the Johannesburg skyline
Johannesburg · File photo

África do Sul / Village Deep

Evidência antiga

Village Deep power outage: City Power reports cable fault

City Power reports a cable fault on the Village Deep South Distributor at Selby Substation following an outage affecting parts of Village Deep in Johannesburg. Its latest update on 2 November 2026 says one load centre is off, affecting supply to Spur. The fault still needs to be located and repairs completed. No restoration estimate or affected-customer count has been established.

City Power reports a cable fault on the Village Deep South Distributor, with one load centre off; fault location and repairs remain outstanding and no restoration estimate is available.

Verificado pela YPS: 2 de nov. de 2026, 14:08 UTC

Johannesburg skyline viewed from nearby highways
Johannesburg · File photo

África do Sul / Vorna Valley

Evidência antiga

Vorna Valley power restored after cable fault, City Power says

City Power reports that power supply has been fully restored to customers in Vorna Valley. Its Harry Galaun Switching Station notice, published at 16:47 SAST on 10 October, attributes the outage to a cable fault. The update follows earlier partial restoration and repair reports. The notice concerns Vorna Valley; it does not establish restoration across all of Midrand or Johannesburg.

10 October, 16:47 SAST: City Power reports power fully restored to customers in Vorna Valley after a cable fault.

Verificado pela YPS: 10 de out. de 2026, 15:22 UTC

Johannesburg skyline seen beyond roads
Johannesburg · File photo

África do Sul / Weltevreden Park and Allen’s Nek

Evidência antiga

Weltevreden Park and Allen’s Nek power restored, City Power says

City Power reports full restoration to customers in Weltevreden Park and Allen’s Nek under JG Strydom Switching Station. Its update was published at 04:37 SAST on 16 October 2026. The operator links the interruption to a cable fault recorded around midnight; the exact physical restoration time is not specified.

City Power’s 16 October, 04:37 SAST statement reports full restoration in Weltevreden Park and Allen’s Nek under JG Strydom Switching Station.

Verificado pela YPS: 16 de out. de 2026, 04:42 UTC

Johannesburg skyline with highways, cars and trees beneath a blue sky
Johannesburg · File photo

África do Sul / Weltevredenpark, Constantia Kloof and Floracliffe, Johannesburg

Evidência antiga

Weltevredenpark power outage: City Power reports supply restored

City Power reports supply restored at Rhinoceros Switching Station, affecting Weltevredenpark, Floracliffe and Constantia Kloof in Johannesburg. Its latest notice on 29 October 2026 links the restoration to the cable fault reported on 28 October. The operator announcement follows completed repairs and an earlier partial restoration; the exact switching time and independent status at each address remain unknown.

City Power reports supply restored at Rhinoceros Switching Station for the named areas; exact switching time and individual-address status remain unverified.

Verificado pela YPS: 29 de out. de 2026, 21:21 UTC

A laptop, power bank, portable power station and table lamp on a wooden table
Ilustração de IA

África do Sul / Panorama Switching Station service area

Evidência antiga

Weltevredenpark, Allen’s Nek and Constantia Kloof: City Power reports full restoration

City Power says electricity supply has been fully restored in Weltevredenpark, Allen’s Nek and Constantia Kloof in the Panorama Switching Station service area. Its latest update was published at 00:02 SAST on Wednesday 21 October 2026, following a partial-restoration report late on Tuesday. Supply at individual properties has not been independently checked.

21 October, 00:02 SAST update: City Power reports full restoration in the three named areas; address-level supply is not independently verified.

Verificado pela YPS: 20 de out. de 2026, 22:11 UTC

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Glenesk and Stafford, Johannesburg

Evidência antiga

Glenesk and Stafford: City Power reports power restored after cable damage

City Power reports that electricity has been fully restored to customers in Glenesk and Stafford, Johannesburg. Its statement identifies Wemmer Substation and attributes the interruption to a damaged cable. The operator issued the update on 25 October 2026; the exact time supply returned, the outage start and the affected-customer total remain unknown.

