Freedom Park South power outage: investigation planned
City Power reports a power outage affecting customers in Freedom Park South in Johannesburg, supplied by Goldev Switching Station. Its statement on 2 November 2026 says operators have been notified and will be dispatched to investigate. The cause, exact outage start and restoration time remain unknown.

Status of this incident
Current status unconfirmed
Last known status: confirmed by the source · City Power reports an outage in Freedom Park South on the Goldev supply network; dispatch is planned and no cause or restoration estimate is confirmed.
Source moment: 02 Nov 2026, 15:42 UTC (17:42 local time)
In 20 seconds
The operator names Freedom Park South and Goldev Switching Station as the affected supply area.
Operators have been notified and will be dispatched to investigate, according to City Power.
No affected-customer count, confirmed cause or restoration estimate is available.
What the operator has reported
City Power published its acknowledgement at 17:42:12 South African Standard Time on 2 November, equivalent to 15:42:12 UTC. This is the time of the announcement, rather than a verified start time for the interruption. An exact outage duration cannot be calculated from the statement.
The notice identifies customers in Freedom Park South supplied by Goldev Switching Station. It provides no complete street list or affected-customer count. The announcement establishes a reported local interruption within that named supply area; it does not establish that every connection served by Goldev or every home in the neighbourhood has lost electricity.
What the sources tell us, and what they do not
- Named area
- Freedom Park South; Goldev Switching Station; Johannesburg
- Operator response
- Operators notified; dispatch planned to investigate
- Announcement
- 2 November 2026, 17:42:12 SAST / 15:42:12 UTC; outage onset unknown
Dispatch planned; restoration time unknown
The utility says operators have been notified and will be dispatched to investigate. That wording describes a planned response. It does not confirm that a team has arrived, identified a fault, started repairs or begun switching. There is no verified technical explanation for the interruption in the available notice.
No restoration estimate or completed restoration has been established for this incident. The investigation plan therefore cannot be converted into a repair deadline. Complaints from other Johannesburg areas also do not establish a shared fault or a citywide interruption. A subsequent dated update identifying Freedom Park South or the Goldev supply connection would be needed to confirm progress.
Keeping essential devices supplied
While the recovery timetable remains unclear, readers can use the grid-down essentials guide, internet backup guide and runtime calculator to assess essential devices and available battery capacity. These planning tools cannot confirm the electricity status of an individual property or predict the network restoration time. The operator statement remains the basis for the incident information above.