Your Power Setup
Language and regionEnglish · South AfricaZA
IDBahasa IndonesiaIndonesiaThis page is not availableDKDanskDanmarkThis page is not availableDEDeutschDeutschlandThis page is not availableATDeutschÖsterreichThis page is not availableCHDeutschSchweizThis page is not availableAUEnglishAustraliaThis page is not availableCAEnglishCanadaThis page is not availableINEnglishIndiaThis page is not availableENEnglishInternationalIEEnglishIrelandThis page is not availableNGEnglishNigeriaThis page is not availablePHEnglishPhilippinesThis page is not availableZAEnglishSouth AfricaGBEnglishUnited KingdomThis page is not availableUSEnglishUnited StatesThis page is not availableAREspañolArgentinaThis page is not availableESEspañolEspañaThis page is not availableMXEspañolMéxicoThis page is not availableCAFrançaisCanadaThis page is not availableFRFrançaisFranceThis page is not availableCHFrançaisSuisseThis page is not availableITItalianoItaliaThis page is not availableCHItalianoSvizzeraThis page is not availableNLNederlandsNederlandThis page is not availableNONorsk bokmålNorgeThis page is not availablePLPolskiPolskaThis page is not availableBRPortuguêsBrasilThis page is not availablePTPortuguêsPortugalThis page is not availableFISuomiSuomiThis page is not availableSESvenskaSverigeThis page is not availableTRTürkçeTürkiyeThis page is not availableGRΕλληνικάΕλλάδαThis page is not availableJP日本語日本This page is not available
← Outage news

South Africa / ELECTRICITY SUPPLY

Tshepisong lines A and B power restored, City Power reports

City Power reports full power restoration to customers supplied by Tshepisong Switching Station lines A and B after an outage reported on the evening of 1 November 2026. The operator’s statement covers customers on those two lines in Johannesburg. It does not give the cause, affected-customer total or exact switching time. The restoration report comes from City Power; supply at individual addresses has not been independently checked.

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

Status of this incident

Current status unconfirmed

Last known status: restored, according to the source · City Power reports full restoration to customers supplied by Tshepisong Switching Station lines A and B after the 1 November evening outage.

Source moment: 01 Nov 2026, 21:14 UTC (23:14 local time)

In 20 seconds

  1. City Power reports full restoration to customers supplied by Tshepisong Switching Station lines A and B.

  2. The statement concerns an outage reported on the evening of 1 November 2026.

  3. The cause, customer total, exact outage onset and restoration switching time remain unknown.

Restoration reported for both lines

City Power published its restoration notice at 23:14:33 SAST on 1 November, equivalent to 21:14:33 UTC. It says power has been fully restored to customers supplied by Tshepisong Switching Station lines A and B following the evening outage. This is the publication time of the statement, rather than a verified time at which the network was switched back on.

The reported restoration applies to the customers supplied by the two named lines. The statement provides no complete street list or customer total. It therefore cannot establish the number of people affected or the position at every address in the wider area. No independent address-level audit of electricity supply is available in the checked evidence.

What the sources tell us, and what they do not

Reported scope
Customers supplied by Tshepisong Switching Station lines A and B, Johannesburg
Reported outcome
City Power reports full restoration; no independent address-level verification
Timing
Notice: 1 November 2026, 23:14:33 SAST / 21:14:33 UTC; exact onset and switching time unknown

Cause and outage duration remain unknown

The exact onset of the interruption is unknown, so the duration cannot be calculated from the late-evening announcement. City Power does not give a cause in this notice. Earlier Tshepisong incidents cannot supply the missing explanation: a shared location or line name is insufficient to establish that an older fault caused this evening’s interruption.

The current evidence consists of one operator statement. The restoration claim is attributed to that operator, and no additional independent confirmation is recorded. The checked record supports a restoration report for lines A and B after the 1 November evening outage, while leaving the number of affected connections, the full address footprint and the precise switching times unresolved.

Preparing essential backup power

For household planning, the grid-down essentials guide covers essential backup needs, the internet backup guide covers connectivity, and the runtime calculator helps compare battery capacity with device demand. These resources support preparation; they do not establish the cause or duration of the Tshepisong interruption or verify supply at a particular address.

Privacy
YOUR POWER SETUP

Cookies

May we use Google Analytics cookies to understand which pages are useful? Only with your permission. We do not send calculator entries. You can change your choice below at any time. Cookie policy · Privacy