Sunninghill power outage: Eskom test van investigates cable fault
Eskom reported a cable-fault power outage affecting customers in parts of Sunninghill in a notice published on 25 October 2026. The operator said a test van was on site identifying the fault location, with further updates to follow once it had been located. The statement did not provide a restoration estimate or an affected-customer total.

Status of this incident
Power outage confirmed
Last known status: confirmed by the source · Eskom reports a cable-fault outage in parts of Sunninghill; a test van is identifying the fault location. No restoration estimate or verified restoration is available.
Source moment: 25 Oct 2026, 08:35 UTC (10:35 local time)
In 20 seconds
Eskom’s 25 October notice identifies parts of Sunninghill as affected by a cable-fault outage.
A test van is on site identifying the fault location, according to Eskom.
The exact outage start and customer count are unknown; no restoration estimate is available in the notice.
What Eskom reported for Sunninghill
The operator’s statement was published at 10:35:33 SAST on 25 October, equivalent to 08:35:33 UTC. That timestamp identifies the notice, rather than the start of the electricity interruption. The available statement does not say when individual connections lost supply or establish how long customers had been without power.
Eskom names parts of Sunninghill, without providing street boundaries, a feeder identifier or a verified customer total. The report therefore does not establish an outage across the entire suburb. There is also no supported count of people affected: a customer connection and a person are different measures, and neither total is given here.
What the sources tell us, and what they do not
- Reported area
- Parts of Sunninghill; Eskom Gauteng
- Fault investigation
- Eskom says a test van is identifying the fault location
- Restoration estimate
- Not provided in the 25 October notice
Fault location work and the restoration outlook
Eskom says its test van is on site identifying the fault location. The operator says updates will follow once the location has been identified. That describes the investigation stage in its notice; it does not establish completed repairs or electricity returning to affected connections.
The notice includes no repair-completion time or estimated restoration time. There is no verified restoration in the checked evidence. A possible connection with an older Sunninghill-area report remains unresolved, so the available information does not establish a continuous interruption or a recurrence. There is also no evidence linking this fault to the separate Fourways damaged-cable notice.
Planning while the repair outlook is unknown
The runtime calculator helps estimate battery endurance for essential devices. The internet backup planner and grid-down essentials guide offer preparation context. These resources cannot confirm the supply status of an individual address. A later verified operator update is needed to report restoration or a supported change in the repair outlook.