Darwin power outage: operator reports supply restored in three suburbs
Power and Water reports that electricity was restored at 10:20 ACST on 19 October 2026 after a network outage affecting customers in Wanguri, Wagaman and Casuarina in Darwin. The operator marks the incident Resolved. Its earlier 11:00 ACST restoration estimate has been superseded by that report; the affected customer count and technical cause remain unknown.

Status of this incident
Restoration confirmed
Last known status: restored, according to the source · Power and Water reports power restored at 10:20 ACST on 19 October in Wanguri, Wagaman and Casuarina and marks the incident Resolved.
Source moment: 19 Oct 2026, 12:50 am UTC (10:20 am local time)
In 20 seconds
The operator identifies an outage affecting customers in Wanguri, Wagaman and Casuarina; the extent within each suburb is unknown.
Power and Water reports restoration at 10:20 ACST and marks this incident Resolved.
The 11:00 ACST estimate in the earlier 08:36 update is historical, superseded by the restoration report.
Restoration reported for the three named suburbs
The Power and Water outage listing names Wanguri, Wagaman and Casuarina. Its latest rendered notice reports that power has been restored and labels the same incident Resolved. This updates the existing network interruption rather than establishing a separate outage. The statement applies to this named incident; it does not establish the status of separate outages elsewhere in the Northern Territory.
The notice does not provide an affected-customer total or an exact address list. It therefore does not establish that every property in the three suburbs lost electricity, or that Darwin as a whole experienced a blackout. Restoration is the operator report for this incident, without an independent check of individual connections. The technical cause remains unknown in the checked record.
What the sources tell us, and what they do not
- Reported areas
- Wanguri, Wagaman and Casuarina, Darwin
- Affected customers
- Number and exact addresses unknown
- Repair update
- Historical 08:36 ACST update: repairs continuing
- Reported restoration
- 19 October, 10:20 ACST: power restored, according to Power and Water; incident marked Resolved
From the initial estimate to reported restoration
The listed start time is 06:12 ACST on 19 October, equivalent to 20:42 UTC on 18 October. At 08:36 ACST, Power and Water said repairs were continuing and estimated restoration at 11:00 ACST. That was a forecast issued during repairs. It should now be read as part of the incident history, rather than as a pending restoration target.
The subsequent restoration time is 10:20 ACST on 19 October, equivalent to 00:50 UTC that day. The exact publication time of the restoration wording is unknown. An earlier text extraction of the operator URL lagged behind its rendered restoration report. The latest checked extraction now also contains the restoration wording and Resolved label. The earlier version remains in the evidence history; this reconciliation does not establish a separate outage or a new restoration time.
Planning essential backup power
For household preparation, the outage essentials guide offers a checklist. The runtime calculator helps estimate battery support for selected devices, while the internet backup guide covers communications planning. These tools support equipment choices; they cannot predict the network repair time or confirm the supply status of an address.