City Power reports full restoration in Glenesk and Stafford following a damaged cable, identifying Wemmer Substation.

Verificado pela YPS: 25 de out. de 2026, 15:17 UTC

Emergency preparation items arranged in a drawer
Ilustração de IA

África do Sul / Wemmer Substation

Evidência antiga

Wemmer power restored, City Power says after five-area outage

City Power reports that power supply at Wemmer Substation has been fully restored. Its update at 16:24 SAST on 7 October 2026 names Kenilworth, Turffontein, Forest Hill, Townsview and Rosettenville as the areas affected by the outage.

City Power, 16:24 SAST on 7 October: full power restoration reported at Wemmer Substation; exact restoration time unknown.

Verificado pela YPS: 7 de out. de 2026, 15:16 UTC

Johannesburg skyline viewed from the highways.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Multi Flora Flower Market power outage: City Power reports full restoration

City Power says it has fully restored power to affected customers at Multi Flora Flower Market in Johannesburg. The Sunday, 15 November update followed a cable fault at Wemmer Substation that was reported on Saturday, 14 November.

City Power reports full restoration at Multi Flora Flower Market after the Wemmer cable fault.

Verificado pela YPS: 15 de nov. de 2026, 14:51 UTC

Hillbrow Tower above the Johannesburg skyline.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power reports power restored in Roseacre, Regents Park and Rewlatch

City Power says it has restored electricity to affected customers in parts of Roseacre, Regents Park and Rewlatch, Johannesburg. The utility published its restoration notice at 20:41 SAST on 9 November. It linked the interruption to a cable fault at Wemmer Substation and dated the original report to 8 November.

City Power reported restoration in Roseacre, Regents Park and Rewlatch at 20:41 SAST on 9 November.

Verificado pela YPS: 10 de nov. de 2026, 05:36 UTC

Johannesburg city buildings in an archive view
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Stafford and Trojan power restored, City Power reports

City Power reports that full electricity supply has been restored at Wemmer Substation for the outage affecting Stafford and Trojan in Johannesburg. Its 11 October announcement says the interruption was reported the previous night, 10 October, and attributes it to a consumer fault. The exact restoration time and number of affected connections are not stated.

City Power reports full restoration for the Stafford and Trojan outage; exact switching time unknown.

Verificado pela YPS: 11 de out. de 2026, 08:48 UTC

Hillbrow Tower rising above buildings in Johannesburg
Johannesburg · File photo

África do Sul / Far East Bank; Westfield Substation; Johannesburg

Evidência antiga

Far East Bank power restored, City Power reports

City Power reports that electricity supply has been fully restored to customers in Far East Bank supplied from Westfield Substation. Its 1 November 2026 notice attributes the interruption reported on 31 October to a cable fault. This is the operator’s restoration report; individual addresses have not been independently checked. The exact outage onset, restoration switching time and affected-customer total remain unknown.

City Power reports full electricity supply restored to Far East Bank customers from Westfield Substation after the cable-fault outage reported on 31 October.

Verificado pela YPS: 1 de nov. de 2026, 09:36 UTC

Johannesburg skyline with buildings lit at dusk.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

City Power confirms power restored in Founders View South and Sebenza

City Power confirmed on 14 November that power had been fully restored to affected customers in Founders View South and Sebenza after the Westfield Substation outage reported the previous day. The utility attributed the interruption to a faulty cable.

City Power reported full restoration in Founders View South and Sebenza on 14 November.

Verificado pela YPS: 14 de nov. de 2026, 14:35 UTC

Illustrated drawer containing household emergency supplies
Ilustração de IA

África do Sul / Greenstone

Evidência antiga

Greenstone power outage: City Power reports full restoration

City Power reports full restoration to Greenstone Gate Complex and Greenstone Shopping Centre after the evening electricity interruption on 29 October 2026. The latest notice follows a trip after supply had initially been restored following planned maintenance at Westfield Substation. The exact switching time, affected-customer count and technical cause remain unknown.

City Power reports full restoration to Greenstone Gate Complex and Greenstone Shopping Centre; the exact switching time remains unknown.

