Language and regionEnglish · InternationalEN
IDBahasa IndonesiaIndonesiaThis page is not availableDKDanskDanmarkThis page is not availableDEDeutschDeutschlandThis page is not availableATDeutschÖsterreichThis page is not availableCHDeutschSchweizThis page is not availableAUEnglishAustraliaThis page is not availableCAEnglishCanadaThis page is not availableINEnglishIndiaThis page is not availableENEnglishInternationalIEEnglishIrelandThis page is not availableNGEnglishNigeriaThis page is not availablePHEnglishPhilippinesThis page is not availableZAEnglishSouth AfricaGBEnglishUnited KingdomThis page is not availableUSEnglishUnited StatesThis page is not availableAREspañolArgentinaThis page is not availableESEspañolEspañaThis page is not availableMXEspañolMéxicoThis page is not availableCAFrançaisCanadaThis page is not availableFRFrançaisFranceThis page is not availableCHFrançaisSuisseThis page is not availableITItalianoItaliaThis page is not availableCHItalianoSvizzeraThis page is not availableNLNederlandsNederlandThis page is not availableNONorsk bokmålNorgeThis page is not availablePLPolskiPolskaThis page is not availableBRPortuguêsBrasilThis page is not availablePTPortuguêsPortugalThis page is not availableFISuomiSuomiThis page is not availableSESvenskaSverigeThis page is not availableTRTürkçeTürkiyeThis page is not availableGRΕλληνικάΕλλάδαThis page is not availableJP日本語日本This page is not available
← Outage news

South Africa / ELECTRICITY SUPPLY

Klipfontein View power outage: City Power reports full restoration

City Power reports that power has been fully restored to customers in Klipfontein View, in Johannesburg’s Midrand service context. Its update was published at 00:18 SAST on 10 October 2026, following an earlier interruption that City Power attributed to a trip on Eskom’s side. The precise restoration time is not supplied.

Hillbrow Tower above Johannesburg buildings
Johannesburg · File photo

Status of this incident

Current status unconfirmed

Last known status: restored, according to the source · 10 October, 00:18 SAST: City Power reports full restoration in Klipfontein View following an interruption it attributed to an Eskom-side trip.

Source moment: Oct 9, 2026, 10:18 PM UTC (12:18 AM local time)

In 20 seconds

  1. City Power reports full restoration to customers in Klipfontein View.

  2. City Power attributed the earlier interruption to a trip on Eskom’s side and said Eskom teams were onsite.

  3. The exact onset, switching time, connection total and technical root cause remain unknown.

From interruption to reported restoration

In its earlier statement, published at 21:15 SAST on 9 October, City Power said customers in Klipfontein View were experiencing a power interruption. It attributed the interruption to a trip on Eskom’s side and said Eskom teams were onsite attending to the outage. That was an account of the response at the time, rather than confirmation of restored electricity.

The later City Power statement explicitly reports full restoration to customers in Klipfontein View. This changes the reported status of this incident from an interruption to restored supply. The scope is the area named by the operator; it does not establish restoration across all of Midrand or Johannesburg, or provide an independent check of every customer address.

What the sources tell us, and what they do not

Named affected area
Klipfontein View, Johannesburg
Earlier response
City Power said Eskom teams were onsite attending to the outage
Affected connections
Total not supplied
Reported trigger
Trip on Eskom’s side, according to City Power; root cause unverified
Latest reported status
Fully restored, according to City Power; exact switching time unknown

What the operator’s statements leave unknown

The reference to an Eskom-side trip remains attributed to City Power. An original Eskom statement and a technical root-cause assessment are not available in the checked evidence. There is no verified feeder reference, affected connection total or exact outage onset, so the interruption’s duration cannot be calculated from these two announcements.

The 00:18 SAST timestamp belongs to the restoration announcement, not a confirmed switching operation. The earlier 21:15 SAST publication likewise is not a verified start time. Readers can distinguish the operator’s clear statement that supply has returned from the unresolved timing and technical details. The available statements give no basis for linking this event to another nearby interruption.

Planning backup for essential devices

The runtime calculator helps compare essential device demand with battery capacity. The internet backup planner supports planning power for routers and modems, while the backup essentials guide offers a preparation checklist. These tools help with household preparation; they do not verify supply at a particular address or establish the cause of this incident.

Privacy