Your Power Setup
Language and regionEnglish · South AfricaZA
IDBahasa IndonesiaIndonesiaThis page is not availableDKDanskDanmarkThis page is not availableDEDeutschDeutschlandThis page is not availableATDeutschÖsterreichThis page is not availableCHDeutschSchweizThis page is not availableAUEnglishAustraliaThis page is not availableCAEnglishCanadaThis page is not availableINEnglishIndiaThis page is not availableENEnglishInternationalIEEnglishIrelandThis page is not availableNGEnglishNigeriaThis page is not availablePHEnglishPhilippinesThis page is not availableZAEnglishSouth AfricaGBEnglishUnited KingdomThis page is not availableUSEnglishUnited StatesThis page is not availableAREspañolArgentinaThis page is not availableESEspañolEspañaThis page is not availableMXEspañolMéxicoThis page is not availableCAFrançaisCanadaThis page is not availableFRFrançaisFranceThis page is not availableCHFrançaisSuisseThis page is not availableITItalianoItaliaThis page is not availableCHItalianoSvizzeraThis page is not availableNLNederlandsNederlandThis page is not availableNONorsk bokmålNorgeThis page is not availablePLPolskiPolskaThis page is not availableBRPortuguêsBrasilThis page is not availablePTPortuguêsPortugalThis page is not availableFISuomiSuomiThis page is not availableSESvenskaSverigeThis page is not availableTRTürkçeTürkiyeThis page is not availableGRΕλληνικάΕλλάδαThis page is not availableJP日本語日本This page is not available
← Outage news

South Africa / ELECTRICITY SUPPLY

Laser Park power outage: City Power assigns team to faulty termination

City Power says a technical team has been assigned to repair a faulty termination affecting customers in Laser Park, Johannesburg. Its 27 October 2026 notice says 22 affected load centres remain off until repairs are completed. The operator has not provided a verified repair-completion time or a customer total in the checked notices.

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

Status of this incident

Power outage confirmed

Last known status: confirmed by the source · City Power reports 22 Laser Park load centres off pending repairs to a faulty termination; no verified restoration time.

Source moment: 27 Oct 2026, 08:07 UTC (10:07 local time)

In 20 seconds

  1. City Power reports 22 affected load centres in Laser Park, rather than a count of customers or homes.

  2. A technical team has been assigned to repair the faulty termination; completed repairs or restoration are not confirmed.

  3. A separate notice gives an approximate reported time of 18:36 on 26 October. The exact onset remains unknown.

Repair assignment reported by City Power

The operator’s repair notice describes a faulty termination and says the affected load centres will remain off until repairs are completed. Assigning a technical team identifies the reported repair stage. It does not establish that the team has finished the work, or that electricity has returned to affected connections.

The figure of 22 refers specifically to load centres. It cannot be converted into a number of households, businesses or residents from the available evidence. The notices also do not establish that every address in Laser Park is disconnected or that the interruption extends across Johannesburg.

What the sources tell us, and what they do not

Reported area
Laser Park, Johannesburg; Ridge Road Switching Station
Operator impact measure
22 load centres; customer total unknown
Repair stage
Technical team assigned to a faulty termination, City Power says
Restoration time
Not verified

Reported time differs from an exact outage onset

In a separate notice, City Power identifies Ridge Road Switching Station as the supply point for the Laser Park outage. It says the interruption was reported on 26 October 2026 at approximately 18:36. This is the operator’s reported time, rather than an independently verified start for every affected connection.

The caption does not explicitly print a timezone for that reported time, so no timezone conversion is applied here. The exact onset, address-level impact and restoration time remain unverified. Neither the report time nor the later repair assignment supplies a deadline for electricity to return.

Preparing while the duration remains uncertain

For household planning, the grid-down essentials guide helps organise essential devices and supplies. The runtime calculator compares selected device demand with battery capacity, while the internet backup guide covers connectivity planning. These resources support preparation; they do not establish the condition of the local electricity network or predict when this interruption will end.

Privacy
YOUR POWER SETUP

Your privacy, your choice

May we use Google Analytics cookies to understand which pages are useful? Only with your permission. We do not send calculator entries. You can change your choice below at any time. Privacy