Verificado pela YPS: 29 de out. de 2026, 21:21 UTC

Emergency supplies arranged in a drawer
Ilustração de IA

África do Sul / Wilgeheuwel and Little Falls, Roodepoort

Evidência antiga

Wilgeheuwel and Little Falls power outage: City Power reports backfeeding restoration

City Power reports electricity restored via backfeeding to customers in parts of Wilgeheuwel and Little Falls supplied by Peter Road Substation. The 31 October 2026 notice follows an earlier statement that operators were investigating an outage in the area. The restoration report does not establish a permanent cable repair, and the exact switching time and affected-customer total remain unknown.

City Power reports backfeeding restoration in parts of Wilgeheuwel and Little Falls; permanent cable repair and exact switching time are unconfirmed.

Verificado pela YPS: 31 de out. de 2026, 11:57 UTC

Johannesburg skyline viewed from a distance.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Willowbrook power outage: City Power reports up to 75% restored

City Power reported that it had restored up to 75% of power after an outage affecting customers in Willowbrook, Johannesburg, on Thursday, 12 November. In its update for Peter Rd Substation (Monach), the utility said three load centres would remain off because of an existing fault.

City Power reported up to 75% of power restored in Willowbrook and said three load centres remain off because of an existing fault.

Verificado pela YPS: 12 de nov. de 2026, 21:56 UTC

Johannesburg skyline viewed from surrounding roads
Johannesburg · File photo

África do Sul / Willowbrook, Johannesburg

Evidência antiga

Willowbrook power outage: City Power reports full restoration at Peter Road

City Power says electricity has been fully restored in Willowbrook, Van Blerk and Peter Road Shopping Centre following the Peter Road Substation outage reported on 15 October 2026. Its restoration statement was published on 16 October at 21:50 SAST. The operator attributes the interruption to a cable fault; the affected-customer total remains unknown.

16 October, 21:50 SAST: City Power reports full restoration for the Peter Road incident affecting Willowbrook, Van Blerk and Peter Road Shopping Centre.

Verificado pela YPS: 16 de out. de 2026, 19:55 UTC

Johannesburg city skyline with illuminated buildings at night
Johannesburg · File photo

África do Sul / Willowbrook

Evidência antiga

Willowbrook power restored, City Power says

City Power says power supply has been restored at Peter Road Substation following a cable fault affecting Willowbrook Estate and Fever Tree Estate. Its notice, published at 14:00 SAST on 11 October, dates the outage report to Friday 9 October. This is an operator restoration announcement for the named estates; it does not establish supply conditions across the wider Roodepoort area.

11 October, 14:00 SAST: City Power announces supply restored at Peter Road Substation after the cable fault affecting Willowbrook Estate and Fever Tree Estate.

Verificado pela YPS: 11 de out. de 2026, 12:55 UTC

Johannesburg’s skyline seen from a highway.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Winchester Hills and West Turffontein power outage: City Power confirms restoration

City Power said power had been fully restored for customers affected by a cable fault at Robertsham Substation in Johannesburg. Its 11:49 SAST bulletin on 11 November named Winchester Hills and West Turffontein. The utility did not give the exact time supply returned.

City Power confirmed full restoration for customers affected by the Robertsham Substation cable fault in Winchester Hills and West Turffontein.

Verificado pela YPS: 11 de nov. de 2026, 10:20 UTC

Johannesburg skyline at dusk.
Johannesburg · File photo

África do Sul / Johannesburg

Evidência antiga

Windsor West power restored after cable fault, City Power says

City Power says it has restored power to the customers affected by the Windsor West outage in Johannesburg on 12 November. The utility attributed the interruption to a cable fault at Beyers Naude Substation. It did not give an exact switch-on time or an affected customer count.

City Power reported full restoration to customers affected by the Windsor West outage and attributed the interruption to a cable fault.

