Your Power Setup
Language and regionEnglish · InternationalEN
IDBahasa IndonesiaIndonesiaThis page is not availableDKDanskDanmarkThis page is not availableDEDeutschDeutschlandThis page is not availableATDeutschÖsterreichThis page is not availableCHDeutschSchweizThis page is not availableAUEnglishAustraliaThis page is not availableCAEnglishCanadaThis page is not availableINEnglishIndiaThis page is not availableENEnglishInternationalIEEnglishIrelandThis page is not availableNGEnglishNigeriaThis page is not availablePHEnglishPhilippinesThis page is not availableZAEnglishSouth AfricaThis page is not availableGBEnglishUnited KingdomThis page is not availableUSEnglishUnited StatesThis page is not availableAREspañolArgentinaThis page is not availableESEspañolEspañaThis page is not availableMXEspañolMéxicoThis page is not availableCAFrançaisCanadaThis page is not availableFRFrançaisFranceThis page is not availableCHFrançaisSuisseThis page is not availableITItalianoItaliaThis page is not availableCHItalianoSvizzeraThis page is not availableNLNederlandsNederlandThis page is not availableNONorsk bokmålNorgeThis page is not availablePLPolskiPolskaThis page is not availableBRPortuguêsBrasilThis page is not availablePTPortuguêsPortugalThis page is not availableFISuomiSuomiThis page is not availableSESvenskaSverigeThis page is not availableTRTürkçeTürkiyeThis page is not availableGRΕλληνικάΕλλάδαThis page is not availableJP日本語日本This page is not available
← Outage news

Fiji / ELECTRICITY SUPPLY

Toorak power outage: EFL lists CWM 3AC10 feeder fault

EFL lists an unplanned outage on the Central CWM 3AC10 feeder starting at 07:06 Fiji time on 6 November 2026. Its listed footprint includes Dinem Toorak and Extension Street alongside several named facilities. The operator describes the fault as undetermined and provides no definite restoration timeframe. No affected-customer total is available.

An open wooden drawer containing a headlamp, lantern, power bank, radio and paper
AI illustration

Status of this incident

Current status unconfirmed

Last known status: confirmed by the source · EFL lists an unplanned CWM 3AC10 outage; current address-level supply and a final restoration time remain unverified.

Source moment: Nov 5, 2026, 07:06 PM UTC (07:06 AM local time)

In 20 seconds

  1. The listed start is 07:06 on 6 November in Pacific/Fiji, equivalent to 19:06 UTC on 5 November.

  2. EFL names Dinem Toorak, Extension Street and several facilities; this is not an address-by-address impact audit.

  3. The fault is undetermined and there is no definite restoration timeframe in the source.

The footprint named by EFL

The unplanned-outage table identifies the Central CWM 3AC10 feeder and lists Dinem Toorak, Extension Street, FSM Library and complex, Bayview Hospital and Lotus Switching Station. These are the locations in the operator’s entry. The available evidence does not provide a customer count or establish the full extent of electricity interruption at individual addresses.

A facility appearing in that footprint does not establish that its services stopped or that backup equipment failed. In particular, the listing alone cannot show disruption to hospital care, library operations or switching-station functions. Readers should distinguish a named location in an outage entry from verified evidence about what happened inside that facility.

What the sources tell us, and what they do not

Listed area
Dinem Toorak, Extension Street and named facilities on Central CWM 3AC10; customer total unknown
Listed start
6 November 2026, 07:06 Pacific/Fiji (5 November, 19:06 UTC)
Operator description
Unplanned outage; undetermined fault; no definite restoration timeframe

Start time and restoration uncertainty

The listed start of 07:06 on 6 November is a Fiji local time. In UTC it falls on the previous date, at 19:06 on 5 November. That conversion describes the same listed start, not a second outage. The page supplies no separate publication or operational observation clock for the entry.

EFL’s description leaves the cause undetermined and offers no definite restoration timeframe. The source check does not turn the listed start into a fresh operational update. A final restoration time and present supply at individual addresses remain unverified; no completion deadline can be inferred from this entry.

Planning for essential devices

The backup essentials guide, internet backup guide and runtime calculator offer general planning context for essential equipment. They help readers consider device needs and battery capacity. They do not report address-level supply, confirm facility operations or estimate how long this network fault will take to resolve.

Privacy
YOUR POWER SETUP

Cookies

May we use Google Analytics cookies to understand which pages are useful? Only with your permission. We do not send calculator entries. You can change your choice below at any time. Cookie policy · Privacy