Language and regionEnglish · InternationalEN
IDBahasa IndonesiaIndonesiaThis page is not availableDKDanskDanmarkThis page is not availableDEDeutschDeutschlandThis page is not availableATDeutschÖsterreichThis page is not availableCHDeutschSchweizThis page is not availableAUEnglishAustraliaThis page is not availableCAEnglishCanadaThis page is not availableINEnglishIndiaThis page is not availableENEnglishInternationalIEEnglishIrelandThis page is not availableNGEnglishNigeriaThis page is not availablePHEnglishPhilippinesThis page is not availableZAEnglishSouth AfricaGBEnglishUnited KingdomThis page is not availableUSEnglishUnited StatesThis page is not availableAREspañolArgentinaThis page is not availableESEspañolEspañaThis page is not availableMXEspañolMéxicoThis page is not availableCAFrançaisCanadaThis page is not availableFRFrançaisFranceThis page is not availableCHFrançaisSuisseThis page is not availableITItalianoItaliaThis page is not availableCHItalianoSvizzeraThis page is not availableNLNederlandsNederlandThis page is not availableNONorsk bokmålNorgeThis page is not availablePLPolskiPolskaThis page is not availableBRPortuguêsBrasilThis page is not availablePTPortuguêsPortugalThis page is not availableFISuomiSuomiThis page is not availableSESvenskaSverigeThis page is not availableTRTürkçeTürkiyeThis page is not availableGRΕλληνικάΕλλάδαThis page is not availableJP日本語日本This page is not available
← Outage news

South Africa / ELECTRICITY SUPPLY

Tshepisong Line B power outage: City Power reports full restoration

City Power reports that electricity supply has been fully restored to customers fed from Line B at Tshepisong Switching Station. The operator’s 21:54 SAST announcement on 8 October says the outage was reported earlier that day. The all-clear concerns Line B; it does not establish the status of Line A or every supply connection in Tshepisong.

Emergency preparation items arranged in a drawer
AI illustration

Status of this incident

Current status unconfirmed

Last known status: restored, according to the source · 8 October, 21:54 SAST: City Power reports full supply restoration to Line B customers.

Source moment: Oct 8, 2026, 07:54 PM UTC (09:54 PM local time)

In 20 seconds

  1. City Power reports full restoration to customers fed from Line B.

  2. The earlier Eskom-side finding is the operator’s account; an exact technical cause is unverified.

  3. Customer count, exact onset and switching minute are unknown; no wider Tshepisong all-clear is established.

Restoration announced for Line B customers

The latest notice gives a completed restoration outcome for customers receiving supply from Line B. It does not state how many customers were affected, the exact moment supply was lost or the precise switching time when electricity returned. The publication time of the notice is the time of the announcement, rather than a verified restoration minute for each address. No household list or independent address-level measurement is available in the checked evidence.

Earlier on 8 October, City Power identified the affected supply as Incomer No 3, Line B, and said the loss had been traced to Eskom’s side. The operator said control had notified Eskom and the protection team to attend. Restoration was then conditional on investigation and finding no major faults. That earlier conditional account was not a promise of immediate reconnection; the later notice is the statement confirming restoration for Line B.

What the sources tell us, and what they do not

Named supply
Tshepisong Switching Station; Incomer No 3, Line B
Latest operator position
Full restoration to Line B customers, according to City Power
Affected customers
Count unknown
Restoration announcement
8 October, 21:54 SAST; exact switching minute unknown
Earlier operator finding
Loss traced to Eskom’s side, according to City Power; exact technical cause unverified

How the operator’s updates developed

At 13:27 SAST, City Power said operators would investigate the supply loss reported that morning. At 16:24 SAST, it reported the Eskom-side finding and notifications to the teams, with restoration dependent on the investigation. At 21:54 SAST, it announced full restoration to Line B customers. These updates describe the same day’s progression without establishing a precise outage duration. The technical cause beyond the earlier operator attribution remains unverified.

The scope of the restoration statement matters: it names customers fed from Line B. It should not be used to declare Line A restored or to describe a wider all-clear across Tshepisong. A particular address’s electricity supply has not been independently checked here. Customer totals and the actual restoration minute remain unknown, even though the operator reports the Line B supply restored.

Household backup planning

The runtime calculator compares essential device demand with battery capacity. The internet backup planner covers power for a router and modem. For a preparation checklist, see the backup essentials guide. These tools support planning for future interruptions and do not verify local supply.

Privacy