Fiji power outage: EFL lists Naqali feeder trip
Energy Fiji Limited lists an unplanned electricity interruption on the Naqali Feeder beginning at 09:56 Fiji time on 2 November 2026. EFL attributes the feeder trip to an undetermined fault and provides no definite restoration timeframe. Its affected-area list names Naqali Village, Nabukaluka Road, Vanuakula and other locations along the feeder. No customer total is supplied, and the listing may lag conditions on the ground.

Status of this incident
Current status unconfirmed
Last known status: confirmed by the source · EFL lists the Naqali Feeder interruption with an undetermined fault and no definite restoration timeframe; restoration is unconfirmed.
Source moment: Nov 2, 2026, 02:58 AM UTC (02:58 PM local time)
In 20 seconds
EFL lists a Naqali Feeder interruption beginning 2 November at 09:56 Fiji time.
The affected-area list includes Naqali Village, Nabukaluka Road, Vanuakula, Waidina Secondary School and Waidina Nursing Station.
The fault is undetermined; no definite restoration timeframe or customer total is provided.
What the EFL listing establishes
The utility’s unplanned-outage table gives a start time of 09:56 on Monday, 2 November, in Fiji, equivalent to 21:56 UTC on 1 November. It describes a feeder trip with an undetermined fault. This is the start recorded for the Naqali entry, rather than the publication time of a separate repair or restoration announcement.
EFL’s affected-area list includes numerous named settlements, as well as Waidina Secondary School and Waidina Nursing Station. Those names identify locations on the listed network. They do not establish that the school or nursing station stopped operating, lost backup power or suffered a separate service closure. No such operational impact is verified here.
What the sources tell us, and what they do not
- Listed network
- Naqali Feeder; named locations include Naqali Village, Nabukaluka Road, Vanuakula and Waidina facilities
- Fault and recovery
- Feeder trip with an undetermined fault; no definite restoration timeframe
- Listed start
- 2 November 2026, 09:56 Fiji time / 1 November, 21:56 UTC
Restoration timing remains unknown
The entry provides no definite timeframe for restoration. It also gives no affected-customer total or complete address-level account of supply. The named locations do not establish an outage across all of Fiji, and population figures must not be substituted for customer connections. Conditions at individual properties remain unverified.
The page does not show a publication or latest-update time for this row and retains older outage entries. Its listing may therefore lag field conditions. The checked record establishes the utility’s Naqali listing, while leaving completed repairs and restoration unconfirmed. This is a distinct entry from the older Lavusa and Sigatoka faults; no shared cause is established.
Preparing while the timeframe is uncertain
For household planning, the grid-down essentials guide covers essential backup needs, the internet backup guide covers connectivity, and the runtime calculator helps compare battery capacity with device demand. These resources help assess equipment needs; they cannot predict when network electricity will return.