Language and regionEnglish · South AfricaZA
IDBahasa IndonesiaIndonesiaThis page is not availableDKDanskDanmarkThis page is not availableDEDeutschDeutschlandThis page is not availableATDeutschÖsterreichThis page is not availableCHDeutschSchweizThis page is not availableAUEnglishAustraliaThis page is not availableCAEnglishCanadaThis page is not availableINEnglishIndiaThis page is not availableENEnglishInternationalThis page is not availableIEEnglishIrelandThis page is not availableNGEnglishNigeriaThis page is not availablePHEnglishPhilippinesThis page is not availableZAEnglishSouth AfricaGBEnglishUnited KingdomThis page is not availableUSEnglishUnited StatesThis page is not availableAREspañolArgentinaThis page is not availableESEspañolEspañaThis page is not availableMXEspañolMéxicoThis page is not availableCAFrançaisCanadaThis page is not availableFRFrançaisFranceThis page is not availableCHFrançaisSuisseThis page is not availableITItalianoItaliaThis page is not availableCHItalianoSvizzeraThis page is not availableNLNederlandsNederlandThis page is not availableNONorsk bokmålNorgeThis page is not availablePLPolskiPolskaThis page is not availableBRPortuguêsBrasilThis page is not availablePTPortuguêsPortugalThis page is not availableFISuomiSuomiThis page is not availableSESvenskaSverigeThis page is not availableTRTürkçeTürkiyeThis page is not availableGRΕλληνικάΕλλάδαThis page is not availableJP日本語日本This page is not available
← Outage news

South Africa / ELECTRICITY SUPPLY

Roodepoort outage: repair isolation and conditional midday target

City Power has announced an additional switch-off for Goudrand, parts of Roodepoort CBD and Princess to complete outstanding cable repairs and gradually restore supply. In its 09:23 SAST update on 8 October 2026, the operator says full supply is likely to return by midday if the work proceeds without incident. That is a conditional target; neither the announced switching nor restoration is confirmed by this notice.

Prepared backup equipment arranged in a drawer
AI illustration

Status of this incident

Current status unconfirmed

Last known status: confirmed by the source · 8 October, 09:23 SAST: additional repair isolation announced; midday restoration is a conditional operator target, not confirmed recovery.

Source moment: 08 Oct 2026, 07:23 UTC (09:23 local time)

In 20 seconds

  1. Additional repair isolation is announced for Goudrand, parts of Roodepoort CBD and Princess.

  2. City Power’s midday restoration target depends on work proceeding without incident.

  3. The earlier interruption dates to 6 October; exact onset and customer count remain unknown.

Cable work and an announced isolation

The operator says the additional areas will be switched off shortly so its team can finish cable repairs. The statement describes a planned repair isolation, rather than confirming that the switching operation has already happened. It also describes restoration as gradual. A projected completion time does not establish when individual connections will receive power or whether every address will recover together.

City Power links the ongoing work to an outage on Tuesday, 6 October, following emergency isolation. It identifies Matholesville Change House, Matholesville Kiosk, the Matholesville 11kV overhead line and Nickel Street Wilfordon No 2. The statement also lists Nickel, Leat, Copper, Floride, Platinum and Crescent streets. These named supply points and streets describe the reported scope; they are not a customer total or evidence of an outage across all of Roodepoort.

What the sources tell us, and what they do not

Additional isolation areas
Goudrand, parts of Roodepoort CBD and Princess
Earlier outage scope
Named Matholesville supply points and Wilfordon streets in City Power’s 6 October outage account
Repair status
Outstanding cable repairs; additional switch-off announced, actual switching unconfirmed
Affected customer count
Unknown
Restoration forecast
Midday on 8 October if work proceeds without incident; recovery unconfirmed

Midday remains a conditional forecast

The midday target is explicitly dependent on the work proceeding without incident. The available update does not confirm completed repairs, actual switching times or restored supply. Its 09:23 SAST publication time is the time of the operator notice, not the start of the original outage. Only the date of 6 October is established for that earlier interruption; its exact onset remains unknown.

The affected customer count and individual address boundaries remain unknown. The record does not establish continuity at every address between the original interruption and the additional repair isolation. Residents should therefore distinguish the operator’s named areas and forecast from a confirmed local all-clear. A later operator restoration statement would be needed to report recovery as fact.

Planning backup power

The runtime calculator helps estimate battery needs for essential devices. The internet backup planner covers router and modem power, while the backup essentials guide offers a preparation checklist. These planning tools do not confirm the condition of an individual electricity connection.

Privacy