Verificado pela YPS: 12 de nov. de 2026, 20:46 UTC

Johannesburg skyline viewed from nearby highways
Johannesburg · File photo

África do Sul / Witpoortjie

Evidência antiga

Witpoortjie power outage: repairs complete, restoration process to begin

City Power says repairs have been completed for the Witpoortjie power interruption and the restoration process will now begin. Its Penny Street Substation notice, published at 20:12 SAST on 11 October, names Haynes Street, Gregor Ross Street and Cilliers Street. Repair completion marks a new stage, but does not confirm that every affected customer has regained electricity.

11 October, 20:12 SAST: City Power says repairs are complete and restoration will begin; full recovery remains unconfirmed.

Verificado pela YPS: 11 de out. de 2026, 18:58 UTC

Johannesburg skyline viewed from highways
Johannesburg · File photo

África do Sul / Wynberg and Bramley Park

Evidência antiga

Wynberg and Bramley Park power outage: City Power reports 36% restoration

City Power says access challenges have limited power supply restoration to 36% in its Gresswold Substation update for Wynberg and Bramley Park, Johannesburg. Its 08:33 SAST bulletin on 12 October confirms that operators are on site investigating further. The update explicitly names both areas and links the loss of supply to the outage acknowledged earlier that day.

12 October, 08:33 SAST: City Power reports 36% supply restoration in its Gresswold update for Wynberg and Bramley Park, with operators on site investigating further; no restoration deadline confirmed.

Verificado pela YPS: 15 de out. de 2026, 09:24 UTC

Hillbrow Tower among Johannesburg buildings
Johannesburg · File photo

África do Sul / Wynberg and Kew

Evidência antiga

Wynberg and Kew power outage: fault-location team requested

City Power reports partial restoration to customers in Wynberg and Kew and says its Test Branch team has been requested to locate an existing fault. The 10:30 SAST notice on 16 October links the work to the interruption acknowledged on 15 October. It gives no new restored percentage or completion time.

16 October, 10:30 SAST: City Power reports partial restoration in Wynberg and Kew and requests fault-location work; no completion time.

Verificado pela YPS: 16 de out. de 2026, 08:45 UTC

Johannesburg skyline with illuminated buildings in the evening
Johannesburg · File photo

África do Sul / Palmiet Booster Pumping Station

Evidência antiga

Palmiet power outage: pumping restored, Johannesburg water recovery continues

Johannesburg Water says a power outage affecting an Eskom transformer reduced pumping capacity at Rand Water’s Palmiet Booster Pumping Station on 9 October. Pumping returned to 100% of normal capacity at approximately midnight, according to its 10 October notice. The operator warns that effects on its water systems may persist as recovery continues.

10 October notice: Palmiet pumping restored to normal capacity around midnight; downstream water effects may persist. Electricity network status remains unknown.

Verificado pela YPS: 10 de out. de 2026, 08:11 UTC

POR TRÁS DO AVISO

Um sinal dá início à matéria. As fontes trazem o contexto.

  1. Comece pelo aviso original

    Uma operadora, uma autoridade ou uma observação local datada. As redes sociais podem trazer uma primeira pista.

  2. Verifique impacto e restabelecimento separadamente

    Uma queda de energia em um bairro não é automaticamente uma queda em toda a cidade. O restabelecimento pode variar conforme a área.

  3. Atualize quando os fatos mudarem

    As matérias e os rótulos de status mantêm a data da evidência. Um aviso antigo não passa automaticamente a “restabelecido”.

Uma gaveta aberta com uma lanterna de cabeça, um pequeno lampião, um carregador portátil com o cabo, um rádio e um bilhete de papel

PLANEJE COM ANTECEDÊNCIA

O que você manteria funcionando durante uma queda de energia?

Comece pelo celular, pela iluminação e pelos equipamentos de internet. Depois, calcule a energia de que você precisa.

Calcular a autonomia →Ilustração gerada por IA sobre preparação
Privacidade
YOUR POWER SETUP

Cookies

Podemos usar cookies do Google Analytics para entender quais páginas são úteis? Só com sua permissão. Não enviamos dados das calculadoras. Você pode mudar sua escolha no rodapé de qualquer página. Privacidade