Language and regionEnglish · South AfricaZA
IDBahasa IndonesiaIndonesiaThis page is not availableDKDanskDanmarkThis page is not availableDEDeutschDeutschlandThis page is not availableATDeutschÖsterreichThis page is not availableCHDeutschSchweizThis page is not availableAUEnglishAustraliaThis page is not availableCAEnglishCanadaThis page is not availableINEnglishIndiaThis page is not availableENEnglishInternationalIEEnglishIrelandThis page is not availableNGEnglishNigeriaThis page is not availablePHEnglishPhilippinesThis page is not availableZAEnglishSouth AfricaGBEnglishUnited KingdomThis page is not availableUSEnglishUnited StatesThis page is not availableAREspañolArgentinaThis page is not availableESEspañolEspañaThis page is not availableMXEspañolMéxicoThis page is not availableCAFrançaisCanadaThis page is not availableFRFrançaisFranceThis page is not availableCHFrançaisSuisseThis page is not availableITItalianoItaliaThis page is not availableCHItalianoSvizzeraThis page is not availableNLNederlandsNederlandThis page is not availableNONorsk bokmålNorgeThis page is not availablePLPolskiPolskaThis page is not availableBRPortuguêsBrasilThis page is not availablePTPortuguêsPortugalThis page is not availableFISuomiSuomiThis page is not availableSESvenskaSverigeThis page is not availableTRTürkçeTürkiyeThis page is not availableGRΕλληνικάΕλλάδαThis page is not availableJP日本語日本This page is not available
← Outage news

South Africa / ELECTRICITY SUPPLY

Aeroton and Ormonde power outage: City Power reports full restoration

City Power reports that power supply has been fully restored in Aeroton and Ormonde following the Showground Switching Station outage. Its 14:21 SAST statement on 9 October attributes the interruption to a faulty cable and says it was reported on Thursday, 8 October. The operator’s restoration announcement supersedes the morning notice that eight load centres remained off.

Johannesburg skyline with illuminated buildings in the evening
Johannesburg · File photo

Status of this incident

Current status unconfirmed

Last known status: restored, according to the source · 9 October, 14:21 SAST: City Power reports full supply restored in Aeroton and Ormonde after a faulty cable.

Source moment: 09 Oct 2026, 12:21 UTC (14:21 local time)

In 20 seconds

  1. City Power reports full power supply restoration in Aeroton and Ormonde on 9 October.

  2. The operator attributes the outage, reported on 8 October, to a faulty cable.

  3. Exact onset, final switching time and affected customer count remain unknown.

Full restoration reported at Showground

The latest notice reports full supply restoration for this Showground event. It does not identify the exact switching time, provide an affected customer total or verify electricity at every individual address. The bulletin concerns Aeroton and Ormonde, rather than all of Johannesburg. Separate local faults may still affect individual connections, so the area-level restoration statement cannot establish an address-level all-clear.

City Power describes a faulty cable as the cause in its restoration announcement. Earlier notices referred to multiple faults and an access challenge at Adcock Ingram. The latest statement does not explain the detailed repair sequence or reconcile those descriptions. They should remain attributed reports from different stages of the response, rather than evidence of a new interruption or a complete technical account.

What the sources tell us, and what they do not

Affected areas
Aeroton and Ormonde; Johannesburg
Operator restoration report
Full power supply restored, according to City Power’s 9 October notice
Earlier repair response
Earlier eight load centres awaited fault location and repair; later full restoration reported
Affected customers
Count unknown
Cause
Faulty cable, according to City Power; earlier updates referred to multiple faults
Restoration report
Full supply restored; exact final switching time not stated

Earlier partial restoration and access delays

At 23:19 SAST on 8 October, City Power reported 37% power supply restoration in Aeroton and Ormonde, with operators on site and repairs ongoing. That figure has no stated denominator and cannot be converted into customers, homes or people. It is now a historical progress report, rather than the latest supply position. The exact outage onset remains unknown; the operator described an interruption earlier that evening.

At 05:09 SAST on 9 October, City Power said eight load centres would remain off until access was gained at Adcock Ingram. Its 08:51 SAST follow-up said fault location would continue once access was granted and the centres would remain off until faults were located and repaired. These were work conditions at the time, not current unresolved prerequisites after the later full-restoration notice. The centres and their connection totals were not listed.

Planning essential backup power

The runtime calculator compares essential device demand with battery capacity. The internet backup planner covers router and modem power, while the backup essentials guide offers a preparation checklist. These tools help with backup planning; they cannot confirm local supply or predict when repairs will finish.

Privacy