Your Power Setup
Language and regionEnglish · South AfricaZA
IDBahasa IndonesiaIndonesiaThis page is not availableDKDanskDanmarkThis page is not availableDEDeutschDeutschlandThis page is not availableATDeutschÖsterreichThis page is not availableCHDeutschSchweizThis page is not availableAUEnglishAustraliaThis page is not availableCAEnglishCanadaThis page is not availableINEnglishIndiaThis page is not availableENEnglishInternationalIEEnglishIrelandThis page is not availableNGEnglishNigeriaThis page is not availablePHEnglishPhilippinesThis page is not availableZAEnglishSouth AfricaGBEnglishUnited KingdomThis page is not availableUSEnglishUnited StatesThis page is not availableAREspañolArgentinaThis page is not availableESEspañolEspañaThis page is not availableMXEspañolMéxicoThis page is not availableCAFrançaisCanadaThis page is not availableFRFrançaisFranceThis page is not availableCHFrançaisSuisseThis page is not availableITItalianoItaliaThis page is not availableCHItalianoSvizzeraThis page is not availableNLNederlandsNederlandThis page is not availableNONorsk bokmålNorgeThis page is not availablePLPolskiPolskaThis page is not availableBRPortuguêsBrasilThis page is not availablePTPortuguêsPortugalThis page is not availableFISuomiSuomiThis page is not availableSESvenskaSverigeThis page is not availableTRTürkçeTürkiyeThis page is not availableGRΕλληνικάΕλλάδαThis page is not availableJP日本語日本This page is not available
← Outage news

South Africa / ELECTRICITY SUPPLY

Harveston and Honeydew power restored after cable fault

City Power reports that electricity has been fully restored to customers in Harveston and Honeydew supplied through Boothill Switching Station in Johannesburg. The operator attributes the outage reported on 27 October 2026 to a cable fault. The exact start of the interruption, switching completion time and affected-customer total remain unknown.

Hillbrow Tower above buildings in Johannesburg
Johannesburg · File photo

Status of this incident

Current status unconfirmed

Last known status: restored, according to the source · City Power reports full restoration in Harveston and Honeydew through Boothill Switching Station after a cable fault.

Source moment: 27 Oct 2026, 22:32 UTC (00:32 local time)

In 20 seconds

  1. City Power reports full restoration for the Harveston and Honeydew customers supplied through Boothill Switching Station.

  2. The operator identifies a cable fault as the cause of the outage reported on 27 October.

  3. The restoration statement does not establish an exact outage duration or verify supply at every individual address.

Operator reports full restoration

City Power’s later update reports full restoration and identifies a cable fault. Its earlier statement described operators on site investigating the outage, with the findings expected to determine repair and restoration plans. The later statement changes the reported position from investigation to restored supply for the customers covered by this Boothill incident.

Harveston and Honeydew are the areas named in the operator’s updates, and Boothill Switching Station is the identified network location. No affected-customer total is established. The restoration report applies to this named incident; it does not establish the supply position across Johannesburg or independently confirm the electricity supply at every address.

What the sources tell us, and what they do not

Named areas
Harveston and Honeydew, Johannesburg
Network location
Boothill Switching Station
Latest operator update
Full restoration reported; cable fault identified
Timing
Restoration statement: 28 October 2026, 00:32 SAST; exact onset and completion unknown

Exact duration remains unknown

The investigation statement was published at 22:26 SAST on 27 October. The restoration statement followed at 00:32 SAST on 28 October. These are publication times, rather than a verified start and end for the interruption. The exact onset and switching completion time remain unknown, so the interval between the statements is not presented as the outage duration.

Technical continuity with earlier Honeydew events on 8 and 19 October, or with an afternoon notice on 27 October, remains unverified. Those reports cannot supply a start time for this Boothill interruption. The full-restoration statement is attributed to City Power and does not establish that every earlier Honeydew fault has been resolved.

Household backup planning

The grid-down essentials guide helps organise essential devices and supplies. The runtime calculator compares device demand with battery capacity, while the internet backup guide covers connectivity planning. These resources can help households prepare for future interruptions. They do not verify an individual connection or change the scope of the operator’s restoration statement.

Privacy
YOUR POWER SETUP

Cookies

May we use Google Analytics cookies to understand which pages are useful? Only with your permission. We do not send calculator entries. You can change your choice below at any time. Cookie policy · Privacy