Ikeja Electric reports Band A supply shortfalls on listed Lagos feeders
Ikeja Electric says listed Band A feeders in its Lagos distribution territory fell short of the expected 20 hours of daily electricity supply. The operator issued three notices covering 2 and 3 November, 3 and 4 November, and 4 and 5 November. The notices describe daily supply shortfalls, with feeder overlap and the return to expected supply still unverified.
Last known status: confirmed by the source

Status of this incident
Current status unconfirmed
Last known status: confirmed by the source
Source moment: Nov 6, 2026, 12:02 PM UTC (01:02 PM local time)
In 20 seconds
The notices concern listed Band A feeders in Ikeja Electric’s Lagos distribution territory.
The notices cover three overlapping two-day service windows, from 2 to 5 November.
The number of customers affected and the return to expected daily supply are unverified.
Which dates the notices cover
Ikeja Electric’s first notice covers 2 and 3 November. Its second covers 3 and 4 November, and the third covers 4 and 5 November. For each window the operator reported that listed Band A feeders fell short of the expected 20 hours of daily supply.
Because the windows overlap, 3 and 4 November each appear in two notices. The dates describe the days covered by the operator’s supply reports. They do not establish the start or duration of a continuous interruption, or show that the same feeders fell short in every window.
What the sources tell us, and what they do not
- Area
- Listed Band A feeders in Ikeja Electric’s Lagos distribution territory
- Reported impact
- Shortfall against the expected 20 hours of daily supply in the listed service windows
- Current supply
- Return to expected daily supply unverified
What the notices establish for Lagos customers
The confirmed scope is the feeders listed by Ikeja Electric for the respective windows. The reports do not establish how many customers were affected or give a verified supply reading for an individual address. The cause of the shortfalls remains unverified.
The latest of these notices covers 4 and 5 November. It records a past supply shortfall, and the available evidence does not establish when the affected feeders returned to the expected daily supply.
Planning backup for essential devices
During an interruption, consider what you need for lighting, communication and other essential tasks. Check which devices can run directly from a battery and which need an AC outlet. The backup essentials guide and runtime calculator explain how to prioritise essential equipment and estimate battery runtime. Start with the devices you need to keep available, check their power draw, and compare their combined needs with your available battery capacity.