Your Power Setup
Language and regionEnglish · InternationalEN
IDBahasa IndonesiaIndonesiaThis page is not availableDKDanskDanmarkThis page is not availableDEDeutschDeutschlandThis page is not availableATDeutschÖsterreichThis page is not availableCHDeutschSchweizThis page is not availableAUEnglishAustraliaThis page is not availableCAEnglishCanadaThis page is not availableINEnglishIndiaThis page is not availableENEnglishInternationalIEEnglishIrelandThis page is not availableNGEnglishNigeriaThis page is not availablePHEnglishPhilippinesThis page is not availableZAEnglishSouth AfricaGBEnglishUnited KingdomThis page is not availableUSEnglishUnited StatesThis page is not availableAREspañolArgentinaThis page is not availableESEspañolEspañaThis page is not availableMXEspañolMéxicoThis page is not availableCAFrançaisCanadaThis page is not availableFRFrançaisFranceThis page is not availableCHFrançaisSuisseThis page is not availableITItalianoItaliaThis page is not availableCHItalianoSvizzeraThis page is not availableNLNederlandsNederlandThis page is not availableNONorsk bokmålNorgeThis page is not availablePLPolskiPolskaThis page is not availableBRPortuguêsBrasilThis page is not availablePTPortuguêsPortugalThis page is not availableFISuomiSuomiThis page is not availableSESvenskaSverigeThis page is not availableTRTürkçeTürkiyeThis page is not availableGRΕλληνικάΕλλάδαThis page is not availableJP日本語日本This page is not available
← Outage news

South Africa / ELECTRICITY SUPPLY

Kew West power outage: City Power investigates Gresswold supply

City Power says operators are on site investigating an electricity outage affecting customers in Kew West, Johannesburg. Its 18 October 2026 notice identifies supply through Gresswold Substation. The cause, number of affected customers and restoration time remain unknown.

Johannesburg skyline beyond curving highways and green roadside areas beneath a blue sky
Johannesburg · File photo

Status of this incident

Power outage confirmed

Last known status: confirmed by the source · City Power’s 18 October notice confirms an investigation into the Kew West outage; cause, customer count and restoration time remain unknown.

Source moment: Oct 18, 2026, 08:01 AM UTC (10:01 AM local time)

In 20 seconds

  1. City Power acknowledges affected customers in Kew West, supplied through Gresswold Substation.

  2. Operators are on site investigating; no repair or restoration timetable has been established.

  3. The notice does not establish an outage across every Kew West address or across Johannesburg.

What City Power has confirmed

The utility acknowledges an interruption affecting customers in Kew West and says operators are on site investigating the cause. An investigation is under way, but this does not establish that the fault has been located or that repairs have begun. No completed restoration has been verified in the available incident record.

Gresswold Substation is named in the supply context. The notice does not provide an affected street list or a count of connections. It supports a local outage affecting customers in the named area, without establishing that every home or business there has lost electricity. The geographical extent remains limited to what the operator has actually stated.

What the sources tell us, and what they do not

Area
Kew West, Johannesburg; supply through Gresswold Substation
Reported impact
Customers affected; exact streets and customer count unknown
Operator response
Operators on site investigating the cause
Restoration time
Unknown; exact onset and cause also unknown

Notice time and incident identity

The operator notice is dated 18 October at 10:01 SAST, equivalent to 08:01 UTC. This is the notice time; the exact moment customers first lost electricity is unknown. Neither an affected-customer total nor a restoration estimate has been established, and the investigation statement supplies no confirmed cause.

The relationship to other Gresswold interruptions, including the 15 October Kew report, remains unresolved. Their causes, customer totals and restoration announcements cannot be transferred to this Kew West event. This report rests on one directly read operator statement, rather than independent confirmation of the condition at individual addresses.

Planning essential electricity needs

The runtime calculator helps compare device demand with battery capacity. The internet backup guide covers connectivity equipment, and grid-down essentials provides a starting point for a practical kit. These tools support preparation while timing is uncertain; they cannot check supply at an address or predict when City Power will restore its network.

Privacy
YOUR POWER SETUP

Your privacy, your choice

May we use Google Analytics cookies to understand which pages are useful? Only with your permission. We do not send calculator entries. You can change your choice below at any time. Privacy